Millwood, Washington requires a written city permit for new buildings, specified alterations and property-use changes.1 Millwood sets zoning and handles required site-plan approval, while Spokane Valley handles building permitting and inspections for the city.23 Septic systems in Spokane County are regulated by Spokane Regional Health District, separately from city building approval.4
At a glance
- Building permits
- Required; building permitting and inspections through Spokane Valley15
- Zoning
- Millwood zoning applies inside city limits2
- Site-plan review
- Required reviews need Millwood approval before building permit approval3
- Septic permits
- Spokane Regional Health District handles new systems and changes to existing systems6
- Tiny homes
- State-code compliance and local approval required; Millwood siting eligibility needs confirmation7
- Owner-built homes
- Conditional contractor-registration exemption; building approval still applies81
Who to call
Planning & zoning
City of Millwood — City Planner / City Hall
Millwood zoning inquiries, site-plan approval, commercial project coordination and city-issued permit routing
9103 E Frederick Ave | Spokane, WA 99206
Building permits
Spokane Valley Permit Center — building services for Millwood
Building permitting and inspections under Millwood’s partnership with Spokane Valley
10210 E. Sprague Ave.Spokane Valley, WA 99206
Septic permits
Spokane Regional Health District — Liquid Waste Program
Septic system permitting, design review and inspections in Spokane County
1101 W. College Ave., Spokane, WA 99201
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Millwood means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Millwood, WA?
Millwood requires a written city permit before erecting a building or structure, making an alteration that changes use or occupancy, or instituting or changing a property use.1 Millwood’s zoning provision exempts one-story detached tool and storage sheds, playhouses and similar accessory buildings with floor area no greater than 120 square feet; ask the City Planner how that exemption fits your proposed project.13 Washington’s State Building Code still applies inside Millwood, so a permit exemption does not establish freedom from construction standards.9 Millwood’s city council sets fees by resolution for building, change-of-use, demolition, fence, manufactured-home, mechanical and plumbing permits; request the current charges for your project rather than budgeting from a county fee schedule.10
Who handles Millwood building permits and inspections?
Millwood partners with the City of Spokane Valley for building permitting and inspections; contact the Spokane Valley Permit Center at (509) 720-5240.5 The inspection request line is (509) 720-5350.5 Required site-plan review must receive Millwood approval before building permit approval, and site-plan review fees may be payable to Millwood.3 Start zoning and site-plan questions with Millwood’s City Planner at [email protected], or call City Hall at (509) 924-0960.3 Commercial building permits are coordinated by the City Planner, including civil-plan and drainage review through the City Engineer.3
Does Millwood have zoning, lot-size rules and setbacks?
Millwood has its own zoning regulations for land inside city limits.2 Millwood’s supplementary-use regulations make permitted uses conditional on the applicable district’s use table; an available parcel is not automatically eligible for the use you have in mind.11 Before buying, ask the Millwood City Planner to confirm the parcel’s district, allowed residential use, minimum lot area, setbacks, height and lot coverage for your proposed building.3 We could not confirm a general Millwood minimum lot size or setback schedule, so obtain the parcel-specific standards from the City Planner before drawing a site plan.3 For land outside city limits, use the Spokane County guide: county zoning governs unincorporated Spokane County.12
How do septic permits work inside Millwood?
Spokane Regional Health District issues septic permits for new on-site sewage systems and changes to existing systems serving homes and other qualifying buildings with flows below 3,500 gallons per day.6 Millwood building approval and septic approval are separate: send sewage-system questions to the district’s Liquid Waste Program at 509.324.1560 ext. 1.313 Washington requires an on-site sewage permit before covered installation, repair, modification, connection or expansion work begins, with an exception for minor repairs.14 SRHD reviews designs and inspects systems after installation; inspection and maintenance are required before renewable permit renewal.15 Ask Millwood about available sewer service before planning a septic system; City Hall retains utility permits.3
Can you live in an RV or tiny home in Millwood?
We could not confirm permission for long-term RV occupancy on private land in Millwood; ask the City Planner about the proposed address and use before relying on an RV as housing during construction.3 Millwood’s prohibition on camping in city-owned or city-maintained areas does not establish a private-land RV rule.16 Washington recognizes tiny houses, including qualifying houses on wheels, but requires State Building Code compliance and local approval for foundation, installation and location.7 A wheeled structure may instead be classified as an RV or park model, so have the building office establish the classification and ask Millwood to confirm the residential use before purchase.753
What are the steps to building a home in Millwood?
- Ask Millwood’s City Planner to confirm the intended use and whether site-plan review is required; obtain required Millwood site-plan approval before building permit approval.23
- Confirm water and sewer arrangements with Millwood City Hall; if an on-site sewage system is proposed, obtain the applicable SRHD septic approval before sewage-system construction.3146
- Arrange building permitting and inspections through the Spokane Valley Permit Center, Millwood’s building-services partner.5
- Ask Millwood which utility, grading, driveway approach or right-of-way permits the project also needs; those permit types remain with City Hall.3
- If building your own home, confirm the Washington contractor-registration exemption applies to your circumstances; the exemption does not remove building or other approval requirements.8
What else should you check before buying land in Millwood?
Ask Millwood City Hall about water and sewer service and the approvals needed for a new connection; utility permits remain with the city.3 If considering a well, Washington’s domestic groundwater exemption covers up to 5,000 gallons per day per project, with withdrawals from multiple wells aggregated; local requirements and other water-law restrictions can still apply.17 Ecology must receive a notice of intent 72 hours before drilling, and that notice does not approve water use.17 For development in a floodplain, Washington directs applicants to the local government for floodplain development approval; ask Millwood to identify the applicable review before committing to a building site.18
Watch-outs
- Millwood’s written zoning permit expires after 1 year unless the authorized structure is completed or the authorized use is instituted; ask Millwood how that deadline applies alongside the building permit.19
- A Millwood small-accessory-building exemption does not establish approval to occupy the structure as a tiny home.17
- Confirm private-land RV occupancy with the Millwood City Planner before using an RV as temporary housing.3
Sources
- Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Millwood), quoted and re-checked
- Millwood Municipal Code Title 17, Appendix A—Definitions (Millwood), quoted and re-checked
- City of Millwood — City Planner / City Hall (millwoodwa.us)
- Septic Systems, quoted and re-checked
- Spokane Valley Permit Center — building services for Millwood (millwoodwa.us)
- New Systems or Changes to Existing Systems, quoted and re-checked
- Tiny Houses (Washington statewide rule), quoted and re-checked
- RCW 18.27.090 — Exemptions (Washington statewide rule), quoted and re-checked
- RCW 19.27.031 — State building code—Adoption—Conflicts—Opinions (Washington statewide rule), quoted and re-checked
- Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Millwood), quoted and re-checked
- Millwood Municipal Code § 17.16.010—Supplementary use regulations (Millwood), quoted and re-checked
- County Code, quoted and re-checked
- Spokane Regional Health District — Liquid Waste Program (srhd.org)
- WAC 246-272A-0200 Permit requirements (Washington statewide rule), quoted and re-checked
- New Systems or Changes to Existing Systems, quoted and re-checked
- Millwood Municipal Code § 12.12.030—Unlawful camping (Millwood), quoted and re-checked
- Groundwater permit exemption (Washington statewide rule), quoted and re-checked
- Planning & regulation — Washington State Department of Ecology (Washington statewide rule), quoted and re-checked
- Millwood Municipal Code § 17.44.040—Permit required for erection or alteration (Millwood), quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.