Windsor County, Vermont
Town of Baltimore is a town in Windsor County, Vermont. Town of Baltimore adopts its own zoning, so inside its limits Town of Baltimore’s rules apply, not the county’s. Septic permits inside Town of Baltimore come from the state health agency. 16 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Windsor County page.
Land inside Baltimore town's limits; the town's own Unified Bylaws (zoning and subdivision) apply.
“for the purposes of these bylaws, one rural residential district shall encompass the entire land area of the town of baltimore.”
Land inside Baltimore town's limits
“since there is only one district in baltimore, no zoning map is needed.”
Lots in Baltimore town's Rural Residential District (the only zoning district, covering the entire town)
minimum lot size: 3 acres · minimum lot area per dwelling unit: 3 acres · minimum road frontage: 100 feet
“minimum lot area per dwelling unit minimum lot size minimum road frontage minimum front setback minimum side setback minimum rear setback maximum building height 8-5-2009 3 acres 3 acres 100 feet 100 feet from row (or 125’ from road centerline) 50 feet 50 feet 35 feet”
Lots in Baltimore town's Rural Residential District
minimum front setback: >= 100 feet (from right-of-way; 125 feet from road centerline) · minimum side setback: >= 50 feet · minimum rear setback: >= 50 feet
“minimum lot area per dwelling unit minimum lot size minimum road frontage minimum front setback minimum side setback minimum rear setback maximum building height 8-5-2009 3 acres 3 acres 100 feet 100 feet from row (or 125’ from road centerline) 50 feet 50 feet 35 feet”
Structures in Baltimore town's Rural Residential District
maximum building height: <= 35 feet
“minimum lot area per dwelling unit minimum lot size minimum road frontage minimum front setback minimum side setback minimum rear setback maximum building height 8-5-2009 3 acres 3 acres 100 feet 100 feet from row (or 125’ from road centerline) 50 feet 50 feet 35 feet”
Recreational vehicles (campers, travel trailers) on private land in Baltimore town
continuous dwelling use without approval: <= 1 month (longer use requires zoning board of adjustment approval)
“they may not be used for dwelling purposes for more than one (1) month at a time without approval of the zoning board of adjustment.”
Camping with recreational vehicles on private land in Baltimore town; tent camping not separately addressed
continuous camper dwelling use without approval: <= 1 month (longer use requires zoning board of adjustment approval)
“they may not be used for dwelling purposes for more than one (1) month at a time without approval of the zoning board of adjustment.”
Mobile homes on individual lots in Baltimore town
“mobile homes are allowed on lots as single-family dwelling units. a zoning permit shall be required.”
Accessory dwelling on a lot with one single-family dwelling in Baltimore town
accessory dwelling floor area: <= 30 percent of principal dwelling floor area
“accessory dwellings are permitted throughout town where single-family dwellings are permitted. a zoning permit shall be required.”
Agricultural structures (not dwellings) on land in Baltimore town
“written notification of proposed construction of agricultural structures shall be provided to the zoning administrator by the property owner. no zoning permit shall be required.”
Subdivisions and boundary adjustments of land in Baltimore town
“4. subdivision. applications for subdivisions shall include the information as specified in table 7.2 and as required by the planning commission depending upon the scope and location of the proposed subdivision.”
Driveways and access to public highways in Baltimore town
“(b) a written permit for access to a public highway is required from the baltimore selectboard.”
Zoning permits issued by Baltimore town's zoning administrator
zoning decision timeline: <= 30 days (from receipt of a complete application)
“within thirty (30) days of receipt of a complete application, including all application materials, fees, the zoning administrator shall act to either issue or deny a zoning permit in writing”
Town of Baltimore does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
New wastewater (septic) systems built inside Baltimore town
“modifying or replacing an existing system: if you update an existing water or wastewater system, you will need a permit.”
New potable water supply (well) systems built inside Baltimore town
“building a new water supply or wastewater system: a permit is required for new construction.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Baltimore or Windsor County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Baltimore publishes no rule on the point, not that none exists. Windsor County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Baltimore means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.