Dane County, Wisconsin
Town of Dane is a town in Dane County, Wisconsin. Town of Dane adopts its own zoning, so inside its limits Town of Dane’s rules apply, not the county’s. Septic permits inside Town of Dane come from the county and state together. 17 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Dane County page.
New one- and two-family homes, attached garages, listed alterations, wiring, plumbing, decks, agricultural and pole buildings, and accessory buildings over 120 square feet inside the Town of Dane.
accessory-building threshold: > 120 square feet (Accessory buildings over this size are listed as requiring permits.)
“After Public Hearing is approved you will need a Building Permit from Town of Dane Building Inspector. He will set up appointments for various aspects of work for your property. PERMITS ARE REQUIRED FOR THE FOLLOWING: All new 1 & 2 Family Homes and Attached Garages”
Permitted construction inside the Town of Dane.
“He will set up appointments for various aspects of work for your property.”
Land inside the Town of Dane, where the Town has adopted the revised Dane County zoning ordinance and map and directs applicants to Dane County zoning.
“Dane County Zoning Ordinance (revised Chapter 10 of the Dane County Code, revision adopted by Dane Town Board 3/4/2019)”
Zoning districts applicable inside the Town of Dane.
“Dane County Zoning Ordinance (revised Chapter 10 of the Dane County Code, revision adopted by Dane Town Board 3/4/2019) Town of Dane Zoning Map (revision adopted by the Dane Town Board 3/4/2019) Zoning District Fact Sheets”
ADUs in SFR-08, SFR-1, SFR-2, RR-1, RR-2, RR-4, RR-8, RM-8, and RM-16 districts inside the Town of Dane.
maximum ADU floor area: <= 800 square feet (Second residence on the same lot as an existing principal residence.) · maximum bedrooms: <= 2 bedrooms
“Attached accessory dwelling units may be approved with a conditional use permit.”
New or materially altered driveways inside the Town of Dane or driveways connecting to a Dane road.
minimum sight distance: >= 400 feet (Measured from both directions for vehicles exiting the driveway.)
“A Town of Dane driveway permit is required before any of the following activities may be commenced:”
Town building permits inside the Town of Dane.
“TABLE-1 WISCONSIN UNIFORM BUILDING CODE SCHEDULE OF PERMIT FEES FOR 2025 ADOPTED BY DANE TOWN BOARD 1/6/2025”
Building and zoning approvals inside the Town of Dane.
“Zoning Permit is required prior to obtaining a Town Building Permit.”
Town of Dane does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
SFR-1 (Single-Family Residential, 1 to 2 Acres) zoned land inside the Town of Dane.
minimum lot area: >= 1 acre (Excluding public rights-of-way.) · minimum lot width: >= 100 feet
“Lot dimensions. (a) Minimum lot size. All lots must be at least one acre in area, excluding public rights-of-way. (b) Minimum lot width. All lots must be at least 100 feet wide.”
SFR-1 zoned land inside the Town of Dane.
principal/accessory side setback: >= 10 feet (Except for stated exemptions.)
“Setbacks and required yards. (a) Front yard. Any permitted structure must comply with road setbacks as described in s. 10.102(9). (b) Side yard. [...] accessory buildings must be at least 10 feet from the rear lot line.”
SFR-1 zoned land inside the Town of Dane.
interior-lot coverage: <= 35 percent (Of total lot area excluding public rights-of-way.) · corner-lot coverage: <= 40 percent (Of total lot area excluding public rights-of-way.)
“The total area of all buildings and structures must not exceed: 1. Interior lots: 35% of the total lot area, excluding public rights-of-way. 2. Corner lots: 40% of the total lot area, excluding public rights-of-way.”
SFR-1 zoned land inside the Town of Dane.
principal residential height: <= 35 feet (Also limited to two and one-half stories.) · accessory-building height: <= 16 feet
“Principal buildings. Residential buildings shall not exceed two and a half stories or 35 feet in height. (b) Accessory buildings. Accessory buildings shall not exceed 16 feet in height.”
Private septic systems inside the Town of Dane, within Dane County.
“We issue permits and inspect private septic systems and private wells”
Installation, replacement, repair, extension, enlargement, reconnection, or other modification of a private septic system inside the Town of Dane.
“You Need a Sanitary Permit to: Install a new private septic system or replace a system Repair, extend, or enlarge an existing private septic system Reconnect to an existing private septic system Modify an existing private septic system in some other way”
Private septic systems inside the Town of Dane, as part of Dane County.
inspection frequency for most systems: per 3 years (Some systems require more frequent service.)
“All septic systems in Dane County must be inspected and serviced on a regular basis to make sure that they’re working correctly. This prevents septic system failures or helps to identify them as quickly as possible. Inspection frequency. State and county law requires an inspection every three years for most systems.”
Private wells built inside the Town of Dane.
“Before you build a well, you are required to get a well location permit. We make sure your well is properly setback from potential sources of contamination. Call us at 608-242-6515 for details about the permit and the process for building a well in Dane County.”
Land divisions inside the Town of Dane.
land-division threshold: <= 35 acres (Applies if any divided lot is this size or smaller.) · CSM threshold: < 5 lots (Subdivision plat is needed for five or more lots.)
“The Dane County subdivision ordinance governs the division of land into smaller parcels. This ordinance includes requirements for layout, public streets, improvements, dedications and lot design. It applies if you divide one or more lots from your property, with any lot 35 acres or less in size.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Dane or Dane County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Dane publishes no rule on the point, not that none exists. Dane County’s page lists the county offices to call.