Calumet County, Wisconsin
Village of Potter is a village in Calumet County, Wisconsin. Village of Potter adopts its own zoning, so inside its limits Village of Potter’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Calumet County page.
Building, additions and alterations to one- and two-family dwellings inside Potter village
alteration value threshold: > 1000 USD per 12 months (exempt work listed above)
“no person shall alter, in excess of $1000.00 value in any twelve month period, build, add onto or alter any building within the scope of this ordinance without first obtaining a building permit for such work from the building inspector.”
One- and two-family dwellings inside Potter village
“the wisconsin uniform dwelling code, chs. comm. 20-25 of the wisconsin administrative code, and all amendments thereto, is adopted and incorporated by reference and shall apply to all buildings within the scope of this ordinance.”
Construction of one- and two-family dwellings inside Potter village
“the scope of this ordinance includes the construction and inspection of one and two family dwellings built since june 1, 1980.”
All lands and waters within the corporate limits of Potter village, Calumet County
“this ordinance shall be known as, referred to, or cited as the zoning ordinance for the village of potter, calumet county, wisconsin.”
Potter village zoning districts
“for the purpose of this ordinance, the village of potter is hereby divided into the following districts: one and two-family residence district (r-1) multiple-family residence district (r-2) general commercial district (c-1) highway commercial district (c-2) extensive commercial district (c-3) industrial district (i) agricultural district (a) conservancy district (con) recreational district (rec) shoreland-wetland district (w)”
Single-family residences in the One and Two-Family Residence District (R-1), Potter village
min floor area one-story: >= 900 sq ft · min floor area two-story: >= 1150 sq ft · min floor area split-level: >= 1400 sq ft
“minimum floor area: single-family residences one-story 900 sq. ft. two-story 1,150 sq. ft. split-level (3 or more floors) 1,400 sq. ft.”
Agricultural District (A), Potter village
min lot area: >= 5 acres
“35 feet residential structures; no maximum on other structures. 25 feet 50 feet 20 ft. each side 5 ft. each side 5 acres 200 feet”
“minimum lot area: single-family residences 8,500 sq. ft. zero lot line duplexes 7,250 sq. ft. per single- family unit”
Agricultural District (A), Potter village
front yard: >= 25 feet · rear yard: >= 50 feet · side yard, principal: >= 20 feet each side · side yard, accessory: >= 5 feet each side
“35 feet residential structures; no maximum on other structures. 25 feet 50 feet 20 ft. each side 5 ft. each side 5 acres 200 feet”
“minimum side yard setback: principal building 35 feet 25 feet 25 feet 3 feet 8 ft. each side except zero lot line duplexes (sec. 2.17) 3 feet accessory building”
Agricultural District (A), Potter village
max height, residential structures: <= 35 feet (no maximum on other structures)
“35 feet residential structures; no maximum on other structures.”
“minimum side yard setback: principal building 35 feet 25 feet 25 feet 3 feet 8 ft. each side except zero lot line duplexes (sec. 2.17) 3 feet accessory building”
UDC building permits inside Potter village
state UDC permit seal included in fee: 25 USD (for any new dwelling)
“the building permit fee shall be determined by resolution and shall include $25.00 to be forwarded to the wisconsin department of commerce for a udc permit seal that shall be assigned to any new dwelling.”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Potter or Calumet County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Potter publishes no rule on the point, not that none exists. Calumet County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Potter means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.