Douglas County, Wisconsin
Town of Parkland is a town in Douglas County, Wisconsin. Septic permits inside Town of Parkland come from Douglas County. 10 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Douglas County page.
Town of Parkland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
One- and two-family dwelling construction inside Parkland town.
applicable rules: SPS 320-325
“Each town has created an ordinance or resolution outlining the permitting process to include application, plan review, and inspections required in the Code.”
UDC-covered dwelling construction inside Parkland town.
“Each town has created an ordinance or resolution outlining the permitting process to include application, plan review, and inspections required in the Code.”
Land inside Parkland town subject to Douglas County land-use permitting.
“An ordinance regulating and restricting the location, construction and use of buildings, structures, and the use of land in the unincorporated portions of Douglas County”
Mobile-home placement inside Parkland town subject to Douglas County zoning.
mobile-home land-use fee: 300 USD (Pre-1976 model requires conditional use permit.)
“Mobile Home (pre-1976 model requires conditional use permit) 300”
Private onsite wastewater systems for new dwellings inside Parkland town.
“A septic system permit (unless the property is served by a municipal sewer system) from the Douglas County Zoning Office”
New dwellings using private onsite wastewater systems inside Parkland town.
holding-tank sanitary permit fee: 465 USD (Includes plan review, state fee, recording fee & inspection.) · other-system sanitary permit fee: 435 USD (Conventional, mound, in-ground pressurized, at-grade, and experimental systems.)
“A septic system permit (unless the property is served by a municipal sewer system) from the Douglas County Zoning Office”
Permitted onsite wastewater systems inside Parkland town.
return inspection fee: 100 USD (Other than what is required for normal installation.)
“Return Inspection (other than what is required for normal installation) 100”
Land division inside Parkland town subject to Douglas County subdivision control.
plat review fee: 170 USD (Includes Register of Deeds recording fee.) · preliminary zoning committee approval: per 20 USD (Per lot.) · final zoning committee approval: per 10 USD (Per lot.)
“8.0 - Zoning Ordinance [...] 8.1 - Subdivision Control Ordinance and Amendments [...] 8.2 - Private Sewage System Ordinance”
Douglas County land-use and sanitary permits affecting development inside Parkland town.
one- or two-family dwelling land-use fee: 300 USD (Year-round or seasonal.)
“Failure to obtain the necessary permits will result in a double permit fee and / or citation. [...] No refunds after permit(s) have been issued”
New-dwelling development inside Parkland town subject to Douglas County processing.
“The permitting process for a new dwelling in Douglas County requires:”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Parkland or Douglas County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Parkland publishes no rule on the point, not that none exists. Douglas County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Parkland means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.