Snohomish County, Washington
Mukilteo is a city in Snohomish County, Washington. Mukilteo adopts its own zoning, so inside its limits Mukilteo’s rules apply, not the county’s. Septic permits inside Mukilteo come from Mukilteo. 12 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Snohomish County page.
Construction inside Mukilteo city limits.
residential accessory-structure exemption threshold: <= 200 square feet (Must be one-story, detached, nonhabitable, unheated, and meet the additional conditions in § 15.04.040(A)(1).)
“Exemptions From Building Permits. The following do not require a building permit but are still subject to applicable safety standards and may require environmental or land use permit review:”
Buildings and construction inside Mukilteo city limits.
International Residential Code edition: 2021 (Together with state amendments in WAC Chapter 51-51, including Appendix Q.)
“The 2021 Edition of the International Residential Code, as published by the ICC, together with state amendments as set forth in Chapter 51-51 WAC including:”
Land inside Mukilteo city limits.
“In order to implement the comprehensive plan, to provide for protection of property and to preserve the health, safety and welfare of the community, the city is divided into the following classes of districts:”
Trailers or mobile homes used for living purposes in residential zoning districts inside Mukilteo city limits.
maximum cumulative period: <= 2 weeks per calendar year (Unless associated with active construction of a residence.)
“The temporary use of trailers or mobile homes for living purposes in residential zoning district may not exceed a cumulative total of two weeks each calendar year unless it is associated with active construction of a residence.”
Temporary encampments inside Mukilteo city limits.
“Temporary encampments must comply with Chapter 17.78, Homeless Temporary Encampments.”
Accessory dwelling units on single-family residential lots inside Mukilteo city limits.
maximum ADUs: <= 2 ADUs per single-family residential lot (Not allowed in cottage housing developments.) · maximum habitable floor area: <= 1000 square feet
“Maximum Number of Units. A maximum of two accessory dwelling units are allowed on a single-family residential lot. Accessory dwelling units are not allowed in cottage housing developments.”
Residential lots with accessory dwelling units inside Mukilteo city limits.
driveways per residential lot: 1 driveway (Unless the Director approves an exception based on unusual circumstances.)
“Access. Each residential lot is limited to one driveway unless the director approves an exception based on unusual circumstances. No new frontage improvements are required for the installation of an ADU.”
Development proposals in special flood-hazard areas inside Mukilteo city limits.
“All development proposals in special flood hazard areas shall be subject to the provisions of Chapter 15.12, Flood Damage Prevention. All studies shall be prepared by a registered professional engineer licensed in the state of Washington. At the city's option, the studies/plans may be reviewed by a consultant retained by the city at the applicant's expense.”
City building-code permits inside Mukilteo city limits.
“Fees shall be as set forth by city council resolution.”
City permit applications and resubmittals inside Mukilteo city limits.
“We've gone digital! Please submit permit applications and materials at the link above. Access application forms, submittal checklists, and other resources.”
Mukilteo does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
RD 9.6 and RD 9.6(S) zoning districts inside Mukilteo city limits.
minimum lot area: 9600 square feet (RD 9.6 and RD 9.6(S).)
“Lot Bulk Matrix. Zone | Minimum Lot Area | Maximum Density | Minimum Lot Width | Minimum Lot Depth RD 12.5/12.5(S) | 12,500 sf | Each lot may have 1 duplex or 1 single-family dwelling with up to 2 ADUs | 50' for internal lots 60' for corner lots | 85' RD 9.6/9.6(S) | 9,600 sf”
We looked and could not find an official answer yet. Silence is not permission; ask Mukilteo or Snohomish County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Mukilteo publishes no rule on the point, not that none exists. Snohomish County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Mukilteo means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.