Garfield County, Washington
Pomeroy is a city in Garfield County, Washington. 11 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Garfield County page.
Zoning districts inside Pomeroy city limits.
districts: R-1 Residential; P-1 Public; C-1 Downtown Business; C-2 Multi-Purpose Commercial; C-3 Industrial; A-1 Agricultural/Transition; PD Planned Development
“Residential – R-1 Zone. [...] Public – P-1 Zone. [...] Downtown Business – C-1 Zone. [...] Multi-Purpose Commercial – C-2 Zone. [...] Industrial Zone – C-3 Zone. [...] Agricultural/Transition Zone – A-1 Zone. [...] Planned Development – PD Zone.”
Recreational-vehicle occupancy on land inside Pomeroy city limits.
nonresident visitor occupancy: <= 14 consecutive days (Specific exceptions may be granted.)
“the recreational vehicle may be lived in for a period not to exceed fourteen consecutive days.”
Manufactured and mobile homes inside Pomeroy city limits.
“Manufactured homes which are not lot eligible may be sited only in a manufactured home park or mobile home park/RV park, except by conditional permit or variance.”
Land divisions and subdivision actions inside Pomeroy city limits.
“means any land use or environmental permit or license required from the city for a project action, including but not limited to building permits, subdivisions, binding site plans, planned unit developments”
Construction or development in an area of special flood hazard inside Pomeroy city limits.
“A development permit shall be obtained before construction or development begins within any area of special flood hazard established in Section 3.2.”
Building-permit applications inside Pomeroy city limits.
“Building Permit and Plan Review fees shall be as established from time to time by city of Pomeroy resolution.”
City project-permit applications, including building permits, inside Pomeroy city limits.
“Classification. For the purpose of project permit processing, all development permit applications shall be classified as one of the following: Type I, Type II (A and B), Type III or Type IV (A and B).”
Pomeroy does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Single-family dwellings in Pomeroy's Agricultural/Transition A-1 Zone.
minimum single-family dwelling area: >= 680 sq ft
“Single-family dwelling (680 sq. ft. minimum)”
“Single-family dwelling (680 sq. ft. minimum)”
Structures in Pomeroy's Agricultural/Transition A-1 Zone.
maximum lot coverage by structures: <= 40 percent
“Maximum lot coverage by structures, % | 40 | NA | 100 | 60 | NA | 40”
“Maximum lot coverage by structures, % | 40 | NA | 100 | 60 | NA | 40”
We looked and could not find an official answer yet. Silence is not permission; ask Pomeroy or Garfield County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Pomeroy publishes no rule on the point, not that none exists. Garfield County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Pomeroy means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.