Village of McFarland, Wisconsin requires building permits before new construction and listed remodeling work begins.1 In Dane County, McFarland administers village zoning through its Community & Economic Development Department; private septic and well permits remain with Public Health Madison & Dane County.23
At a glance
- Building permits
- Required before new construction and listed remodeling projects1
- Zoning
- Village Community & Economic Development administers village zoning2
- Private septic
- Sanitary permits through Public Health Madison & Dane County34
- Private wells
- Well location permit required through Public Health Madison & Dane County53
- Owner-builder
- State allowance lets an owner who occupies or will occupy the home obtain construction and erosion-control permits6
- Inspections
- Village on-site inspections during permitted construction7
Who to call
Building permits
Village of McFarland Building Inspector
Village building inspections and building-code questions
Zoning
Village of McFarland Community & Economic Development Department
Village zoning, subdivision, development review and building-permit questions
Septic permits
Public Health Madison & Dane County - Environmental Health (Well & Septic Program)
Issues well location permits and sanitary (septic) permits for private wells and septic systems in Dane County, and enforces mandatory triennial septic inspection and maintenance
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Village of McFarland means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Village of McFarland, WI?
McFarland requires a building permit for new residential or commercial construction and listed additions, alterations and accessory structures.1 McFarland's list includes garages, sheds, fences, driveway installation or alteration, roofing, siding, replacement windows and specified electrical, heating and plumbing work.1 The village lists flooring changes, private sidewalks, patios and painting as work that does not require a building permit.1 Starting covered work without a building permit can bring doubled fees, a stop-work order and daily fines.1 Submit complete paperwork and plans about a week before the anticipated start, and wait for the building permit before beginning.81
Who issues building permits in Village of McFarland?
McFarland's Community & Economic Development Department administers the village's building codes and oversees building inspections.9 Contact the village Building Inspector for building-code and inspection questions; the inspector's office hours are by appointment.9 Contact Community & Economic Development for questions about whether a project needs a building permit and the required application paperwork.28 McFarland conducts on-site inspections during construction, and work or materials that fail code requirements must be corrected and inspected again.7 Ask the village to identify the building-permit fee for the specific project before submitting the application.10
Does Village of McFarland have zoning for RVs and tiny homes?
McFarland administers its own village zoning, subdivision and building codes through Community & Economic Development.2 The village provides an interactive zoning map to help identify a property's zoning.2 Ask that department to identify the parcel's district and applicable lot size, setbacks, coverage and height limits before choosing a house footprint.2 We could not confirm McFarland-specific minimum dwelling sizes or general permission to occupy an RV, tiny home or accessory dwelling; ask Community & Economic Development about the proposed structure and use.2 Wisconsin's Uniform Dwelling Code covers new dwelling construction, but that building-code framework alone does not establish permission for a particular residential use on a McFarland lot.112
How do septic permits work inside Village of McFarland?
Public Health Madison & Dane County issues sanitary permits for private septic systems and well location permits for private wells, including proposed systems inside McFarland.35 Dane County requires buildings intended for habitation or occupancy to have approved wastewater disposal; public sewer connection is required where public sewer is available, as determined by the local sanitary district.12 For a private septic system, start with a licensed certified soil tester, obtain a design from a licensed professional and have that professional submit the sanitary-permit application to Public Health.3 McFarland cannot issue a building permit for new construction requiring a private sewage system until the sanitary permit is obtained.4 Most private septic systems require inspection every three years.3
Building a home in Village of McFarland: what comes first?
- Ask McFarland Community & Economic Development to confirm zoning and the development review needed for the proposed home.2
- Establish sewer availability; if the home requires a private sewage system, obtain the sanitary permit before the village building permit.124
- Submit the village's completed application and required plans before the anticipated construction start, allowing about a week for issuance.8
- Obtain the McFarland building permit before work starts and arrange construction inspections with the village Building Inspector.179
- For a home covered by Wisconsin's Uniform Dwelling Code, take occupancy only after a final inspection finds no major health or safety violations; ask the village whether a separate occupancy permit is needed.139
What stays with Dane County when buying in Village of McFarland?
Village building permits and zoning do not replace Public Health Madison & Dane County's private well and septic approvals.23 A proposed private well needs a well location permit before construction; contact the Well & Septic Program about the location and application process.3 Wisconsin requires suitable wastewater treatment, recycling, dispersal or holding for buildings with plumbing fixtures that are not connected to public sewer, so discuss an off-grid sanitation design with Public Health before buying equipment.143 For land outside village limits, read the Dane County guide: county zoning applies in covered unincorporated areas where the town adopted the ordinance, with extraterritorial-zoning exclusions.15
Watch-outs
- McFarland can double building-permit fees, stop work and impose daily fines when covered construction starts without a building permit.1
- We could not confirm permission for RV living or tiny-home occupancy in McFarland; ask village Community & Economic Development before buying land for that use.2
- The Wisconsin owner-builder allowance lets a qualifying owner obtain construction and erosion-control permits; McFarland still requires building permits and inspections for covered work.617
Sources
- When is a Building Permit Required? (Village of McFarland), quoted and re-checked
- Village of McFarland Community & Economic Development Department (mcfarland.wi.us)
- Public Health Madison & Dane County - Environmental Health (Well & Septic Program) (publichealthmdc.com)
- Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Private Wells & Septic Systems (Village of McFarland), quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- When is a Building Permit Required? (Village of McFarland), quoted and re-checked
- When is a Building Permit Required? (Village of McFarland), quoted and re-checked
- Village of McFarland Building Inspector (mcfarland.wi.us)
- When is a Building Permit Required? (Village of McFarland), quoted and re-checked
- UDC (Uniform Dwelling Code / One- and Two- Family Dwellings) (Village of McFarland), quoted and re-checked
- Chapter 46 Private Sewage System Ordinance and Health Ordinance, quoted and re-checked
- Wisconsin’s Uniform Dwelling Code (Wisconsin statewide rule), quoted and re-checked
- Wisconsin Administrative Code, SPS 382 (Wisconsin statewide rule), quoted and re-checked
- Dane County Zoning Ordinance (Ch. 10, Dane County Code), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.