Benton County, Washington
Richland is a city in Benton County, Washington. Richland adopts its own zoning, so inside its limits Richland’s rules apply, not the county’s. Septic permits inside Richland come from the county and state together. 10 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Benton County page.
Building work inside Richland city limits, except work expressly exempted under the adopted codes and City amendments.
IRC exempt detached accessory-structure floor area: <= 200 square feet (Tool and storage sheds, playhouses, and similar uses.) · IBC exempt detached accessory-structure floor area: <= 120 square feet (Tool and storage sheds, playhouses, and similar uses.)
“One-story detached accessory structures used as tool and storage sheds, playhouses, and similar uses, provided the floor area does not exceed 200 square feet (IRC) and 120 square feet (IBC), are exempted from the requirements for a building permit. A permit for location placement of such exempt structures shall be issued by the City of Richland prior to construction or erection of these structures.”
Building construction inside Richland city limits.
“All building and building-related codes as currently adopted, or as shall be adopted in future enactments by the state of Washington pursuant to RCW 19.27.031, together with all amendments as currently enacted, or as shall be enacted by the state of Washington, are hereby adopted as, and are herein referred to as, the building codes for the city of Richland; provided, that all additions, deletions, and amendments as set forth in this title and in RMC Title 20 are also adopted.”
Land inside Richland city limits.
“Title 23 Zoning Regulations (§ 23.01.010 – § 23.70.280)”
Residential zoning districts inside Richland city limits.
residential zone classifications: 5 districts
“Five residential zone classifications permit a variety of housing and population densities without conflict.”
Private sewage disposal serving land inside Richland city limits.
public sanitary sewer availability threshold: < 300 feet (Measured from property line; private system may be used where the public sewer is not available within this distance.)
“Where a public sanitary sewer is not available within 300 feet of the property line under the provisions of RMC § 17.08.040, the building sewer may be connected to a private sewage disposal system complying with the provisions of this title and the requirements of the Benton-Franklin district health department. But, in any event, the building sewer shall be connected with either a public or private sewage disposal system.”
Houses, buildings, and properties used for occupancy, employment, recreation, or other purpose inside Richland city limits that abut or contain a City sanitary-sewer right-of-way.
connection deadline after official notice: <= 90 days
“The owner of each house, building, or property used for human occupancy, employment, recreation, or other purpose, situated within the city and abutting on any street or alley, or abutting on or containing a right-of-way in which there is located a public sanitary sewer of the city, is hereby required at his expense to install suitable toilet facilities therein and to connect such facilities directly with the proper public sewer in accordance with the provisions of this title within 90 days after the date of official notice to do so.”
Richland building permits, related inspections, and development applications inside City limits.
factory-assembled structure installation fee: 300 USD per installation (Notwithstanding other Code provisions; structures attached to factory-assembled structures use valuation-based building-permit and plan-review fees.)
“Notwithstanding any other provision of the Richland Municipal Code, fees for installation of a factory-assembled structure, including structures meeting the requirements of Title 23 of the Richland Municipal Code for manufactured homes or designated manufactured homes, shall be three hundred dollars ($300.00) per installation.”
Development applications inside Richland city limits.
“No application, SEPA review or appeal shall be accepted or processed for action until such fees as set forth in the Richland Municipal Code or city fee schedule have been paid in full.”
Richland does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Construction of a private sewage disposal system inside Richland city limits.
“Before commencement of construction of a private sewage disposal system, the owner, his agent, or his sewer contractor shall first obtain a written private sewer permit issued by the Benton-Franklin district health department.”
We looked and could not find an official answer yet. Silence is not permission; ask Richland or Benton County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Richland publishes no rule on the point, not that none exists. Benton County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Richland means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.