Grant County, Wisconsin
Town of Beetown is a town in Grant County, Wisconsin. Septic permits inside Town of Beetown come from Grant County (Grant County Conservation, Sanitation & Zoning Department · (608) 723-6080). 8 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Grant County page.
Town of Beetown does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New one- and two-family dwelling units, including manufactured-home installations, inside Beetown town.
“A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
New one- and two-family dwelling units constructed inside Beetown town under a UDC permit.
“The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
Private onsite wastewater treatment systems serving land inside Beetown town.
“A sanitary permit application and design plan shall be submitted for review with all appropriate documentation per Article IV, §§ 225-25 and 225-26 and Article VI with review fees to the Grant County CS&Z Department.”
POWTS installation, component replacement, modification, renewal, revision, transfer, or plumber change inside Beetown town.
“A state sanitary permit is required for every POWTS installation, component replacement or system modification and every renewal, revision, transfer or change of plumber to an existing sanitary permit. Each shall require a separate and individual application.”
Installed POWTS, POWTS components, vault privies, and sanitary devices inside Beetown town.
permit installation period: 2 years (If not installed, inspected, and approved before expiration, renewal is required.)
“If the POWTS, POWTS component, vault privy or sanitary device is not installed, inspected, and approved by the Grant County Conservation, Sanitation and Zoning Department, the permit for the installation shall expire two years from the date of issuance.”
Vault-privy nonplumbing sanitation systems inside Beetown town.
“Vault, privy permit. A Grant County vault privy nonplumbing sanitation system permit application shall be prepared and submitted per Article IV, §§ 225-25 and 225-26, with the following:”
Wisconsin Well Construction Notifications for new private wells inside Beetown town.
well construction notification fee: 50.5 USD (Notification fee only.)
“The Well Construction Notification fee is $50.50. A Heat Exchange Notification has no fee. The fee and notification number are not refundable or transferable.”
Applications for new UDC-covered one- and two-family dwellings inside Beetown town.
“Regardless of which agency has authority, your application must include: 1. Permit application. This may be electronic or paper, depending on the agency. 2. Contractor license numbers and expiration dates. 3. Legible building plans with scale or dimensions.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Beetown or Grant County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Beetown publishes no rule on the point, not that none exists. Grant County’s page lists the county offices to call.