Building permits, zoning and septic in Village of McFarland, Wisconsin

Village of McFarland, Wisconsin requires building permits before new construction and listed remodeling work begins.1 In Dane County, McFarland administers village zoning through its Community & Economic Development Department; private septic and well permits remain with Public Health Madison & Dane County.23

At a glance

Building permits
Required before new construction and listed remodeling projects1
Zoning
Village Community & Economic Development administers village zoning2
Private septic
Sanitary permits through Public Health Madison & Dane County34
Private wells
Well location permit required through Public Health Madison & Dane County53
Owner-builder
State allowance lets an owner who occupies or will occupy the home obtain construction and erosion-control permits6
Inspections
Village on-site inspections during permitted construction7

Who to call

Building permits

Village of McFarland Building Inspector

Village building inspections and building-code questions

608-838-2314

Zoning

Village of McFarland Community & Economic Development Department

Village zoning, subdivision, development review and building-permit questions

608-838-3154

Septic permits

Public Health Madison & Dane County - Environmental Health (Well & Septic Program)

Issues well location permits and sanitary (septic) permits for private wells and septic systems in Dane County, and enforces mandatory triennial septic inspection and maintenance

608-242-6515

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Village of McFarland means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Village of McFarland, WI?

McFarland requires a building permit for new residential or commercial construction and listed additions, alterations and accessory structures.1 McFarland's list includes garages, sheds, fences, driveway installation or alteration, roofing, siding, replacement windows and specified electrical, heating and plumbing work.1 The village lists flooring changes, private sidewalks, patios and painting as work that does not require a building permit.1 Starting covered work without a building permit can bring doubled fees, a stop-work order and daily fines.1 Submit complete paperwork and plans about a week before the anticipated start, and wait for the building permit before beginning.81

Who issues building permits in Village of McFarland?

McFarland's Community & Economic Development Department administers the village's building codes and oversees building inspections.9 Contact the village Building Inspector for building-code and inspection questions; the inspector's office hours are by appointment.9 Contact Community & Economic Development for questions about whether a project needs a building permit and the required application paperwork.28 McFarland conducts on-site inspections during construction, and work or materials that fail code requirements must be corrected and inspected again.7 Ask the village to identify the building-permit fee for the specific project before submitting the application.10

Does Village of McFarland have zoning for RVs and tiny homes?

McFarland administers its own village zoning, subdivision and building codes through Community & Economic Development.2 The village provides an interactive zoning map to help identify a property's zoning.2 Ask that department to identify the parcel's district and applicable lot size, setbacks, coverage and height limits before choosing a house footprint.2 We could not confirm McFarland-specific minimum dwelling sizes or general permission to occupy an RV, tiny home or accessory dwelling; ask Community & Economic Development about the proposed structure and use.2 Wisconsin's Uniform Dwelling Code covers new dwelling construction, but that building-code framework alone does not establish permission for a particular residential use on a McFarland lot.112

How do septic permits work inside Village of McFarland?

Public Health Madison & Dane County issues sanitary permits for private septic systems and well location permits for private wells, including proposed systems inside McFarland.35 Dane County requires buildings intended for habitation or occupancy to have approved wastewater disposal; public sewer connection is required where public sewer is available, as determined by the local sanitary district.12 For a private septic system, start with a licensed certified soil tester, obtain a design from a licensed professional and have that professional submit the sanitary-permit application to Public Health.3 McFarland cannot issue a building permit for new construction requiring a private sewage system until the sanitary permit is obtained.4 Most private septic systems require inspection every three years.3

Building a home in Village of McFarland: what comes first?

  • Ask McFarland Community & Economic Development to confirm zoning and the development review needed for the proposed home.2
  • Establish sewer availability; if the home requires a private sewage system, obtain the sanitary permit before the village building permit.124
  • Submit the village's completed application and required plans before the anticipated construction start, allowing about a week for issuance.8
  • Obtain the McFarland building permit before work starts and arrange construction inspections with the village Building Inspector.179
  • For a home covered by Wisconsin's Uniform Dwelling Code, take occupancy only after a final inspection finds no major health or safety violations; ask the village whether a separate occupancy permit is needed.139

What stays with Dane County when buying in Village of McFarland?

