Zoning, building permits and septic rules in Village of Fall Creek, Wisconsin
Village of Fall Creek is a village in Eau Claire County, Wisconsin. Village of Fall Creek adopts its own zoning, so inside its limits Village of Fall Creek’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Eau Claire County page.
Answers from the rulebook for Village of Fall Creek
Village of Fall Creek’s own rules
Building permitRequired
Building, plumbing and electrical work inside Fall Creek village
Permit fees and any unpaid village charges on the parcel must be paid before issuance.
A permit lapses if work does not commence within six months of issuance.
Downtown business area exterior work goes through a downtown business review.
“no building, plumbing or electrical work shall be performed in the village of fall creek unless a permit therefore is obtained as required in the provisions of this chapter.”
Building code adoptedAdopted
New one- and two-family dwellings and additions/alterations inside Fall Creek village
Village adopts its own one- and two-family dwelling code (UDC) in Chapter 118, section 118.1.3; commercial and public building provisions are in 118.1.2 and 118.1.12 and were not reviewed in detail.
“this section shall be known as the "one- and two-family dwelling code of the village of fall creek."”
Local zoningPresent
Land inside Fall Creek village limits
Administered through a zoning administrator, zoning board of appeals, plan commission and village board; a zoning amendment (2026-0414) is listed as a first reading on the ordinances page.
“this chapter shall be known, cited, and referred to as the "village of fall creek zoning ordinance."”
Zoning districtsPublished
Zoning districts inside Fall Creek village
Districts seen in the schedule: R1, R1A, R2, R2-TH, R3, R4, R5, UT (residential) and C1, C2, DBD, IND, A1, A2, PPD (commercial and other).
“16.2.7 residential districts 21 16.2.8 commercial districts 23 16.2.9 schedules of zoning uses and requirements 28”
Permit processPublished
Building permit applications inside Fall Creek village
Allow at least 5 business days for processing because the building inspector has limited office hours.
A sketch showing the project and its distance to lot lines and other structures is required.
Additional requirements apply in the downtown business district.
“building permits can be obtained at the administration office. see the documents page for application forms.”
Still unanswered
We looked and could not find an official answer yet. Silence is not permission; ask Village of Fall Creek or Eau Claire County directly.
Owner-builder exemption — Owner-builders inside Fall Creek village
Inspections — Inspections of construction inside Fall Creek village
Certificate of occupancy — Occupancy of new buildings inside Fall Creek village
Minimum dwelling size — Dwellings in Fall Creek residential districts
Minimum lot size — Residential districts R1, R1A, R2, R2-TH, R3, R4, R5 in Fall Creek village
20 more unanswered
Setbacks
Lot coverage
Building height
Living in an RV
Camping on your land
Tiny homes
Manufactured homes
Accessory dwellings
Who permits septic
Septic permit
Septic inspection
Off-grid sanitation
Well permit
Mandatory utility hookup
Agricultural exemption
Subdividing land
Driveway access
Building in a floodplain
Short-term rentals
Permit fees
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Fall Creek publishes no rule on the point, not that none exists. Eau Claire County’s page lists the county offices to call.