Douglas County, Wisconsin
Town of Maple is a town in Douglas County, Wisconsin. Septic permits inside Town of Maple come from Douglas County. 11 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Douglas County page.
Town-issued building permits inside Maple town
“the town of maple does not issue building permits at this time.”
New one- and two-family residences inside Maple town
“all new 1 and 2 family residences must be inspected for compliance with the uniform dwelling code by inspector rob llc, our building inspector.”
Driveway installation inside Maple town
“if you are installing a driveway, please be sure to submit a driveway permit.”
Driveway permit process inside Maple town; general building permit process is handled by Douglas County
“complete the site drawing and form and return it to the town clerk.”
Town of Maple does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New one- and two-family residences in Maple town, under the Uniform Dwelling Code as applied by the town
“all new 1 and 2 family residences must be inspected for compliance with the uniform dwelling code by inspector rob llc, our building inspector.”
Land inside Maple town (an unincorporated town in Douglas County) to the extent no town zoning ordinance applies; the county ordinance is the candidate rule, not a Maple town ordinance
“an ordinance regulating and restricting the location, construction and use of buildings, structures, and the use of land in the unincorporated portions of douglas county”
County zoning districts in the unincorporated portions of Douglas County, including land inside Maple town where no town zoning applies
“the unincorporated areas of douglas county are hereby divided into the following types of districts”
Private onsite wastewater (septic) systems for dwellings on land inside Maple town
“the county land services director or designee shall not hereafter authorize a building to be erected, structurally altered, or relocated which has a private waste disposal system unless the plans for the system have been reviewed in accordance with the provisions of the douglas county sanitary code, and a sanitary permit has been issued.”
New dwellings with a private waste disposal system on land inside Maple town
“the county land services director or designee shall not hereafter authorize a building to be erected, structurally altered, or relocated which has a private waste disposal system unless the plans for the system have been reviewed in accordance with the provisions of the douglas county sanitary code, and a sanitary permit has been issued.”
Residential use where the home is not connected to a public water system, on land inside Maple town
“where connection is not to be made to a public water system, no residential use shall be permitted unless provision is made for a safe and adequate supply of drinking water located on the premises, a permit for which has been obtained in accordance with the provisions of the douglas county sanitary code.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Maple or Douglas County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Maple publishes no rule on the point, not that none exists. Douglas County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Maple means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.