Lamoille County, Vermont
Town of Elmore is a town in Lamoille County, Vermont. Town of Elmore adopts its own zoning, so inside its limits Town of Elmore’s rules apply, not the county’s. Septic permits inside Town of Elmore come from the state health agency. 20 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Lamoille County page.
Land development and structures inside Elmore town.
“No land development may commence, and no structure may be erected, substantially improved, moved, or changed in use without a zoning permit issued by the Zoning Administrator in accordance with the Act ['4446], unless specifically exempted under Section 1.4.”
Conditional-use development and new development in the Flood Hazard Overlay District inside Elmore town.
inspection decision period: <= 21 working days (Certificate is deemed issued on the 22nd day if the Zoning Administrator does not grant or deny it.)
“Within 21 working days of receipt of the application for a certificate of compliance, the Zoning Administrator will inspect the premises to ensure that all work was completed in conformance with the permit, including all applicable conditions of the DRB.”
Conditional-use development and any new development in Elmore's Flood Hazard Overlay District.
“It shall be unlawful to use or to occupy said land or structure, or part thereof, until a certificate of compliance is issued by the Zoning Administrator stating that the proposed use of the structure or land conforms to the conditions and/or requirements of the Conditional Use Approval and any zoning permit issued in accordance with these regulations.”
Land development and subdivision within Elmore town.
“In accordance with the Vermont Municipal and Regional Planning and Development Act [24 V.S.A., Chapter 117], hereinafter referred to as “the Act,” there is hereby established a Unified Zoning and Subdivision Bylaw for the Town of Elmore as set forth in the text and maps contained herein.”
All land and waters inside Elmore town subject to the official Zoning Map and overlays.
“For the purposes of this Bylaw, the Town of Elmore is divided into the following zoning districts: Village (VLG), Rural-East (R-E), Rural West (R-W), Forest Reserve (FR), Undeveloped Shoreland (USHR), and Developed Shoreland (DSHR). In addition, a Flood Hazard Overlay District (FLD) is established to protect public health and safety. A Remote Area Overlay (RAO) is also established.”
Principal structures in Elmore's Village District.
minimum lot size: 30000 square feet (Principal structure; not applicable if served by Elmore Water Cooperative.)
“Minimum Lot Size: 30,000 sf. principal structure, or NA if served by Elmore Water Cooperative. See Subsection E(5)”
Development in Elmore's Village District.
front yard setback: 15 feet · side yard setback: 15 feet · rear yard setback: 25 feet
“Minimum Front Yard Setback: 15 ft. Minimum Side Yard Setback: 15 ft. Minimum Rear Yard Setback: 25 ft.”
Campers, travel trailers, and recreational vehicles on public or private property inside Elmore town.
maximum dwelling occupancy: <= 30 days per calendar year (One registered camper parked at a principal dwelling.)
“One registered camper may be parked on the premises of a principal dwelling provided that it is parked no closer than six (6) feet to any lot line; is not occupied for dwelling purposes for more than thirty (30) days per calendar year.”
Camper use and camping-related occupancy inside Elmore town.
“Campers are permitted to be parked in approved campgrounds for temporary periods and on construction sites subject to the standards contained in Section 4.14.”
Mobile homes used as accessory farm dwellings inside Elmore town.
maximum accessory farm dwelling units: <= 2 dwelling units (In addition to the primary residence.)
“The accessory farm dwelling is limited to a mobile home, as defined in Article VII;”
One accessory dwelling located within or appurtenant to a single-family dwelling in any Elmore zoning district.
“In accordance with the Act [§4412(1)(E)], one accessory dwelling unit that is located within or appurtenant to a single family dwelling may be allowed as a permitted use in any district subject to review by the Zoning Administrator and the following requirements:”
Subdivisions inside Elmore town that will connect to public or municipal sewage, water, or stormwater systems.
“For subdivisions that will connect to a public or municipal sewage disposal, water supply, or stormwater management system, applications for extensions and hookups shall be approved by the officers and agents entrusted with the care and superintendence of the municipal system.”
Required agricultural and best-management practices, including qualifying farm structures, inside Elmore town.
“Required agricultural and best management practices (RAPs, BMPs), including farm structures, as defined by the Commissioner of Agriculture, Food and Markets in accordance with the Act [§4413(d)]; however written notification, including a sketch plan of the structure showing setback distances from road rights-of-way, property lines, and surface waters shall be made to the Zoning Administrator prior to any construction as required under the AAPs.”
Subdivision of land inside Elmore town.
“Prior to any subdivision of land, construction, or site preparation for development; any contract for the sale of all or any part of the land or structures involved; the issuance of a permit for the erection of any building in a proposed subdivision; and before any subdivision plat may be filed with the Town Clerk, the subdivider or authorized agent shall apply for and secure approval of the proposed subdivision in accordance with the procedures set forth in these regulations.”
Subdivision lots and private roads serving four or more lots inside Elmore town.
“Subdivision lots shall be served by shared driveways and/or internal development roads providing access to multiple lots. With the exception of accesses (curb-cuts) used solely for agricultural or forestry purposes, no lot in existence as of the effective date of these regulations may be served by more than one access.”
New development inside Elmore's Flood Hazard Overlay District.
“Applications for development within the Flood Hazard Overlay District shall be referred to the Floodplain Management Section of the Vermont Department of Environmental Conservation for review. No zoning permit shall be issued until a response has been received from the Department, or the expiration of 30 days following the submission of the application.”
Elmore zoning-permit applications for permitted uses and conditional uses.
zoning administrator decision deadline: <= 30 days (After receipt of a complete application, including materials, fees, and approvals.)
“The Zoning Administrator shall within thirty (30) days of receipt of a complete application, including all application materials, fees and approvals, either issue or deny a zoning permit, or refer the application to the DRB for review.”
Town of Elmore does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Potable-water supplies and wastewater systems serving property inside Elmore town.
“The issuance of a wastewater and potable water supply permit by the Vermont Department of Environmental Conservation assumes conformance with these rules. State wastewater permits shall be obtained prior to recording the approved final plat in the Land Records”
Construction or operation of potable-water supplies and wastewater systems serving property inside Elmore town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system:”
New potable-water supplies serving property inside Elmore town.
“If the proposed subdivision is to be serviced by new or upgraded wells, the applicant shall provide evidence of the location of all proposed wells and evidence that these locations will meet applicable State regulations. The issuance of a wastewater and potable water supply permit by the Vermont Department of Environmental Conservation assumes conformance with these rules.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Elmore or Lamoille County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Elmore publishes no rule on the point, not that none exists. Lamoille County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Elmore means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.