Caledonia County, Vermont
Town of St. Johnsbury is a town in Caledonia County, Vermont. Town of St. Johnsbury adopts its own zoning, so inside its limits Town of St. Johnsbury’s rules apply, not the county’s. 15 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Caledonia County page.
Land development, including residential construction, inside St. Johnsbury town.
“Unless specifically exempted or to the extent limited by this ordinance or applicable statute, no land development may be commenced without a zoning permit theretofore issued by the administrative officer.”
Permitted land-use and development projects inside St. Johnsbury town.
“The Town must perform inspections to determine what happened after a permit is issued. This is the final step in the permitting process. It is initiated by the permit holder.”
Land or structures created, erected, changed, converted, altered, enlarged, used, or occupied after the zoning ordinance's effective date inside St. Johnsbury town.
“It shall be unlawful to use or occupy or permit the use or occupancy of any land or structure, or part thereof to the extent it is created, erected, changed, converted, or wholly or partly altered or enlarged in its use or structure after the effective date of this ordinance, until a certificate of zoning compliance is issued therefore by the administrative officer stating that the use of the structure or land conforms to the requirements of this ordinance and conditions of the permit.”
Land inside the Town of St. Johnsbury, Vermont.
“Planning and Zoning for the town of St. Johnsbury is comprised of the Planning Commission, the Development Review Board, the Design Advisory Committee, and the Zoning Administrator.”
Zoning districts inside St. Johnsbury town.
“These regulations establish the following zoning districts in the Town of St. Johnsbury:”
Manufactured homes on individual lots or in manufactured-home parks inside St. Johnsbury town.
“A manufactured home being placed on its own lot or within a manufactured home park must meet the HUD Standards for Manufactured Home Installation.”
One accessory dwelling unit in any St. Johnsbury zoning district.
maximum accessory dwelling unit area: <= 900 square feet (Or 30% of primary-dwelling habitable floor area, whichever is greater.)
“The following uses are generally permitted in all zoning districts. A zoning permit is required in accordance with Section 202.01.”
Private wastewater disposal for buildings inside St. Johnsbury town located within 250 feet of town public sewer.
public sewer distance: <= 250 feet (Private wastewater installation or repair is otherwise not permitted.)
“Installation of or repair to a private wastewater system servicing a building located within two hundred fifty (250) feet of a public sewer is not permitted unless the Board finds that connection would cause extreme hardship and the private wastewater system would meet all pertinent State rules.”
Properties inside St. Johnsbury town that generate wastewater and abut a street, alley, or right-of-way containing town public sewer within 250 feet of the building requiring service.
public sewer distance: <= 250 feet (Measured from the building requiring service; connection is required after official notice.) · connection deadline: <= 45 days (After date of official notice.)
“The owners of all houses, buildings or properties used for human occupancy, employment, recreation or other purpose situated within the Town and abutting on any street, alley or right-of-way in which there is located a public sewer of the Town, is hereby required, if wastewater is generated, to install suitable toilet facilities therein and to connect such facilities directly with the proper public sewer in accordance with the provisions of this Ordinance, within forty-five (45) days after date of official notice to do so, provided that said public sewer is within two hundred fifty (250) feet (76.2 meters) of the building(s) requiring service.”
Accepted agricultural practices inside St. Johnsbury town.
“Except as otherwise provided by Section 427, a zoning permit shall not be required for the following activities: (A) Accepted agricultural practices and accepted management practices for silviculture, in accordance with 24 V.S.A. § 4413(d).”
Subdivision of land inside St. Johnsbury town.
“No land may be subdivided except with DRB approval. At its option, an applicant may seek DRB approval in one (1) (final) or two (2) stages (preliminary and final).”
Services and permits under the St. Johnsbury Zoning and Subdivision Ordinance.
“The fees for all services provided under this ordinance, including fees for permit review and issuance, hearing notice, and review, and permit recording shall be as set from time to time by the select board and published on a schedule of fees. No action shall be taken on any matter before the payment of applicable fees.”
Zoning-permit applications inside St. Johnsbury town.
“Applications for zoning permits shall be made to the administrative officer on forms provided by the town for that purpose. A zoning permit application shall include the following: (A) Completed zoning application form.”
Town of St. Johnsbury does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Rural (RL) Zoning District inside St. Johnsbury town.
minimum street setback: >= 50 feet · minimum lot-line setback: >= 50 feet
“Lot area/unit: 2 acre min Street setback: 50 ft min”
New buildings, substantial improvements, and floodway land development in Special Flood Hazard Areas inside St. Johnsbury town.
ANR-comment waiting period: <= 30 days (A zoning permit may issue earlier upon ANR comments.)
“A zoning permit may be issued only following receipt of comments from the ANR or the expiration of thirty (30) days from the date the application was mailed to ANR, whichever is sooner.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of St. Johnsbury or Caledonia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of St. Johnsbury publishes no rule on the point, not that none exists. Caledonia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of St. Johnsbury means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.