Bolthole Index

Spokane County, Washington

Building permits, zoning and septic rules in Millwood, Washington

Millwood, Washington requires a written city permit for new buildings, specified alterations and property-use changes.1 Millwood sets zoning and handles required site-plan approval, while Spokane Valley handles building permitting and inspections for the city.23 Septic systems in Spokane County are regulated by Spokane Regional Health District, separately from city building approval.4

At a glance

Building permits
Required; building permitting and inspections through Spokane Valley15
Zoning
Millwood zoning applies inside city limits2
Site-plan review
Required reviews need Millwood approval before building permit approval3
Septic permits
Spokane Regional Health District handles new systems and changes to existing systems6
Tiny homes
State-code compliance and local approval required; Millwood siting eligibility needs confirmation7
Owner-built homes
Conditional contractor-registration exemption; building approval still applies81

Who to call

Planning & zoning

City of Millwood — City Planner / City Hall

Millwood zoning inquiries, site-plan approval, commercial project coordination and city-issued permit routing

(509) 924-0960

[email protected]

9103 E Frederick Ave | Spokane, WA 99206

Building permits

Spokane Valley Permit Center — building services for Millwood

Building permitting and inspections under Millwood’s partnership with Spokane Valley

(509) 720-5240

10210 E. Sprague Ave.Spokane Valley, WA 99206

Septic permits

Spokane Regional Health District — Liquid Waste Program

Septic system permitting, design review and inspections in Spokane County

509.324.1560 ext. 1

1101 W. College Ave., Spokane, WA 99201

Contact details are copied from each office’s official page and were checked against it on October 11, 2026.

Off-grid gear

Going off-grid in Millwood means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Millwood, WA?

Millwood requires a written city permit before erecting a building or structure, making an alteration that changes use or occupancy, or instituting or changing a property use.1 Millwood’s zoning provision exempts one-story detached tool and storage sheds, playhouses and similar accessory buildings with floor area no greater than 120 square feet; ask the City Planner how that exemption fits your proposed project.13 Washington’s State Building Code still applies inside Millwood, so a permit exemption does not establish freedom from construction standards.9 Millwood’s city council sets fees by resolution for building, change-of-use, demolition, fence, manufactured-home, mechanical and plumbing permits; request the current charges for your project rather than budgeting from a county fee schedule.10

Who handles Millwood building permits and inspections?

Millwood partners with the City of Spokane Valley for building permitting and inspections; contact the Spokane Valley Permit Center at (509) 720-5240.5 The inspection request line is (509) 720-5350.5 Required site-plan review must receive Millwood approval before building permit approval, and site-plan review fees may be payable to Millwood.3 Start zoning and site-plan questions with Millwood’s City Planner at [email protected], or call City Hall at (509) 924-0960.3 Commercial building permits are coordinated by the City Planner, including civil-plan and drainage review through the City Engineer.3

Does Millwood have zoning, lot-size rules and setbacks?

Millwood has its own zoning regulations for land inside city limits.2 Millwood’s supplementary-use regulations make permitted uses conditional on the applicable district’s use table; an available parcel is not automatically eligible for the use you have in mind.11 Before buying, ask the Millwood City Planner to confirm the parcel’s district, allowed residential use, minimum lot area, setbacks, height and lot coverage for your proposed building.3 We could not confirm a general Millwood minimum lot size or setback schedule, so obtain the parcel-specific standards from the City Planner before drawing a site plan.3 For land outside city limits, use the Spokane County guide: county zoning governs unincorporated Spokane County.12

How do septic permits work inside Millwood?

Spokane Regional Health District issues septic permits for new on-site sewage systems and changes to existing systems serving homes and other qualifying buildings with flows below 3,500 gallons per day.6 Millwood building approval and septic approval are separate: send sewage-system questions to the district’s Liquid Waste Program at 509.324.1560 ext. 1.313 Washington requires an on-site sewage permit before covered installation, repair, modification, connection or expansion work begins, with an exception for minor repairs.14 SRHD reviews designs and inspects systems after installation; inspection and maintenance are required before renewable permit renewal.15 Ask Millwood about available sewer service before planning a septic system; City Hall retains utility permits.3

Can you live in an RV or tiny home in Millwood?

We could not confirm permission for long-term RV occupancy on private land in Millwood; ask the City Planner about the proposed address and use before relying on an RV as housing during construction.3 Millwood’s prohibition on camping in city-owned or city-maintained areas does not establish a private-land RV rule.16 Washington recognizes tiny houses, including qualifying houses on wheels, but requires State Building Code compliance and local approval for foundation, installation and location.7 A wheeled structure may instead be classified as an RV or park model, so have the building office establish the classification and ask Millwood to confirm the residential use before purchase.753

What are the steps to building a home in Millwood?

  1. Ask Millwood’s City Planner to confirm the intended use and whether site-plan review is required; obtain required Millwood site-plan approval before building permit approval.23
  2. Confirm water and sewer arrangements with Millwood City Hall; if an on-site sewage system is proposed, obtain the applicable SRHD septic approval before sewage-system construction.3146
  3. Arrange building permitting and inspections through the Spokane Valley Permit Center, Millwood’s building-services partner.5
  4. Ask Millwood which utility, grading, driveway approach or right-of-way permits the project also needs; those permit types remain with City Hall.3
  5. If building your own home, confirm the Washington contractor-registration exemption applies to your circumstances; the exemption does not remove building or other approval requirements.8

What else should you check before buying land in Millwood?

