Bolthole Index

Clark County, Wisconsin

Zoning, building permits and septic rules in Colby, Wisconsin

Colby is a city in Clark County, Wisconsin. Colby adopts its own zoning, so inside its limits Colby’s rules apply, not the county’s. 16 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Clark County page.

Answers from the rulebook for Colby

Colby’s own rules

  • Building permitRequired

    New buildings and structures inside Colby city

    • UDC permit required for additions and alterations to dwellings exceeding $5,000 except re-siding, re-roofing, interior finishing, cabinetry, furnace
    • Minor repairs under $5,000 may be authorized without permit by building inspector
    • Fees doubled if permit not obtained before construction
    • Permit lapses if not started in 6 months or not completed in 12 months
    “no new building or structure, or any part thereof, shall hereafter be erected, or ground broken for the same, or enlarged, altered, moved, demolished, razed or used within the city, except as herein provided, until a permit therefor shall first have been obtained by the owner, or his/her authorized agent, from the city.”
  • Building code adoptedAdopted

    Buildings in Colby city

    • Adopts by reference Wis. Admin. Code chs. SPS 316, 320-325 (UDC), 326, 361-366, 375-379, 381-387
    “the following wisconsin administrative codes and subsequent revisions pertaining to construction activity are adopted by reference for municipal enforcement and incorporated herein”
  • InspectionsRequired

    UDC projects inside Colby city

    • Inspections must be requested 48 business hours in advance by applicant
    • Includes footing/foundation, rough work, insulation, final, erosion control
    “the following inspections for udc projects shall be requested 48 hours (business work days) in advance by the applicant/contractor or property owner to the building inspector”
  • Certificate of occupancyRequired

    Occupancy of buildings inside Colby city

    • CO is not issued until sewer, water, grading and graveling are available to the property
    • Section shown only indirectly sets CO precondition; full CO procedure not located
    “no person shall occupy any building until sewer, water, grading and graveling are installed in the streets necessary to service the property, and a certificate of occupancy shall not be issued until such utilities are available to service the property.”
  • Local zoningPresent

    Land inside Colby city limits

    “ch 480 zoning chapter 480 zoning [history: adopted by the common council of the city of colby 10-5-1995 as title 13, ch. 1, of the 1995 code.”
  • Zoning districtsPublished

    Colby city

    • Districts: R-1, R-2, CG, IL, IG, CN, UT, IGL
    • Zoning map dated February 7, 1978, and as amended, on file with zoning administrator
    “for the purpose and provision of this chapter, the city of colby, clark and marathon counties, is hereby organized into the following districts”
  • Minimum dwelling sizeSpecified

    R-1 district, single-family detached dwellings, Colby city

    • Excludes all mobile homes
    • Text after 'living' (area measurement rules) was not captured

    minimum living area: >= 864 square feet

    “single-family detached dwellings, excluding all mobile homes, with a minimum of 864 square feet of living”
  • Minimum lot sizeSpecified

    R-1 One-Family and Two-Family Residential District, Colby city

    minimum lot area, single-family: >= 10000 square feet · minimum lot area, two-family: >= 15000 square feet · minimum lot width: >= 100 feet

    “minimum lot area shall be 10,000 square feet for a single-family dwelling and 15,000 square feet for a two-family dwelling. minimum lot width shall be 100 feet.”
  • SetbacksSpecified

    R-1 One-Family and Two-Family Residential District, Colby city

    • Navigable-water setback (§ 480-13) not reviewed

    front yard: >= 20 feet · side yard, principal building/garage (each side): >= 8 feet · side yard, accessory building: >= 3 feet · rear yard, principal building/garage: >= 20 feet · rear yard, accessory building: >= 5 feet

    “front yard setback: 20 feet. (2) side yard for principal building/garage: eight feet on each side. (3) side yard for accessory building: three feet.”
  • Building heightSpecified

    R-1 One-Family and Two-Family Residential District, Colby city

    maximum building height: <= 35 feet

    “f. height. (1) maximum building height: 35 feet.”
  • Manufactured homesLimited

    R-1 One-Family and Two-Family Residential District, Colby city

    • Must be a double-wide at least 24 ft wide and 36 ft long
    • Installed on approved foundation with wheels and axles removed
    • Foundation siding, roof pitch of at least 2 in 12, nonreflective roofing, overhanging eaves
    • Mobile homes are excluded from single-family dwellings; Art. XI regulates mobile home parks (not read)

    minimum width: >= 24 feet · minimum length: >= 36 feet

    “the home shall be a double-wide of at least 24 feet in width and 36 feet in length.”
  • Mandatory utility hookupWater and sewer (with conditions)

    New residential buildings inside Colby city

    • Common council determines areas where public utilities are available
    • Nonresidential buildings need contracts and financial assurances for sewer and water
    “no building permit shall be issued for the construction of any residential building until sewer, water, grading and graveling are installed in the streets necessary to service the property for which the permit is required”
  • Agricultural exemptionConditional

    Agricultural buildings on agriculturally zoned parcels, Colby city building code

    • Only agricultural buildings on agriculturally zoned parcels; Ch. 480 lists no agricultural district
    “not included are children's play structures and agricultural buildings on agriculturally zoned parcels.”
  • Subdividing landRegulated (with conditions)

    Land divisions inside Colby city

    • Separate land division chapter not opened
    “no building permits shall be issued until the land division and required improvements and phasing are accepted by the common council.”
  • Driveway accessLimited

    Houses inside Colby city

    • Permit requires property abut a dedicated street
    • § 480-56 highway access not opened

    maximum driveway grade: <= 12 percent

    “the maximum driveway elevation shall be 12% from the flag of the curb to the threshold of the garage door.”
  • Permit processPublished (with conditions)

    Building permits inside Colby city

    • Plans and plot plan required for new buildings
    • Site plan approval for non-one/two-family projects
    • Preliminary foundation permit then final permit after foundation recertification
    “application for a building permit shall be made in writing upon a form furnished by the city and shall state the name and address of the owner of the land”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Colby or Clark County directly.

  • Owner-builder exemption — Owner-builders inside Colby city
  • Lot coverage — Inside Colby city
  • Living in an RV — Inside Colby city
  • Camping on your land — Inside Colby city
  • Tiny homes — Inside Colby city
9 more unanswered
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Colby publishes no rule on the point, not that none exists. Clark County’s page lists the county offices to call.

← All of Clark County: county rules, score and offices