Buffalo County, Wisconsin
Town of Cross is a town in Buffalo County, Wisconsin. Town of Cross adopts its own zoning, so inside its limits Town of Cross’s rules apply, not the county’s. Septic permits inside Town of Cross come from Buffalo County (Buffalo County Zoning Department (POWTS) · (608) 685-6218 Ext. 1). 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Buffalo County page.
Land inside the Town of Cross, where Buffalo County publishes a Town of Cross zoning map and its county zoning application covers all unincorporated areas except Montana and Waumandee.
“Zoning Permit Application – All unincorporated areas excluding the towns on Montana and Waumandee”
Construction of a new home or sleeping/living-quarters structure inside Cross.
“Your plumber will apply for your sanitary permit. Since sanitary permits typically have the longest review process and are required prior to the issuance a state building permit, it is wise to get connected with a licensed plumber as soon as possible.”
New-home driveway access inside Cross.
maximum driveway grade: <= 12 percent
“Prior to receiving an address, a driveway permit must be issued by the appropriate entity. If your proposed driveway is located on a town road, contact your town’s chairperson or supervisor. A Buffalo County Driveway Permit is required for any driveway entering a county highway.”
County sanitary permits and related POWTS services for work inside Cross.
conventional system sanitary permit: 400 USD · pressurized system sanitary permit: 550 USD · holding tank sanitary permit: 500 USD · pumping notice and tracking fee: 10 USD/year/system
“Conventional System $400 Pressurized Systems $550 Holding Tank $500 Transfer/Renewal/Revision $150 Non-Plumbing/Modification/Reconnect $125 Soils and Site Evaluation Filing Fee $75 Pumping Notice and Tracking Fee $10/year/system”
New homes and structures intended for sleeping/living quarters inside Cross.
complete-application review period: <= 30 days (County says permits will be reviewed within 30 days of receiving a complete application.)
“Permits will be reviewed within 30 days of receiving a complete application. At this time the Zoning Department is typically completing the review process in 1-2 weeks.”
Town of Cross does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New homes and other structures intended to serve as sleeping/living quarters inside Cross.
“A permit under the UDC is required for new one- and two-family dwelling units. This includes stick-built, modular, and manufactured home installations.”
New homes and structures intended for sleeping/living quarters inside Cross.
“The program governing one- and two-family dwelling units (including manufactured homes) is also called the UDC program, referring to the Uniform Dwelling Code. Enforces construction standards and inspection procedures including evaluation of building materials.”
Uniform Dwelling Code work for new homes in Cross.
“The following inspections are required on new one- and two-family dwellings. When ready for inspection, notify the inspector identified on your UDC permit.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Cross or Buffalo County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Cross publishes no rule on the point, not that none exists. Buffalo County’s page lists the county offices to call.