Brown County, Wisconsin
Village of Bellevue is a village in Brown County, Wisconsin. Village of Bellevue adopts its own zoning, so inside its limits Village of Bellevue’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Brown County page.
Building, additions, alterations, structural changes, and major mechanical-system extensions inside Bellevue village limits.
“No person shall build, add onto, or alter any structure without first obtaining a building permit.”
Building construction inside Bellevue village limits.
“The following Wisconsin Administrative Codes, their referenced codes and standards, and subsequent revisions are adopted for municipal enforcement by the Building Inspector, who shall be residentially and commercially certified by the Wisconsin Division of Safety and Buildings:”
Land and buildings subject to Bellevue's floodplain regulations.
“No land shall be occupied or used, and no building which is hereafter constructed, altered, added to, modified, repaired, rebuilt or replaced shall be occupied until a certificate of compliance is issued by the Zoning Administrator, except where no permit is required, subject to the following provisions:”
Land inside Bellevue village limits.
“[Adopted by the Bellevue Board 12-10-2014. Amendments noted where applicable.]”
Zoning districts inside Bellevue village limits.
“Part 500-500 Residential Districts (§ 500-501 – § 500-511) [...] Part 500-600 Business Districts (§ 500-601 – § 500-607) [...] Part 500-700 Industrial Districts (§ 500-701 – § 500-707) [...] Part 500-800 Agricultural Districts (§ 500-801 – § 500-806)”
Trailers, including travel trailers, outside an approved mobile-home park inside Bellevue village limits.
maximum special-permit duration: <= 60 days (Per premises in any 12-month period.)
“Upon a showing of hardship and/or immediate necessity for use, the Community Development Director or designee may issue special written permits allowing the location of a mobile home outside of a mobile home park for a period not to exceed 60 days for any one premises in any twelve-month period.”
Divisions of land within Bellevue village limits.
“Subdivision. Any division of land within the Village which results in a subdivision as defined herein shall have a plat thereof prepared, approved and recorded as required by this chapter and Ch. 236, Wis. Stats.”
Development, repair, modification, additions, and changes of building or structure use in areas governed by Bellevue's floodplain regulations.
permit expiration: <= 180 days (May be extended a maximum of 180 days for good and sufficient cause.)
“A land use permit shall be obtained before any development; repair, modification or addition to an existing structure; or change in the use of a building or structure, including sewer and water facilities, may be initiated.”
Village building permits.
“The building permit fee shall be determined and approved by the Village Board.”
Village building-permit applications inside Bellevue village limits.
“Building permits required by the Village shall be submitted to the Building Inspector on forms provided as per Article XXXVII of the Village Zoning Ordinance. No work shall commence until the issuance of such permit.”
Village of Bellevue does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Dwellings in the R-1, R-2, and RR zoning districts inside Bellevue village limits.
minimum floor area, one- or two-bedroom dwelling: 1000 square feet (R-1, R-2, and RR districts.) · minimum floor area, three-bedroom dwelling: 1125 square feet (R-1, R-2, and RR districts.) · minimum floor area, four-bedroom dwelling: 1300 square feet (R-1, R-2, and RR districts.) · minimum floor area, five-bedroom dwelling: 1600 square feet (R-1, R-2, and RR districts.) · minimum floor area, six-bedroom-or-more dwelling: 2000 square feet (R-1, R-2, and RR districts.)
“One-bedroom dwelling: 1,000 square feet. [...] Two-bedroom dwelling: 1,000 square feet. [...] Three-bedroom dwelling: 1,125 square feet. [...] Four-bedroom dwelling: 1,300 square feet. [...] Five-bedroom dwelling: 1,600 square feet. [...] Six-bedroom or more dwelling: 2,000 square feet.”
Single-family detached dwellings in the R-1 and RR zoning districts inside Bellevue village limits.
R-1 minimum lot area with public sewer: 11000 square feet (Single-family detached dwelling.) · R-1 minimum lot area without public sewer: 40000 square feet (Single-family detached dwelling.) · RR minimum lot area: 5 acres (Single-family detached dwelling, with or without public sewer.)
“Single-family detached dwelling | 11,000 | 6,000 | 7,500 | 12,000 | 13,000 | 5 acres [...] Without public sewer [...] Single-family detached dwelling | 40,000 | — | — | — | — | 5 acres”
Primary structures in R-1 and RR zoning districts inside Bellevue village limits.
R-1 primary front setback: 30 feet (From right-of-way.) · R-1 primary side setback: 8 feet (Each side.) · R-1 primary rear setback: 25 feet · RR primary front setback: 30 feet (From right-of-way.) · RR primary side setback: 10 feet (Each side.) · RR primary rear setback: 25 feet
“Front yard (from ROW) | 30 | 25 | 25 | 30 | 30 | 30 [...] Side yard | 8 each | 6 each | 6 each | 8 each | 20 each | 10 each [...] Rear yard | 25 | 20 | 20 | 25 | 25 | 25”
R-1 and RR zoning districts inside Bellevue village limits.
R-1 maximum impervious surface coverage: 50 percent · RR maximum impervious surface coverage: 40 percent
“Maximum Impervious Surface Coverage [...] 50% | 65% | 60% | 50% | 50% | 40%”
Primary structures in R-1 and RR zoning districts inside Bellevue village limits.
maximum primary-structure height, R-1: 35 feet · maximum primary-structure height, RR: 35 feet
“Primary structures | 35 | 35 | 35 | 35 | 35 | 35”
We looked and could not find an official answer yet. Silence is not permission; ask Village of Bellevue or Brown County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Village of Bellevue publishes no rule on the point, not that none exists. Brown County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Village of Bellevue means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.