Town of Strafford is a town in Orange County, Vermont. Town of Strafford adopts its own zoning, so inside its limits Town of Strafford’s rules apply, not the county’s. Septic permits inside Town of Strafford come from the state health agency. 18 rules below are quoted from official sources and independently re-checked, most recently on October 29, 2026. Rules for unincorporated land are on the Orange County page.

Answers from the rulebook for Town of Strafford

Town of Strafford’s own rules

  • Building permitRequired

    Construction, reconstruction, conversion, structural alteration, relocation, or enlargement of a building or other structure inside Strafford town.

    • Exemptions are those specifically exempted by state or federal law or Unified Bylaw §2.2.
    • A complete permitted-use application with the correct fee is to be issued within 30 days and becomes valid 15 days after issuance unless appealed.
    “No land development, change in use or subdivision of land may occur within the Town of Strafford without an Administrative Permit issued by the Administrative Officer unless specifically exempted by state or federal law, or Section 2.2 of this Unified Bylaw.”
  • InspectionsLimited

    Land development subject to Strafford's Unified Bylaw.

    • The Administrative Officer must obtain permission from the owner and any other involved party before entry onto private property.
    • Certificate-of-compliance inspection is performed only as deemed necessary by the Administrative Officer.
    “A Certificate of Compliance shall be issued by the Administrative Officer upon determination, after such inspection deemed necessary, that the building, structure or use is in substantial compliance with the standards and conditions of the Administrative Permit and this Unified Bylaw.”
  • Certificate of occupancyRequired

    Use or occupation of land, a building, structure, or part thereof developed under a Strafford Administrative Permit.

    • No certificate is required for an Administrative Permit issued expressly for subdivision of land without other land development.
    • Applicant must request it in writing, provide applicable RBES or CBES certification, and the Officer must act within 15 days.
    “an applicant must obtain a Certificate of Compliance prior to the use or occupation of any land, building, structure or part thereof.”
  • Local zoningPresent (with conditions)

    Land development inside Strafford town.

    • The Unified Bylaw was adopted by Australian Ballot on November 16, 2023.
    “For the purpose of this Bylaw, the following zoning districts are hereby established within the Town of Strafford:”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Strafford town.

    • District boundaries are established by the Unified Bylaw and associated map; further district-specific use controls apply.

    zoning districts: Village Centers; Rural Residential I; Rural Residential II; Land & Forest Conservation; River Valley Conservation; Miller Pond Shoreline; Elizabeth Mine Water Quality Overlay; Flood Hazard Overlay

    “VILLAGE CENTERS VC RURAL RESIDENTIAL I RR I RURAL RESIDENTIAL II RR II LAND & FOREST CONSERVATION LFC RIVER VALLEY CONSERVATION RVC MILLER POND SHORELINE MP ELIZABETH MINE WATER QUALITY OVERLAY EM FLOOD HAZARD OVERLAY”
  • Manufactured homesAllowed (with conditions)

    Mobile homes, modular housing, and other prefabricated housing inside Strafford town.

    • They are subject to the same terms and conditions on which conventional housing is excluded.
    • Mobile-home parks have additional DRB and state-registration requirements.
    “This Unified Bylaw shall not have the effect of excluding mobile homes, modular housing, or other forms of prefabricated housing, except on the same terms and conditions as conventional housing is excluded.”
  • Agricultural exemptionAvailable (with conditions)

    Accepted agricultural and forestry practices, including construction of farm structures, inside Strafford town.

    • Farm structures must meet Unified Bylaw setbacks unless specifically waived by the Secretary of Agriculture.
    • Flood-hazard-area permitting may still apply.
    “accepted agricultural and forestry practices, including the construction of farm structures, provided setback requirements are met.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Strafford town.

    • Division of a lot into two or more lots requires an Administrative Permit unless exempted.
    • The DRB has authority to approve or deny proposed subdivisions under the Unified Bylaw.
    “Except where exempted under this Unified Bylaw, no person shall undertake the following without an Administrative Permit as provided for in this Unified Bylaw: • the division of a lot into two or more lots;”
  • Driveway accessLimited

    New or modified access onto property inside Strafford town.

    • An access permit from the Selectboard is not a Unified Bylaw permit but is a prerequisite to most Administrative Permits.
    • Construction of a driveway itself is exempt from an Administrative Permit, although a town or state access permit may be needed.
    “An Access Permit from the Selectboard if there is a new or modified access onto the property. This is not a permit under this Unified Bylaw, but is a prerequisite to most Administrative Permits.”
  • Building in a floodplainRequired

    Development located within Strafford's Special Flood Hazard Area.

