Brown County, Wisconsin
Town of New Denmark is a town in Brown County, Wisconsin. Town of New Denmark adopts its own zoning, so inside its limits Town of New Denmark’s rules apply, not the county’s. Septic permits inside Town of New Denmark come from Brown County (Brown County Planning and Land Services - Zoning Division (Sanitary/POWTS Program)). 12 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Brown County page.
Listed construction work inside the Town of New Denmark, including commercial buildings, repairs, remodeling, renovations, utility-work extensions or replacements, and relocation of buildings or mobile/manufactured homes.
“building permits are required for the following: a.) commercial buildings including new, additions, alterations, accessory structures, garages, storage buildings, decks and the like.”
Town UDC-permitted new one- and two-family dwellings, covered manufactured/modular homes, and sleeping cabins at campgrounds or parks.
“the above permits require the following inspections: footings, foundations, drain tile, rough framing, rough hvac, underground plumbing, rough plumbing, plumbing final, temporary, rough and final electrical, energy control final and occupancy.”
All lands and waters inside the Town of New Denmark.
“the jurisdiction of this ordinance shall include all lands and waters within the town of new denmark.”
Installation of a private onsite wastewater treatment system inside the Town of New Denmark where public sewer is unavailable.
“(2) no powts or part thereof shall hereafter be located, installed, moved, reconstructed, reconnected, extended, enlarged, converted, substantially altered or their use changed without a sanitary permit”
Installation of a culvert or driveway inside the Town of New Denmark.
application fee: 70 USD
“the application will be reviewed at the next regular town board meeting. upon approval, a copy will be provided to the applicant and the building inspector along with a permit number authorizing installation of the culvert/driveway.”
Construction permitting inside the Town of New Denmark.
informational permit filing lead time: >= 5 days (before the monthly Town Board meeting)
“an informational permit must be issued by the town board prior to obtaining a building permit and should be submitted to the town zoning administrator, bill hafs 5 days before the monthly town meetings (2nd monday of the month).”
Town of New Denmark does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential dwellings in the Town's A-R Agriculture-Residential District.
minimum dwelling size: >= 1100 square feet
“minimum size of residential dwelling shall be one thousand one hundred (1,100) square feet.”
“minimum size of dwelling shall be one thousand one hundred (1,100) square feet.”
Lots served by public sewer in the Town's R-1 Residential District.
minimum lot area: >= 10000 square feet (public sewer only) · minimum zoning-lot frontage: >= 85 feet (public sewer only)
“lot requirements with public sewer only 1. area – 10,000 square feet minimum 2. zoning lot frontage – 85 feet minimum”
Farm structures and residential dwellings in the Town's A-R Agriculture-Residential District.
maximum farm-structure height: <= 60 feet (Article IV, Subsection E) · maximum residential-dwelling height: <= 35 feet (Article IV, Subsection E)
“farm structures – 60 feet maximum* residential dwellings – 35 feet maximum*”
“all structures – 35 feet maximum, except as provided by article iv, subsection e, height regulations”
We looked and could not find an official answer yet. Silence is not permission; ask Town of New Denmark or Brown County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of New Denmark publishes no rule on the point, not that none exists. Brown County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of New Denmark means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.