Rutland County, Vermont
Town of Pittsford is a town in Rutland County, Vermont. Town of Pittsford adopts its own zoning, so inside its limits Town of Pittsford’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Rutland County page.
Land development (including construction, enlargement, relocation or change of use) inside Pittsford town. This is the town zoning permit; no separate town building permit was found.
“No land development as defined herein, which is subject to these regulations, shall be commenced in the Town of Pittsford until a zoning permit has been issued”
All land inside Pittsford town limits; Pittsford town adopts and administers its own zoning regulations and zoning map.
“The Town of Pittsford hereby establishes the following five (5) major Zoning Districts.”
Land inside Pittsford town limits; the five zoning districts are conservation I and conservation II, rural, village, commercial and industrial.
“A. Conservation I & Conservation II B. Rural C. Village D. Commercial E. Industrial”
Single-family dwellings in the Rural zoning district inside Pittsford town (front, side and rear setbacks in feet)
“RURAL Single family dwelling [...] 40 [...] 25 [...] 25”
Single-family dwellings in the Rural zoning district inside Pittsford town
“minimum lot size maximum lot coverage setbacks (feet) front* side rear minimum frontage (feet)”
Buildings in the Rural zoning district inside Pittsford town
“MAXIMUM BUILDING HEIGHT (feet) [...] RURAL Single family dwelling [...] 40”
Mobile home parks in Pittsford town (conditional use). Individual manufactured homes on single lots were not addressed in the opened text.
minimum land per mobile home lot in park: >= 8000 sq ft
“a minimum of eight thousand (8,000) square feet of land shall be provided for each mobile home lot within a mobile home park.”
Required agricultural practices (RAPS) farm structures in Pittsford town: exempt from the town zoning permit only
“No zoning permit shall be required for the following activities: 1. Required Agricultural Practices (RAPs), including the construction of farm structures”
Zoning permit process in Pittsford town
typical processing time after complete application: 10 days (approximate, per FAQ)
“most town permits are processed within about 10 days from receipt of a complete application.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Pittsford or Rutland County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Pittsford publishes no rule on the point, not that none exists. Rutland County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Pittsford means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.