    • Exempt activities in §IV.D.2 do not require a permit.
    • Conditional-use approval or a DRB variance must be obtained before AO permit issuance when applicable.
    • All other necessary state and federal permits must be obtained before work begins.
    “Except as provided in Section IV D.2 Exempted Activities, a permit is required from the AO for all development that is located within the Special Flood Hazard Area.”
  • Permit feesVariable (with conditions)

    Administrative-permit and conditional-use applications inside Strafford town.

    • Administrative-permit applications must be accompanied by fees set by the Selectboard.
    • The opened materials do not state current dollar amounts.
    “An application for an Administrative Permit shall be filed with the Administrative Officer on forms approved by the DRB, and accompanied by fees set by the Selectboard.”
  • Permit processPublished (with conditions)

    Strafford Administrative Permit applications.

    • Application must be on DRB-approved forms, signed by owner or authorized agent, and accompanied by required fees.
    • Additional surveys, site plans, or drawings may be required.
    • If requested additional information is not provided within 90 days, the application expires and is deemed rejected.
    • The Officer must issue, deny, or refer a complete application within 30 days; failure to act results in a deemed-issued permit on day 31.

    complete application decision deadline: <= 30 days (Issue, deny, or refer after submission of completed application) · additional-information response period: <= 90 days (Before application expires and is deemed rejected)

    “Within 30 days of the submission of a completed application under Section 2.1.3, the Administrative Officer shall either issue or deny the Administrative Permit or refer the application to the DRB.”

Rules another office applies inside Town of Strafford

Town of Strafford does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Minimum lot sizeSpecified

    Rural Residential I District inside Strafford town.

    • Table 2 dimensional requirements apply; existing qualifying small lots have separate §3.1 provisions.

    minimum lot area: >= 3 acres (Rural Residential I District)

    “Lot Area Minimum 1 acre 3 acres 3 acres 3 acres 3 acres 2-10 acres N/A”
  • SetbacksSpecified

    Rural Residential I District inside Strafford town.

    • Front setback is measured from the road centerline.
    • Table 2 dimensional requirements apply.

    front setback minimum: >= 50 ft (Rural Residential I District; measured from road centerline) · side setback minimum: >= 20 ft (Rural Residential I District) · rear setback minimum: >= 20 ft (Rural Residential I District)

    “Front Setback Minimum 45 ft. 50 ft. 50 ft. 50 ft. 50 ft. 50 ft. N/A Side Setback Minimum 15 ft. 20 ft. 20 ft. 20 ft. 20 ft. 20 ft. N/A Rear Setback Minimum 15 ft. 20 ft. 20 ft. 20 ft. 20 ft. 20 ft. N/A”
  • Building heightSpecified

    Rural Residential I District inside Strafford town.

    • Farm structures, silos, private home antennae, belfries, steeples, cupolas, water tanks, chimneys, solar equipment, small-scale wind-energy systems, and other appurtenances not used for human occupancy are excepted under §3.8.
    • A DRB waiver may permit greater height.

    maximum building height: <= 35 ft (Rural Residential I District)

    “all structures, unless otherwise stated, shall not exceed a height of thirty five (35) feet above average ground level unless a waiver is approved by the DRB.”
  • Who permits septicState (with conditions)

    Wastewater systems and potable-water supplies serving development inside Strafford town.

    • Where a land use requires an ANR Potable Water and Wastewater Permit, the permit or deferral must be obtained before Strafford issues its Administrative Permit.
    “An applicant for an Administrative Permit for a land use that requires a Potable Water and Wastewater Permit from the Agency of Natural Resources shall obtain such permit or deferral of permit prior to the issuance of an Administrative Permit.”
  • Septic permitRequired

    New wastewater systems for construction inside Strafford town.

    • Minor repairs and replacement work may be exempt under state rules; this claim concerns new construction.
    • For a local Administrative Permit, required ANR permit or deferral must be obtained first.
    “Building a new water supply or wastewater system: A permit is required for new construction.”
  • Well permitLimited

    New potable-water supplies serving construction inside Strafford town.

    • The state FAQ addresses new construction; its exemptions and special replacement rules are not treated as a universal new-well requirement.
    • A required ANR permit or deferral must precede the local Administrative Permit.
    “Building a new water supply or wastewater system: A permit is required for new construction.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Strafford or Orange County directly.

  • Owner-builder exemption — Owner-builder construction inside Strafford town.
  • Building code adopted — Building-code adoption for construction inside Strafford town.
  • Minimum dwelling size — Single-family dwellings in Strafford town zoning districts.
  • Lot coverage — Lot coverage in Strafford town zoning districts.
  • Living in an RV — Long-term occupancy of recreational vehicles on private land inside Strafford town.
4 more unanswered
  • Tiny homes
  • Septic inspection
  • Mandatory utility hookup
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Strafford publishes no rule on the point, not that none exists. Orange County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Town of Strafford means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Orange County: county rules, score and offices