Chippewa County, Wisconsin
Town of Edson is a town in Chippewa County, Wisconsin. Septic permits inside Town of Edson come from Chippewa County (Chippewa County Department of Planning and Zoning (POWTS/Sanitary Permits) · 715-726-7940). 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Chippewa County page.
Town of Edson does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New one- and two-family dwellings inside Edson town.
“A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
New one- and two-family dwellings, including manufactured-home installations, inside Edson town.
“A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
New one- and two-family dwellings inside Edson town.
“the following inspections are required on new one- and two-family dwellings. when ready for inspection, notify the inspector identified on your udc permit. footings (includes excavation, etc.) foundation and foundation reinforcement rough (includes electrical, plumbing, hvac, framing, etc.) insulation final”
Private onsite wastewater systems inside Edson town, because the county ordinance is administered county-wide.
“The Chippewa County Private Sewage System Ordinance is administered county-wide.”
Applicable building or zoning projects inside Edson town requiring a private sewage system.
conventional sanitary permit fee: 300 USD · mound or at-grade sanitary permit fee: 450 USD · holding-tank sanitary permit fee: 505 USD · reconnection sanitary permit fee: 150 USD
“sanitary permit: a sanitary permit shall be issued prior to the applicable building and/or zoning permit: a. conventional system $300.00 b. mound or at-grade system $450.00 c. holding tank $505.00 d. re-connection to existing system $150.00”
Structures inside Edson town that are not served by public sewer and have running water plumbed into the structure.
“All structures or premises in the county that are permanently or intermittently intended for human habitation or occupancy, which are not served by a public sewer and have running water plumbed into the structure, are required to have a system for holding or treatment and dispersal of sewage and wastewater.”
Division of land inside Edson town.
“The Chippewa County land division ordinance is one of the ordinances that is effective in every township within Chippewa County. This ordinance regulates the division of land.”
Sanitary permits required for applicable building or zoning projects inside Edson town.
conventional sanitary permit fee: 300 USD · mound or at-grade sanitary permit fee: 450 USD · holding-tank sanitary permit fee: 505 USD · reconnection sanitary permit fee: 150 USD
“a. conventional system $300.00 b. mound or at-grade system $450.00 c. holding tank $505.00 d. re-connection to existing system $150.00”
New one- and two-family dwelling permit applications inside Edson town handled through Chippewa County after Edson's UDC opt-out.
“In step 7, you will need to print out the application, which will include the confirmation page, and submit a hard copy to the Chippewa County Department of Planning and Zoning. If the form is incomplete or information is missing, it will not be accepted.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Edson or Chippewa County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Edson publishes no rule on the point, not that none exists. Chippewa County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Edson means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.