Grant County, Wisconsin
Village of Montfort is a village in Grant County, Wisconsin. Village of Montfort adopts its own zoning, so inside its limits Village of Montfort’s rules apply, not the county’s. 18 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Grant County page.
Altering, adding to or building new buildings within Chapter 14 scope inside Montfort village
“if a person alters a building, adds to, or builds or constructs a new building, within the scope of this ordinance, they shall first obtain a building permit for such work from the building inspector.”
Buildings within the scope of Chapter 14 inside Montfort village
“the wisconsin uniform dwelling code, chs. sps 320-325 of the wisconsin administrative code, and all amendments thereto, is adopted and incorporated by reference and shall apply to all buildings within the scope of this ordinance.”
Construction within Chapter 14 scope inside Montfort village
completion deposit: 400 USD (projects costing $15,000 or more)
“there is hereby created the position of building inspector, who shall administer and enforce this ordinance and shall be certified by the department of safety and professional services, as specified by wis. stat. sec. 101.66 (2), in the category of uniform dwelling code construction inspector.”
Buildings within Chapter 14 scope inside Montfort village
“no person may have occupancy of a building until an occupancy permit is issued.”
All land and water within Montfort village limits
“the jurisdiction of this chapter shall include all lands and waters within the corporate limits of the village of montfort.”
Montfort village zoning districts
“for the purposes of this chapter, the village of montfort is hereby divided into the following zoning districts: r-1 r-2 r-3 c-1 m-1 a-1 a-2 con”
R-1 single-family residential district, Montfort village
minimum floor area: >= 960 square feet
“percent of lot coverage maximum 30% minimum floor area 960 square feet minimum dwelling width 18 feet”
A-1 agricultural district, Montfort village
minimum lot area: >= 10 acres (20,000 sq ft conditional-use family residence)
“minimum lot width 500 feet minimum lot area 10 acres”
“minimum lot width 65 feet minimum lot area for single family 8,500 square feet minimum lot area for twofamily 12,500 square feet”
R-1 single-family residential district, Montfort village
front yard: >= 25 feet · rear yard, principal: >= 25 feet · side yard, principal: >= 8 feet each side (20 total)
“minimum front yard setback 25 feet from the edge of the street r.o.w. line corner lots have two front yards.”
“minimum front yard setback 50 feet from the edge of the street r.o.w. line minimum rear yard setback 50 feet minimum side yard setback principal buildings: 20 feet accessory buildings: 10 feet”
R-1 single-family residential district, Montfort village
maximum lot coverage: <= 30 percent
“percent of lot coverage maximum 30% minimum floor area 960 square feet”
R-1 single-family residential district, Montfort village
maximum building height: <= 35 feet
“maximum building height 35 feet minimum front yard setback 25 feet from the edge of the street r.o.w. line”
“maximum building height 35 feet minimum front yard setback 50 feet from the edge of the street r.o.w. line”
Mobile and manufactured homes as permanent residences inside Montfort village
“no mobile homes (other than presently existing mobile homes and their manufactured home replacements) shall be permitted to be used as permanent residences within the village unless they are located in a mobile home court.”
New residential structures inside Montfort village (zoning permit application requirement)
“sewage disposal. all new residential structures shall be served by the public sewer system.”
Building permits inside Montfort village
state seal: 33 USD (new dwellings)
“building permit fees shall be determined by resolution and adjusted from time to time.”
Zoning permits inside Montfort village
decision deadline: <= 30 days
“zoning permit shall be granted or denied in writing by the zoning administrator within thirty (30) days. the permit shall expire within six (6) months unless substantial work has commenced.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Montfort or Grant County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Montfort publishes no rule on the point, not that none exists. Grant County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Montfort means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.