Dane County, Wisconsin
Town of Primrose is a town in Dane County, Wisconsin. 6 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Dane County page.
Construction of a driveway in Primrose town.
maximum finished driveway slope: <= 13 percent · minimum driveway width: >= 14 feet
“Application for a Driveway Permit in the Town of Primrose requires the name of the applicant and the standard required background information. In addition to this, the following criteria must be met: 1) The applicant must read the driveway ordinance before applying. The ordinance is available from the Town Clerk or the Town website.”
Town of Primrose does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Land in Primrose town subject to the Dane County Zoning Ordinance; Town of Primrose and Dane County jointly decide zoning-change requests.
“Most of the land in the Town of Primrose falls in the A-1 Agriculture (Exclusive) District as specified in the Dane County Zoning Ordinance; therefore, any proposed land use not permitted in this district will require a zoning change.”
Dane County zoning districts applicable to land inside Primrose town.
“The fact sheets should be used as a reference only and are subject to change. For specific ordinance language please refer to Chapter 10 of the Dane County Code of Ordinances or contact zoning staff.”
New private sewage systems and non-plumbing sanitary systems inside Primrose town.
“the division shall inspect all private sewage systems and non-plumbing sanitary systems after construction but before backfilling no later than the end of the next workday, excluding saturdays, sundays and holidays, after receiving notice from the plumber in charge. notice from the plumber in charge shall be given by 9:00 a.m. of the day the system is anticipated to be ready for inspection.”
Privies and similar non-plumbing sanitation systems inside Primrose town.
“Non-plumbing sanitation systems are devices regulated under Ch. SPS 391, Wis. Admin. Code, which are alternatives to water carried sanitation systems. These systems are not connected to a water supply and are not connected to a plumbing system. Structures served solely by a privy shall not contain any plumbing and shall not be connected to a water supply. The property owner must obtain a county sanitary permit before installing any privy or similar device regulated by Ch. SPS 391, Wis. Admin. Code.”
Buildings intended for human habitation or occupancy inside Primrose town when public sewer is available.
“every building intended for human habitation or occupancy, for which public sewer is available, shall be connected to the public sewer by means of individual connections or private interceptor mains. the local sanitary district shall determine whether public sewer is available.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Primrose or Dane County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Primrose publishes no rule on the point, not that none exists. Dane County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Primrose means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.