Chittenden County, Vermont
Town of Richmond is a town in Chittenden County, Vermont. Town of Richmond adopts its own zoning, so inside its limits Town of Richmond’s rules apply, not the county’s. 14 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Chittenden County page.
Land development inside Richmond town, including residential development requiring a zoning permit.
“A Zoning Permit must be issued prior to the commencement of any land development, unless regulated by 24 VSA §4413 as described in section 5.1.2 of these regulations.”
Property subject to a Richmond certificate-of-occupancy application.
“The Administrative Officer may inspect the subject property and consult with other Town departments as needed to determine compliance prior to the issuance or denial of a complete application for a certificate of occupancy.”
Land inside Richmond town, Chittenden County, Vermont.
“there are hereby established Zoning Regulations for the Town of Richmond which are set forth in the text and maps that constitute these regulations.”
Land inside Richmond town.
“The Town of Richmond is divided into the following Zoning Districts in accordance with the Official Zoning District Map:”
Agricultural, silvicultural, and horticultural uses inside Richmond town.
“Uses regulated by 24 VSA §4413, including agriculture and silviculture; and 30 VSA §248, public utilities –These uses shall be regulated as per section 5.1.2 of these regulations.”
Division of a lot into two or more lots inside Richmond town.
“The division of a lot into two or more lots shall require subdivision approval under the Town of Richmond Subdivision Regulations, except for the following which shall require a Zoning Permit issued by the Administrative Officer:”
Development in Richmond's Flood Hazard Overlay District.
“Except for exempt activities, per Section 6.8.10, a Zoning Permit is required from the Administrative Officer for all Development in all areas within the Flood Hazard Overlay District.”
Richmond Planning and Zoning applications.
“A pre-application meeting with staff is required for all applications before the Development Review Board (DRB), please call to set up an appointment. For more information on permitting, requirements, and permitting processes, refer to the Permitting Flowcharts, and the land use ordinances located on the Ordinances & Policies page.”
Town of Richmond does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Qualifying owner-built residential construction statewide, including Richmond town.
“Residential construction by an owner, if all of the following apply:”
Residential construction statewide, including inside Richmond town.
“Residential construction shall be in compliance with the standards adopted by the Commissioner of Public Service in accordance with subsection (c) of this section.”
Lots proposed for land development in Richmond's Agricultural/Residential (A/R) District.
minimum lot area: >= 1 acre
“Lot Area - No lot shall be less than one (1) acre.”
Lots proposed for land development in Richmond's Agricultural/Residential (A/R) District.
maximum lot coverage: <= 30 percent
“Lot Coverage - The total amount of ground on a lot that can be covered by any structure or impervious material shall not exceed 30%.”
Structures in Richmond's Agricultural/Residential (A/R) District.
maximum structure height: <= 35 feet (except as provided in Section 6.6, Taller Structures)
“The height of any structure shall not exceed thirty-five (35) feet, except as provided in Section 6.6, Taller Structures, of these Zoning Regulations.”
Accessory dwellings in Richmond's Agricultural/Residential (A/R) District.
“The following uses shall be allowed in the A/R District after issuance of a Zoning Permit by the Administrative Officer. Site Plan Review and approval by the DRB pursuant to section 5.5 may be required. a) Accessory dwelling as provided in Section 5.9.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Richmond or Chittenden County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Richmond publishes no rule on the point, not that none exists. Chittenden County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Richmond means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.