Bolthole Index

Dodge County, Wisconsin

Zoning, building permits and septic rules in Town of Herman, Wisconsin

Town of Herman is a town in Dodge County, Wisconsin. Town of Herman adopts its own zoning, so inside its limits Town of Herman’s rules apply, not the county’s. Septic permits inside Town of Herman come from Dodge County (Dodge County Land Resources and Parks Department - Septic Systems · 920-386-3703). 21 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Dodge County page.

Answers from the rulebook for Town of Herman

Town of Herman’s own rules

  • Building permitRequired

    Parking a mobile home for occupancy or changing its location inside the Town of Herman.

    • Application is made to the Building Inspector.
    • The rule does not establish a general permit rule for every type of residential construction in the cited passage.
    “No person shall park a mobile home for occupancy or change its location within the Town without first obtaining a building permit from the Town of Herman. Such permit may be obtained by application to the Building Inspector.”
  • Building code adoptedAdopted (with conditions)

    Construction activity inside the Town of Herman.

    • The incorporated Wisconsin Administrative Code chapters and subsequent revisions apply; listed chapters include SPS 316, SPS 320 through 325, SPS 326, SPS 361 through 366, SPS 367, SPS 375 through 379, and SPS 381 through 387.
    “Wisconsin Administrative Code chapters adopted. The following chapters of the Wisconsin Administrative Code and subsequent revisions pertaining to construction activity are adopted by reference for municipal enforcement and incorporated herein:”
  • InspectionsLimited

    Work subject to the Town's Uniform Dwelling Code enforcement inside Herman town.

    • The Building Inspector or authorized certified agent may inspect at reasonable hours.
    • If access is denied, the Building Inspector may seek an inspection warrant from Circuit Court.
    “The Building Inspector or an authorized certified agent may at all reasonable hours enter upon any public or private premises for inspection purposes and may require the production of the permit for any building, plumbing, electrical or heating work.”
  • Certificate of occupancyLimited

    Existing occupied mobile homes seeking Town approval inside Herman town.

    • The mobile home must be 10 years old or less based on unit manufacture date.
    • The Building Inspector may approve after satisfactory inspection report elements.
    • If a problem is corrected within three months and a second inspection verifies correction, an occupancy permit may be issued.
    “If a problem was found and corrected within three months, and a second inspection verified the correction(s), an occupancy permit may be issued by the Building Inspector.”
  • Local zoningPresent (with conditions)

    Land inside the Town of Herman, Wisconsin.

    • Uses must conform to the regulations of the district in which the land is located.
    “No building, structure or use of land shall hereafter be initiated or altered except in conformity with the regulations specified for the district in which it is located.”
  • Zoning districtsPublished (with conditions)

    Land inside Herman town, as shown on the official zoning map.

    • The official zoning map and certified amendments are part of the chapter and are available at the Town Clerk's office.

    districts: CO Conservancy; A-1 Farmland Preservation; A-2 General Agricultural; R-1 Single-Family Residential; R-2 General Residential; P-1 Park/Recreational; B-1 Business/Commercial; M-1 Manufacturing/Industrial

    “For the purpose of this chapter, the following primary use districts are hereby established with the Town of Herman:”
  • Minimum lot sizeDistrict specific (with conditions)

    Lots in the A-1 Farmland Preservation District inside Herman town.

    • Except as otherwise specifically required or permitted.
    • All lots created must conform to § 384-55.

    minimum lot area: >= 1.5 acres (Except as otherwise specifically required or permitted.) · minimum lot width at building line: >= 150 feet · minimum lot width at water's edge: >= 150 feet

    “Minimum area and width. Except as otherwise specifically required or permitted the minimum lot area shall be 1 1/2 acres and the minimum lot width 150 feet at the building line and 150 feet at the water's edge. All lots created must conform to the regulations found at § 384-55 of this chapter.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Lots in the A-2 General Agricultural District inside Herman town.
      “Minimum area and width. Except as otherwise specifically required or permitted the minimum lot area shall be five acres and the minimum lot width 150 feet at the building line and 150 feet at the water's edge.”
  • SetbacksDistrict specific (with conditions)

    Principal buildings in the A-1 Farmland Preservation District inside Herman town.

    • New structures must also meet the street-yard rule in § 384-46.

    side yard: >= 15 feet (For each principal building.) · rear yard: >= 25 feet (For each principal building.)

    “Side yards. There shall be a fifteen-foot side yard for each principal building. Rear yards. There shall be a twenty-five-foot minimum rear yard for each principal building. Street yard setbacks. All new structures shall have a street yard in accordance with § 384-46 of this chapter.”
    One more reviewed finding on this topic
    • District specific (with conditions) — Principal buildings in the A-2 General Agricultural District inside Herman town.
      “Side yards. There shall be a fifteen-foot side yard for each principal building. Rear yards. There shall be a twenty-five-foot minimum rear yard for each principal building. Street yard setbacks. All new structures shall have a street yard in accordance with § 384-46 of this chapter.”
  • Building heightDistrict specific (with conditions)

    Structures in the A-1 Farmland Preservation and A-2 General Agricultural Districts inside Herman town.

