Crawford County, Wisconsin
Village of Ferryville is a village in Crawford County, Wisconsin. Septic permits inside Village of Ferryville come from the county and state together. 13 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Crawford County page.
New dwellings, additions and alterations inside Ferryville village
alteration threshold: > 3500 USD per 12 months (repair/restoration, siding, re-roofing, interior finish, cabinetry exempt) · addition threshold: > 100 sq ft per 12 months
“if a person alters a building in excess of $3,500.00 value in any twelve-month period, adds onto a building in excess of 100 square feet in any twelve-month period, or builds a new building, within the scope of this ordinance, they shall first obtain a building permit for such work from the village building inspector.”
One and two family dwellings inside Ferryville village
“the wisconsin uniform dwelling code, chs. comm. 20-25 of the wisconsin administrative code, and all amendments thereto, is adopted and incorporated by reference and shall apply to all buildings within the scope of this ordinance.”
Dwellings within the scope of Chapter 15 inside Ferryville village
“there is hereby created the position of building inspector, which shall be by contract with the village board, and the contract renewed annually, who shall administer and enforce this ordinance”
New dwellings in the Eagle Mountain subdivision only, inside Ferryville village
minimum habitable living space: >= 700 sq ft (variance under 15.10(2))
“(c) inside habitable living space, excluding basement and garage area must be 700 square feet or greater (see definition).”
New dwellings in the Eagle Mountain subdivision, inside Ferryville village
road right-of-way setback line: >= 30 feet (lots 1 south thru 9 south exempt)
“(b) no part of the dwelling can be placed within the road right-of-way set back line of 30 feet.”
Eagle Mountain subdivision only, inside Ferryville village
“(d) no permit may be granted for placement of a manufactured home or trailer.”
New dwellings inside Ferryville village not connected to village sewer
“shall be hooked up to the village sewage system if within 100' of an existing village sewer main, or an approved waste water system (powts) or an approved holding tank permit given by the county sanitarian and approved by the village board.”
New dwellings inside Ferryville village
“note: no privies (earthen, cement vault or chemical type privies or a composting, incinerating and non-water based toilets, installed or placed within the village limits)”
New dwellings inside Ferryville village
sewer main distance: <= 100 feet (approved POWTS or holding tank alternative)
“shall have a private potable well or be able to hook onto an open well share.”
Division of land and platting inside Ferryville village
“this chapter is adopted pursuant to sec. 61.34, 236.45, wis. stats., which permits the adoption of regulations more restrictive than those contained in chapter 236, wis. stats.”
Land inside Ferryville village covered by the regional or base flood
“this ordinance regulates all areas that would be covered by the regional flood or base flood.”
Dwelling building permits inside Ferryville village (detached structures: $55 flat)
detached structure permit application fee: 55 USD
“(3) the building permit application fee shall be $55.00.”
Detached structure permits inside Ferryville village
application lead time: >= 30 days
“(2) applications shall be obtained from and returned to the village clerk thirty (30) days prior to start of intended construction. the village clerk shall issue permits following approval of the application by the village board.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Ferryville or Crawford County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Ferryville publishes no rule on the point, not that none exists. Crawford County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Ferryville means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.