Snohomish County, Washington
Brier is a city in Snohomish County, Washington. 11 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Snohomish County page.
Buildings inside Brier city limits.
“The 2021 Edition of the International Building Code, including Appendix E, the 2021 International Existing Building Code and the International Swimming Pool and Spa Code published by the International Code Council is hereby adopted by reference with the exceptions noted in Chapter 50-51 WAC and this chapter.”
Factory-built modular and mobile housing inside Brier city limits.
“All factory-built modular and mobile housing as provided for in this chapter shall be subject to inspection by city officials in the same manner and fashion as other single-family residential housing”
Zoning districts inside Brier city limits.
“Chapter 17.29 SINGLE-FAMILY RESIDENTIAL – RS 12,500 (§ 17.29.010 – § 17.29.030)”
Manufactured, modular, and factory-built houses inside Brier zones permitting a single-family residence.
“Establishment and use of a manufactured home, modular house, or factory-built house, as defined in this chapter, shall be permitted in any zone permitting installation of a single-family residence”
Lots inside Brier where a new or existing single-family dwelling is allowed.
maximum ADUs per lot: <= 2 ADUs (Lot may contain one single-family dwelling unit and a maximum of two ADUs.) · maximum ADU floor area: <= 1000 square feet (Exclusive of garages, porches, storage areas, and unfinished basements.)
“Two ADUs may be created per lot. The lot shall only contain one single-family dwelling unit and a maximum of two ADUs.”
Accessory dwelling units inside Brier city limits.
“Any ADU segregated from the principal unit for ownership purposes shall be connected to public sewer and may not utilize an on-site septic system.”
Middle-housing development inside Brier city limits.
total driveway-approach width per frontage: <= 40 feet · individual driveway-approach width: <= 24 feet
“The total width of all driveway approaches shall not exceed forty feet per frontage, as measured at the property line. Individual driveway approaches shall not exceed twenty-four feet in width.”
Building permits inside Brier city limits.
“Fees shall be set forth in a fee resolution adopted, and from time to time amended, by the city council.”
Brier does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
RS 12,500 single-family residential district inside Brier city limits.
minimum lot area: >= 12500 square feet
“Minimum lot area: twelve thousand five hundred square feet.”
RS 12,500 single-family residential district inside Brier city limits.
front yard: >= 35 feet (Measured from lot line abutting public right-of-way; other specific conditions apply.) · minimum side yard: >= 7 feet (On one side; combined two side yards must be at least 20 feet.) · rear yard: >= 25 feet
“Side yard: seven feet minimum on one side. The combined total of the two side yards shall be a minimum of twenty feet.”
RS 12,500 single-family residential district inside Brier city limits.
maximum lot coverage: <= 45 percent
“Maximum lot coverage: forty-five percent.”
We looked and could not find an official answer yet. Silence is not permission; ask Brier or Snohomish County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Brier publishes no rule on the point, not that none exists. Snohomish County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Brier means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.