    • Both district provisions cross-reference § 384-17E for the applicable height limitations; the numerical rule in that cross-referenced provision was not retrieved.
    “Height limitations. See § 384-17E. [Amended 11-13-2018 by Ord. No. 18-03]”
  • Manufactured homesLimited

    Manufactured/mobile homes moved into Herman town or moved between locations within the town.

    • A building permit is required.
    • A unit placed in Town must be 10 years old or less, subject to stated inspection and correction conditions.
    • The home must meet Federal HUD Standards Chapter XX, Parts 3280 and 3282.
    • A sanitary or privy permit from Dodge County is required before the Town building permit.
    • Only one mobile unit is allowed on a recorded tract.

    maximum age at placement: <= 10 years (Determined by date of unit manufacture.) · units per recorded tract: 1 mobile unit

    “Any mobile home placed in the Town of Herman shall be 10 years or less in age, determined by the date of unit manufacture. [...] Specifically, any mobile home placed in the Town of Herman shall meet the specifications required by Federal HUD Standards Ch. XX, Parts 3280 and 3282.”
  • Accessory dwellingsProhibited

    Accessory buildings in the R-1 Single-Family Residential District inside Herman town.

    • This claim concerns accessory buildings in R-1; the opened material does not resolve every other district or a separately defined accessory dwelling unit.
    “Single-family dwellings and accessory buildings, including private garages and buildings clearly incidental to the residential use of the property, provided that no such accessory buildings may be used as dwelling units.”
  • Who permits septicCounty (with conditions)

    Mobile-home placement inside Herman town, where a sanitary or privy permit is required before Town building-permit issuance.

    • The Town requires a sanitary permit or privy permit from Dodge County before the Town grants the building permit for mobile-home placement.
    “A sanitary permit or privy permit from Dodge County shall be required before being granted a building permit for the placement of a mobile home in the Town of Herman.”
  • Septic permitRequired

    Placement of a mobile home inside Herman town.

    • A Dodge County sanitary permit or privy permit must be obtained before the Town grants the mobile-home building permit.
    “A sanitary permit or privy permit from Dodge County shall be required before being granted a building permit for the placement of a mobile home in the Town of Herman.”
  • Off-grid sanitationLimited

    Privy use associated with mobile-home placement inside Herman town.

    • A privy permit from Dodge County is required before the Town grants the mobile-home building permit.
    “A sanitary permit or privy permit from Dodge County shall be required before being granted a building permit for the placement of a mobile home in the Town of Herman.”
  • Subdividing landRegulated (with conditions)

    Land divisions and subdivisions inside Herman town.

    • The Town code contains procedures for subdivisions, minor land divisions using certified survey maps, and replats.
    “Article III Land Division Procedures § 251-16 Pre-filing conference. § 251-17 Subdivisions. § 251-18 Minor land division; use of certified survey map. § 251-19 Replat.”
  • Driveway accessRequired

    New, altered, changed, replaced, or extended driveways inside Herman town.

    • A permit is required.
    • Access to state/federal highways requires Wisconsin DOT permission; access to county highways requires Dodge County Highway Department permission.
    • Field-access ways whose primary purpose is field access are not driveways for this chapter.
    “All driveways installed, altered, changed, replaced or extended shall require a permit and meet the following requirements:”
  • Building in a floodplainLimited

    Development in the CO Conservancy District inside Herman town where shoreland-wetland or floodplain regulations apply.

    • Dodge County shoreland-wetland and floodplain regulations apply where applicable.
    • A Town conditional-use permit must not restrict a floodway or destroy floodplain storage capacity.
    “Uses and structures may be subject to shoreland-wetland and floodplain regulations prescribed by Dodge County, where applicable.”
  • Permit feesVariable (with conditions)

    Driveway permits inside Herman town.

    • The Zoning Administrator collects the fee determined by the Town Board; no numerical fee appears in the cited provision.
    “No person, partnership, company or corporation shall locate, establish or construct any new driveway or install any culvert without having first obtained a driveway permit application from the Zoning Administrator, who shall collect the fee as determined by the Town Board.”
  • Permit processPartial

    Mobile-home placement and driveway construction inside Herman town.

    • A mobile-home permit application is made to the Building Inspector.
    • A driveway application must include a drawing showing location, dimension, and grade plus proposed materials.
    “Application for such permit shall include a drawing which accurately portrays the location, dimension and grade of the driveway on the subject property, as well as a statement of the proposed materials to be used.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Herman or Dodge County directly.

  • Owner-builder exemption — Owner-built residential construction inside Herman town.
  • Minimum dwelling size — Dwellings inside Herman town.
  • Lot coverage — Land inside Herman town.
  • Living in an RV — Long-term RV occupancy on private land inside Herman town.
  • Camping on your land — Temporary camping on private land inside Herman town.
6 more unanswered
  • Tiny homes
  • Septic inspection
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Herman publishes no rule on the point, not that none exists. Dodge County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Herman means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Dodge County: county rules, score and offices