Bolthole Index

Green County, Wisconsin

Zoning, building permits and septic rules in Village of New Glarus, Wisconsin

Village of New Glarus is a village in Green County, Wisconsin. Village of New Glarus adopts its own zoning, so inside its limits Village of New Glarus’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Green County page.

Answers from the rulebook for Village of New Glarus

Village of New Glarus’s own rules

  • Local zoningPresent

    All land within the corporate limits of New Glarus village

    • Zoning permit required for new structures or uses, plus compliance with other local, county and state regulations
    “the jurisdiction of this chapter shall apply to all structures, lands, water and air within the corporate limits of the village of new glarus.”
  • Zoning districtsPublished

    Zoning districts inside New Glarus village

    • Districts: R-1, R-2 mobile home, A agricultural, C-1, C-2, I, CON, H, S, PUD, SDO
    • Map titled Zoning District Map, adopted June 2, 1996, as amended; on file with clerk-treasurer
    • Annexed land is classified agricultural pending rezoning
    “the village of new glarus is hereby divided into the following zoning districts: (1) r-1 residence district. (2) r-2 mobile home residence district.”
  • Minimum dwelling sizeSpecified

    Multifamily housing in R-1 Residence District inside New Glarus village; no single-family minimum floor area was located

    • Single-family minimum floor area not found in text reviewed

    minimum floor area per dwelling unit: >= 720 square feet

    “minimum floor area per dwelling unit: 720 square feet.”
  • Minimum lot sizeSpecified

    R-1 Residence District, one-family building, inside New Glarus village

    • More than one family: 3,300 sq ft per additional dwelling unit and lot at least 80 feet wide
    • Zero lot line structures may adjust dimensional standards (§ 305-106)

    minimum lot area (one family): >= 6600 square feet · minimum lot width: >= 60 feet

    “every building hereafter erected or structurally altered for occupancy by one family shall provide a lot area of not less than 6,600 square feet and lot width of not less than 60 feet”
    One more reviewed finding on this topic
  • SetbacksSpecified

    R-1 Residence District inside New Glarus village

    • Front setback may follow average of nearest two existing principal structures where 50% or more of block is less than 25 feet
    • Side yards: sum 15 ft (5 ft minimum single) for buildings up to 1 1/2 stories; sum 20 ft (8 ft minimum) above 1 1/2 stories
    • Accessory building rear yard 3 feet

    front yard setback: >= 25 feet (averaging rule) · rear yard setback, principal building: >= 25 feet

    “unless otherwise provided, there shall be a setback line of not less than 25 feet from the property line”
    One more reviewed finding on this topic
  • Building heightSpecified

    R-1 Residence District inside New Glarus village

    • Multifamily housing in R-1: maximum 65 feet

    maximum height: <= 35 feet (or 2 1/2 stories) (multifamily 65 feet)

    “buildings hereafter erected or structurally altered shall exceed neither 35 feet nor 2 1/2 stories in height.”
    One more reviewed finding on this topic

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of New Glarus or Green County directly.

  • Building permit — New Glarus village
  • Owner-builder exemption — New Glarus village
  • Building code adopted — New Glarus village
  • Inspections — New Glarus village
  • Certificate of occupancy — New Glarus village
19 more unanswered
  • Lot coverage
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees
  • Permit process

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of New Glarus publishes no rule on the point, not that none exists. Green County’s page lists the county offices to call.

← All of Green County: county rules, score and offices