Bolthole Index

Calumet County, Wisconsin

Zoning, building permits and septic rules in Village of Potter, Wisconsin

Village of Potter is a village in Calumet County, Wisconsin. Village of Potter adopts its own zoning, so inside its limits Village of Potter’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Calumet County page.

Answers from the rulebook for Village of Potter

Village of Potter’s own rules

  • Building permitRequired

    Building, additions and alterations to one- and two-family dwellings inside Potter village

    • Alterations of $1000 or less value in any twelve month period do not need a permit
    • Restoration or repair to previous code-compliant condition, re-siding, re-roofing, interior surface finishing and cabinetry installation are exempt
    • Structural changes or major mechanical changes with extensions require permits
    • Separate 1981 ordinance 1981-6 also requires a clerk-issued permit for new structures, additions and moved structures including mobile homes

    alteration value threshold: > 1000 USD per 12 months (exempt work listed above)

    “no person shall alter, in excess of $1000.00 value in any twelve month period, build, add onto or alter any building within the scope of this ordinance without first obtaining a building permit for such work from the building inspector.”
  • Building code adoptedAdopted

    One- and two-family dwellings inside Potter village

    • Scope: one and two family dwellings built since June 1, 1980, plus alterations/additions to older ones and detached garages serving them
    “the wisconsin uniform dwelling code, chs. comm. 20-25 of the wisconsin administrative code, and all amendments thereto, is adopted and incorporated by reference and shall apply to all buildings within the scope of this ordinance.”
  • InspectionsRequired

    Construction of one- and two-family dwellings inside Potter village

    • Scope limited to one and two family dwellings, additions/alterations and detached garages serving them
    “the scope of this ordinance includes the construction and inspection of one and two family dwellings built since june 1, 1980.”
  • Local zoningPresent

    All lands and waters within the corporate limits of Potter village, Calumet County

    • Jurisdiction covers all lands and waters within the corporate limits of the village
    • Compliance with other applicable local, county and state regulations is also required
    “this ordinance shall be known as, referred to, or cited as the zoning ordinance for the village of potter, calumet county, wisconsin.”
  • Zoning districtsPublished

    Potter village zoning districts

    • Ten districts: R-1, R-2, C-1, C-2, C-3, I, A, CON, REC, W
    • Boundaries delineated on the zoning district map (adopted zoning map PDF on village site, not opened)
    “for the purpose of this ordinance, the village of potter is hereby divided into the following districts: one and two-family residence district (r-1) multiple-family residence district (r-2) general commercial district (c-1) highway commercial district (c-2) extensive commercial district (c-3) industrial district (i) agricultural district (a) conservancy district (con) recreational district (rec) shoreland-wetland district (w)”
  • Minimum dwelling sizeSpecified

    Single-family residences in the One and Two-Family Residence District (R-1), Potter village

    • Duplexes have higher minimums (1,500 sq. ft. one-story; 1,800 two-story)
    • Agricultural district floor-area rule not located

    min floor area one-story: >= 900 sq ft · min floor area two-story: >= 1150 sq ft · min floor area split-level: >= 1400 sq ft

    “minimum floor area: single-family residences one-story 900 sq. ft. two-story 1,150 sq. ft. split-level (3 or more floors) 1,400 sq. ft.”
  • Minimum lot sizeSpecified

    Agricultural District (A), Potter village

    • Minimum lot width 200 feet
    • Where public sewerage is unavailable, lot must allow an on-site system complying with ch. Comm 83

    min lot area: >= 5 acres

    “35 feet residential structures; no maximum on other structures. 25 feet 50 feet 20 ft. each side 5 ft. each side 5 acres 200 feet”
    One more reviewed finding on this topic
  • SetbacksSpecified

    Agricultural District (A), Potter village

    • Values read in the source's listed order: front, rear, side principal, side accessory

    front yard: >= 25 feet · rear yard: >= 50 feet · side yard, principal: >= 20 feet each side · side yard, accessory: >= 5 feet each side

    “35 feet residential structures; no maximum on other structures. 25 feet 50 feet 20 ft. each side 5 ft. each side 5 acres 200 feet”
    One more reviewed finding on this topic
  • Building heightSpecified

    Agricultural District (A), Potter village

    • No maximum on non-residential structures

    max height, residential structures: <= 35 feet (no maximum on other structures)

    “35 feet residential structures; no maximum on other structures.”
    One more reviewed finding on this topic
  • Permit feesVariable (with conditions)

    UDC building permits inside Potter village

    • Fee set by village board resolution, which was not located
    • Ordinance 1981-6 lists an older fee schedule ($50 new construction) that may be superseded

    state UDC permit seal included in fee: 25 USD (for any new dwelling)

    “the building permit fee shall be determined by resolution and shall include $25.00 to be forwarded to the wisconsin department of commerce for a udc permit seal that shall be assigned to any new dwelling.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Village of Potter or Calumet County directly.

  • Owner-builder exemption — Owner-builders inside Potter village
  • Certificate of occupancy — Occupancy of new buildings inside Potter village
  • Lot coverage — R-1 and Agricultural districts, Potter village
  • Living in an RV — RV occupancy inside Potter village
  • Camping on your land — Camping inside Potter village
14 more unanswered
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Village of Potter publishes no rule on the point, not that none exists. Calumet County’s page lists the county offices to call.

← All of Calumet County: county rules, score and offices