Caledonia County, Vermont
Town of Wheelock is a town in Caledonia County, Vermont. Septic permits inside Town of Wheelock come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Caledonia County page.
Driveways, entrances, and approaches affecting a Town of Wheelock highway right-of-way
“within the Town unless an Access Permit has been obtained from the Selectboard in accordance with this Policy.”
Town highway access permits inside Wheelock town
access permit application fee: 25 USD (Paid when the application is submitted to the Town Clerk.) · permit recording fee: 15 USD per page (Set by statute and paid at the expense of the permittee.)
“An application fee of $25.00 shall be paid at the time the application is submitted to the Town Clerk”
Town highway access permits inside Wheelock town
minimum application lead time: >= 14 days (May be modified by the Selectboard or designee for good cause shown if public health and safety will not be jeopardized.)
“The application is to be submitted at least 14 days before work is scheduled to begin.”
Town of Wheelock does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Wastewater (septic) permitting for land inside Wheelock town
“A state permit is required for water (a well) and for wastewater (septic).”
Wastewater (septic) systems for land inside Wheelock town
“A state permit is required for water (a well) and for wastewater (septic).”
Water wells for land inside Wheelock town
“A state permit is required for water (a well)”
Subdivision of land inside Wheelock town
“A state permit may be required for subdivision.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Wheelock or Caledonia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Wheelock publishes no rule on the point, not that none exists. Caledonia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Wheelock means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.