Ask Millwood City Hall about water and sewer service and the approvals needed for a new connection; utility permits remain with the city.3 If considering a well, Washington’s domestic groundwater exemption covers up to 5,000 gallons per day per project, with withdrawals from multiple wells aggregated; local requirements and other water-law restrictions can still apply.17 Ecology must receive a notice of intent 72 hours before drilling, and that notice does not approve water use.17 For development in a floodplain, Washington directs applicants to the local government for floodplain development approval; ask Millwood to identify the applicable review before committing to a building site.18

Watch-outs

  • Millwood’s written zoning permit expires after 1 year unless the authorized structure is completed or the authorized use is instituted; ask Millwood how that deadline applies alongside the building permit.19
  • A Millwood small-accessory-building exemption does not establish approval to occupy the structure as a tiny home.17
  • Confirm private-land RV occupancy with the Millwood City Planner before using an RV as temporary housing.3

Sources

  1. Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Millwood), quoted and re-checked
  2. Millwood Municipal Code Title 17, Appendix A—Definitions (Millwood), quoted and re-checked
  3. City of Millwood — City Planner / City Hall (millwoodwa.us)
  4. Septic Systems, quoted and re-checked
  5. Spokane Valley Permit Center — building services for Millwood (millwoodwa.us)
  6. New Systems or Changes to Existing Systems, quoted and re-checked
  7. Tiny Houses (Washington statewide rule), quoted and re-checked
  8. RCW 18.27.090 — Exemptions (Washington statewide rule), quoted and re-checked
  9. RCW 19.27.031 — State building code—Adoption—Conflicts—Opinions (Washington statewide rule), quoted and re-checked
  10. Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Millwood), quoted and re-checked
  11. Millwood Municipal Code § 17.16.010—Supplementary use regulations (Millwood), quoted and re-checked
  12. County Code, quoted and re-checked
  13. Spokane Regional Health District — Liquid Waste Program (srhd.org)
  14. WAC 246-272A-0200 Permit requirements (Washington statewide rule), quoted and re-checked
  15. New Systems or Changes to Existing Systems, quoted and re-checked
  16. Millwood Municipal Code § 12.12.030—Unlawful camping (Millwood), quoted and re-checked
  17. Groundwater permit exemption (Washington statewide rule), quoted and re-checked
  18. Planning & regulation — Washington State Department of Ecology (Washington statewide rule), quoted and re-checked
  19. Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Millwood), quoted and re-checked

Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Millwood

Millwood’s own rules

  • Building permitRequired

    Erecting a building or structure, specified alterations, or instituting or changing a property use within Millwood city limits.

    • Permit is in writing from the city.
    • Permit expires one year after issuance unless the authorized structure or use is completed or instituted.
    • One-story detached tool/storage sheds, playhouses, and similar accessory buildings not exceeding 120 square feet are exempt from this section.

    accessory-building exemption floor area: <= 120 square feet (One-story detached tool and storage sheds, playhouses, and similar uses.)

    “No person, company or corporation shall erect a building or structure of any kind, or alter any building or structure already erected when said alteration is made for the purpose of changing the use or purpose of occupancy, or institute or change a property use, without first obtaining a permit, in writing, from the city.”
  • Local zoningPresent (with conditions)

    Land within Millwood city limits.

    • Title 17 controls over Titles 1 and 15 where there is a conflict.
    “For the purpose of this title, certain words and terms are defined as set out in this section.”
  • Zoning districtsPartial

    Zoning within Millwood city limits.

    • The supplied section refers to Table 17-1, but the table and its district list were not supplied.
    “Where permitted pursuant to Table 17-1, the following conditions shall apply”
  • Camping on your landLimited

    Camping in city-owned or city-maintained areas within Millwood city limits.

    • The prohibition does not apply where otherwise provided by the Millwood Municipal Code or specifically designated.
    • This claim does not establish a rule for camping on private land.
    “It is unlawful for any person to camp in the following city-owned and/or city-maintained areas, except as otherwise provided by the Millwood Municipal Code or where specifically designated:”
  • Permit feesVariable (with conditions)

    Structural-moving, building, change-of-use, demolition, fence, manufactured-home, mechanical, and plumbing permits in Millwood city limits.

    • Fees are set by city-council resolution; this section does not state dollar amounts.
    “The city council shall set by resolution, fees for structural moving applications and the following permits: building, change of use, demolition, fence, manufactured home, mechanical, and plumbing.”
  • Permit processPartial

    The zoning permit process for specified construction and use changes in Millwood city limits.

    • Written city permit must be obtained first.
    • Permit expires one year after issuance unless completion or institution occurs.
    • Specified small one-story detached accessory buildings are exempt.

    permit expiration: 1 year after issuance (Unless the permittee has completed the authorized structure(s) or instituted the authorized use.)

    “Any permit shall expire at the end of one year after issuance unless the permittee has completed the structure or structures or instituted the use authorized by said permit.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Millwood or Spokane County directly.

  • Owner-builder exemption — Owner-built construction within Millwood city limits.
  • Building code adopted — Construction within Millwood city limits.
  • Inspections — Construction within Millwood city limits.
  • Certificate of occupancy — Occupancy of structures within Millwood city limits.
  • Minimum dwelling size — Dwellings inside Millwood city limits.
16 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Tiny homes
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Millwood publishes no rule on the point, not that none exists. Spokane County’s page lists the county offices to call.

← All of Spokane County: county rules, score and offices