Chittenden County, Vermont
Town of Shelburne is a town in Chittenden County, Vermont. Town of Shelburne adopts its own zoning, so inside its limits Town of Shelburne’s rules apply, not the county’s. Septic permits inside Town of Shelburne come from the state health agency. 8 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Chittenden County page.
A newly erected structure inside Shelburne town, and other projects for which a CO is required.
“A Certificate of Occupancy (CO) is required prior to making use of a newly erected structure, or as otherwise required. A CO will be issued by the Administrative Officer when a project complies with all applicable sections of local bylaws and the applicant has fulfilled all applicable conditions associated with local approvals.”
Land development inside Shelburne town, Chittenden County, Vermont.
“Zoning permits are issued in accordance with procedures spelled out in state law. Most permits become effective 15 days after being signed by the Enforcement Officer (unless appealed by someone qualifying as an ‘interested person’).”
Town development applications, including residential building (zoning) permits, in Shelburne town.
residential new-construction building zoning permit minimum: 750 USD (1-19 units; or $0.50 per square foot, whichever is greater) · residential building zoning permit rate: 0.5 USD per square foot (1-19 units; $750 minimum, whichever is greater)
“Residential New Construction $750 min. or $.50 per sq. ft,* (1-19 units) whichever is greater (includes mobile homes) [...] * Excludes driveway area. Also excludes parking areas. **Projects proposed by the Town or its CBCs are exempt from these fees.”
Town Planning and Zoning permit applications inside Shelburne town.
“Digital (electronic) Submissions are encouraged to accelerate the review process. [...] Complete DRB applications are due by 3:00 p.m. please refer to the filing deadline schedule. [...] Payment must be received before a permit can be issued.”
Town of Shelburne does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Private wastewater systems inside Shelburne town are subject to the Vermont Secretary's wastewater-system permitting rule.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system:”
Construction, physical modification, or replacement of a wastewater system serving land inside Shelburne town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system: (1) the subdivision of a lot or lots; (2) the construction of a new potable water supply or wastewater system; (3) the physical modification or replacement of an existing potable water supply or wastewater system;”
A single-family residence inside Shelburne town using a composting or incinerator toilet.
“The following actions are presumed to not increase the design flow of any component of the potable water supply or wastewater system or modify other operational requirements of a potable water supply or wastewater system: [...] (6) The installation of a composting toilet or incinerator toilet to a single-family residence.”
A new or modified private potable-water supply, including a well where it is the potable-water supply, inside Shelburne town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system: [...] (2) the construction of a new potable water supply or wastewater system; (3) the physical modification or replacement of an existing potable water supply or wastewater system;”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Shelburne or Chittenden County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Shelburne publishes no rule on the point, not that none exists. Chittenden County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Shelburne means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.