Chittenden County, Vermont
Town of Charlotte is a town in Chittenden County, Vermont. Town of Charlotte adopts its own zoning, so inside its limits Town of Charlotte’s rules apply, not the county’s. Septic permits inside Town of Charlotte come from the state health agency. 10 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Chittenden County page.
Zoning-permitted development inside Charlotte town.
“One or more of the following scheduled site inspections may be required in association with the issuance of a zoning permit by the Zoning Administrator under Section 9.3 to ensure that development conforms to permit requirements and these regulations:”
Land inside Charlotte town, Vermont.
“there are hereby established zoning and subdivision regulations for the Town of Charlotte, Vermont. These regulations shall be known and cited as the “Charlotte Land Use Regulations,””
Camper-trailer occupancy on lots inside Charlotte town.
maximum cumulative occupancy: <= 4 months per 12-month period
“Camper trailers may not be occupied for dwelling purposes for more than a cumulative period of four (4) months during a 12-month period. In no case shall a camper trailer be attached to a septic system.”
One accessory dwelling to a single-family dwelling inside Charlotte town, in a district where single-family dwellings are allowed.
accessory dwelling floor-area cap: <= 30 percent of primary dwelling habitable floor area (or 1,500 square feet, whichever is larger) · accessory dwelling floor-area cap: <= 1500 square feet (or 30% of primary dwelling total habitable floor area, whichever is larger)
“one (1) accessory dwelling to a single family dwelling may be allowed in any zoning district in which a single family dwelling is allowed, except in the Shoreland Seasonal Home Management District, subject to the following requirements:”
Charlotte zoning-permit applications.
“The application for a zoning permit must be submitted to the Zoning Administrator on forms provided by the Town, along with any application fees as established by the Selectboard.”
Zoning permits inside Charlotte town.
administrator action period: <= 30 days (complete application, fees, and required approvals)
“Within 30 days of receipt of a complete application, including all application materials, fees and required approvals, the Zoning Administrator shall either refer the application to the appropriate municipal panel, or issue or deny a permit in writing, in accordance with the Act [§4448(d)].”
Town of Charlotte does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Residential uses in Charlotte's Rural District.
minimum lot area: 5 acres per dwelling unit (residential)
“Minimum Lot Area: 5 acres [...] Residential: 5 acres/Dwelling Unit*”
Wastewater systems and potable-water supplies serving land inside Charlotte town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system:”
New or modified wastewater systems serving land inside Charlotte town.
“the construction of a new potable water supply or wastewater system; (3) the physical modification or replacement of an existing potable water supply or wastewater system;”
Development in Charlotte's Flood Hazard Area Overlay District.
“All development within the flood hazard area overlay district, with the exception of allowed and permitted uses within the district as identified in Table 2.11, shall be subject to conditional use review by the Development Review Board under Section 5.4, and the following flood hazard area regulations.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Charlotte or Chittenden County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Charlotte publishes no rule on the point, not that none exists. Chittenden County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Charlotte means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.