Village building permits and zoning do not replace Public Health Madison & Dane County's private well and septic approvals.23 A proposed private well needs a well location permit before construction; contact the Well & Septic Program about the location and application process.3 Wisconsin requires suitable wastewater treatment, recycling, dispersal or holding for buildings with plumbing fixtures that are not connected to public sewer, so discuss an off-grid sanitation design with Public Health before buying equipment.143 For land outside village limits, read the Dane County guide: county zoning applies in covered unincorporated areas where the town adopted the ordinance, with extraterritorial-zoning exclusions.15

Watch-outs

  • McFarland can double building-permit fees, stop work and impose daily fines when covered construction starts without a building permit.1
  • We could not confirm permission for RV living or tiny-home occupancy in McFarland; ask village Community & Economic Development before buying land for that use.2
  • The Wisconsin owner-builder allowance lets a qualifying owner obtain construction and erosion-control permits; McFarland still requires building permits and inspections for covered work.617

Sources

  1. When is a Building Permit Required? (Village of McFarland), quoted and re-checked
  2. Village of McFarland Community & Economic Development Department (mcfarland.wi.us)
  3. Public Health Madison & Dane County - Environmental Health (Well & Septic Program) (publichealthmdc.com)
  4. Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
  5. Private Wells & Septic Systems (Village of McFarland), quoted and re-checked
  6. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  7. When is a Building Permit Required? (Village of McFarland), quoted and re-checked
  8. When is a Building Permit Required? (Village of McFarland), quoted and re-checked
  9. Village of McFarland Building Inspector (mcfarland.wi.us)
  10. When is a Building Permit Required? (Village of McFarland), quoted and re-checked
  11. UDC (Uniform Dwelling Code / One- and Two- Family Dwellings) (Village of McFarland), quoted and re-checked
  12. Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
  13. Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
  14. Wisconsin Administrative Code, SPS 382 (Wisconsin statewide rule), quoted and re-checked
  15. Dane County Zoning Ordinance (Ch. 10, Dane County Code), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Village of McFarland

Village of McFarland’s own rules

  • Building permitRequired

    New residential or commercial construction and listed additions, alterations, accessory structures, fences, driveways, pools, roofing, siding, windows, and specified interior work inside McFarland village.

    • A permit must be obtained before work starts.
    • The Village may double fees, stop work, and impose daily fines for noncompliance.
    • Listed exceptions include flooring, private sidewalks, patios, and painting.
    “Village Ordinances and State Statutes require building permits. If you do not apply for a building permit prior to starting work, the Village can double the fees, stop work, and fine you for every day the work is not in compliance.”
  • InspectionsRequired

    Construction projects requiring permits inside McFarland village.

    • On-site inspections occur during construction.
    • Noncompliant work or materials must be corrected and re-inspected.
    “During construction of your project, on-site inspections will be conducted to check that approved materials are used and the work meets code requirements.”
  • Short-term rentalsLimited

    Tourist rooming houses, meaning short-term rentals, inside McFarland village.

    • A complete and accurate application and successful property inspections are required.
    • A non-resident or non-Village-business operator may operate only with stays of seven to 29 consecutive days.
    • A Village resident or Village business may operate with stays of one to 29 consecutive days under the cited FAQ.

    short-term rental definition: <= 29 days or fewer

    “If the operator is not a Village resident or Village business, the TRH can only operate with stays between seven and 29 consecutive days.”
  • Permit feesVariable (with conditions)

    Village building permits inside McFarland village.

    • The Village page states that fees may be doubled when work starts without a permit, but does not publish a complete fee schedule on the opened page.
    “If you do not apply for a building permit prior to starting work, the Village can double the fees, stop work, and fine you for every day the work is not in compliance.”
  • Permit processPublished (with conditions)

    Village permit process inside McFarland village.

    • Submit the completed application and required paperwork/plans before anticipated construction; the Village requests submission about a week before the anticipated start.
    • Service-connection applications are reviewed for required information and by the Public Works Director before approval.

    recommended submission lead time: 1 week

    “Please allow time for your permit to be issued by submitting your completed application and proper paperwork/plans a week prior to the anticipated start of your project.”

Rules another office applies inside Village of McFarland

Village of McFarland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    New one- and two-family dwellings inside McFarland village under Wisconsin's Uniform Dwelling Code.

    • The municipality may issue permits when delegated authority exists; otherwise DSPS handles permitting.

    code chapters: SPS 320-325

    “The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code.”
  • Well permitRequired

    Private-well construction inside McFarland village when a private well is proposed.

    • Public Health Madison & Dane County directs applicants to contact it for the permit and process for building a well in Dane County.
    “Call us at 608-242-6515 for details about the permit and the process for building a well in Dane County.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of McFarland or Dane County directly.

  • Owner-builder exemption — Owner-builder exemption inside McFarland village.
  • Certificate of occupancy — Certificates of occupancy inside McFarland village.
  • Minimum dwelling size — Minimum dwelling size inside McFarland village.
  • Minimum lot size — Minimum lot size inside McFarland village.
  • Setbacks — Setbacks inside McFarland village.
8 more unanswered
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Accessory dwellings
  • Off-grid sanitation
  • Agricultural exemption

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of McFarland publishes no rule on the point, not that none exists. Dane County’s page lists the county offices to call.

← All of Dane County: county rules, score and offices