Grant County, Wisconsin
Boscobel is a city in Grant County, Wisconsin. Boscobel adopts its own zoning, so inside its limits Boscobel’s rules apply, not the county’s. 11 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Grant County page.
Land inside Boscobel city limits
“this chapter shall be known as, referred to, or cited as the "zoning ordinance, city of boscobel, wisconsin."”
Boscobel city zoning districts (R-1A, R-1, R-2, MH, B-1, B-2, B-3, M-1, M-2, AT, PUD, C, CD)
“r-1a rural residential district 17 r-1 single family residential district 18 r-2 multifamily residential district 19 mh - residential mobile home park district 21”
R-1 single family residential district, inside Boscobel city
minimum floor area: >= 1000 sq ft · minimum principal structure width: >= 24 ft
“all dwellings will have a minimum floor area of 1,000 square feet, excluding the basement, and the principal structure shall be at least 24 feet in width.”
“all detached single family residences shall have a minimum floor area of at least 1,000 square feet”
R-1 single family residential district, inside Boscobel city
minimum lot area: >= 6000 sq ft · minimum lot width: >= 60 ft
“lots shall be at least 6,000 square feet in area and at least 60 feet in width.”
“(3) minimum lot area and width. 1 acre; 100' width.”
R-1 single family residential district, inside Boscobel city
front yard: >= 25 ft · rear yard: >= 25 ft · side yard: >= 10 ft
“(4) minimum yards. front and rear yards, 25 feet; side yards, 10 feet.”
“(4) minimum yards. front 25'; side 10'; rear 35'.”
R-1A rural residential district, inside Boscobel city
maximum building coverage: <= 30 percent
“(5) maximum building height: 2-1/2 stories or 35'. (6) maximum building coverage: 30%.”
R-1A rural residential district, inside Boscobel city
maximum building height: <= 35 ft (or 2-1/2 stories)
“(5) maximum building height: 2-1/2 stories or 35'.”
City permit applications inside Boscobel city
“zoning permits shall be required for all new structures, exterior renovation, demolition, placement of signs and changes in land use unless specifically excepted by this chapter.”
We looked and could not find an official answer yet. Silence is not permission; ask Boscobel or Grant County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Boscobel publishes no rule on the point, not that none exists. Grant County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Boscobel means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.