Bolthole Index

Grant County, Wisconsin

Zoning, building permits and septic rules in Boscobel, Wisconsin

Boscobel is a city in Grant County, Wisconsin. Boscobel adopts its own zoning, so inside its limits Boscobel’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Grant County page.

Answers from the rulebook for Boscobel

Boscobel’s own rules

  • Local zoningPresent

    Land inside Boscobel city limits

    • Chapter 17 recreated by Ordinance 2025-05; original zoning ordinance publication date 1982-09-23
    “this chapter shall be known as, referred to, or cited as the "zoning ordinance, city of boscobel, wisconsin."”
  • Zoning districtsPublished

    Boscobel city zoning districts (R-1A, R-1, R-2, MH, B-1, B-2, B-3, M-1, M-2, AT, PUD, C, CD)

    • Zoning map available on city permits page
    “r-1a rural residential district 17 r-1 single family residential district 18 r-2 multifamily residential district 19 mh - residential mobile home park district 21”
  • Minimum dwelling sizeSpecified

    R-1 single family residential district, inside Boscobel city

    • Excludes basement
    • Principal structure at least 24 feet wide

    minimum floor area: >= 1000 sq ft · minimum principal structure width: >= 24 ft

    “all dwellings will have a minimum floor area of 1,000 square feet, excluding the basement, and the principal structure shall be at least 24 feet in width.”
    One more reviewed finding on this topic
  • Minimum lot sizeSpecified

    R-1 single family residential district, inside Boscobel city

    • Dwellings must be on a permanent foundation meeting ILHR 21.18

    minimum lot area: >= 6000 sq ft · minimum lot width: >= 60 ft

    “lots shall be at least 6,000 square feet in area and at least 60 feet in width.”
    One more reviewed finding on this topic
  • SetbacksSpecified

    R-1 single family residential district, inside Boscobel city

    • Accessory buildings other than garages go in rear yard, not nearer than 3 feet to any lot line
    • Detached garages may be in a side yard if 25 ft front and 10 ft side setbacks are met

    front yard: >= 25 ft · rear yard: >= 25 ft · side yard: >= 10 ft

    “(4) minimum yards. front and rear yards, 25 feet; side yards, 10 feet.”
    One more reviewed finding on this topic
  • Lot coverageSpecified

    R-1A rural residential district, inside Boscobel city

    • No building coverage figure located in the R-1 section

    maximum building coverage: <= 30 percent

    “(5) maximum building height: 2-1/2 stories or 35'. (6) maximum building coverage: 30%.”
  • Building heightSpecified

    R-1A rural residential district, inside Boscobel city

    • Accessory buildings max 15 ft high
    • Exemptions for architectural projections and special structures under 17.60

    maximum building height: <= 35 ft (or 2-1/2 stories)

    “(5) maximum building height: 2-1/2 stories or 35'.”
  • Permit processPartial

    City permit applications inside Boscobel city

    • Applications returned to city office with fees
    • Zoning permit applications go to the zoning administrator
    “zoning permits shall be required for all new structures, exterior renovation, demolition, placement of signs and changes in land use unless specifically excepted by this chapter.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Boscobel or Grant County directly.

  • Building permit — Building permits inside Boscobel city
  • Owner-builder exemption — Owner-builder exemption inside Boscobel city
  • Building code adopted — Building code inside Boscobel city
  • Inspections — Building inspection inside Boscobel city
  • Certificate of occupancy — Certificate of occupancy inside Boscobel city
17 more unanswered
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Boscobel publishes no rule on the point, not that none exists. Grant County’s page lists the county offices to call.

← All of Grant County: county rules, score and offices