Caledonia County, Vermont
Town of Kirby is a town in Caledonia County, Vermont. Town of Kirby adopts its own zoning, so inside its limits Town of Kirby’s rules apply, not the county’s. Septic permits inside Town of Kirby come from the state health agency. 22 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Caledonia County page.
Projects in Kirby's Special Flood Hazard Area applying for a certificate of occupancy.
inspection deadline: <= 14 days (after receipt of certificate-of-occupancy application)
“Within 14 days of the receipt of the application for a certificate of occupancy, the ZA shall inspect the premises to ensure that all permits identified on the Project Review Sheet have been acquired and all that all work has been completed in conformance with the zoning permit and associated approvals.”
Dwellings created, erected, changed, converted, altered, enlarged, used, or occupied in areas affected by Kirby zoning regulations.
temporary certificate duration: <= 60 days (at the Administrative Officer's option)
“It shall be unlawful to use or occupy or permit the use or occupancy of any dwelling or part thereof created, erected, changed, converted, or wholly or partly altered or enlarged in its use or structure, within the area affected by such zoning regulations, until a Certificate of Occupancy is issued therefore by the Administrative Officer stating that the proposed use of the dwelling conforms to the requirements of these Zoning Regulations.”
Land inside Kirby town, Caledonia County, Vermont.
“The regulations set forth herein are hereby established as the Zoning Regulations for the Town of Kirby, Vermont. These regulations shall be known and cited as the Kirby Zoning Regulations.”
Land inside Kirby town.
Residential District designation: R · Commercial/Light Industry District designation: C/LI · Special Flood Hazard Area designation: FHA · Highlands District designation: H (lands above 1,800 feet in elevation)
“The zoning map officially entitled "Kirby Zoning Map" is hereby adopted as part of the Zoning Regulations. The Kirby Zoning Map, located in the Town Clerk's office, reflects the division of the town into the following districts: A. Residential District designated “R” on the Kirby Zoning Map and defined as all lands other than those in the Commercial/Light Industry, or Highland or Special Flood Hazard Area. B. Commercial/Light Industry District designated "C/LI" on the Kirby Zoning Map and defined as all lands between the Moose River and U.S. Route 2 and all land lying within 1,500 feet north of U.S. Route 2, but excluding any lands in that area lying within the Special Flood Hazard Area. C. Special Flood Hazard Area designated "FHA" on the Kirby Zoning Map and defined as all land lying within the Special Flood Hazard Area as determined by the National Flood Insurance Program maps. D. Highlands District designed “H” on the Kirby Zoning Map, and defined as all lands lying above 1,800 feet in elevation.”
Lots in Kirby's Residential, Commercial/Light Industrial, Special Flood Hazard, and Highlands Districts.
Residential District lot area: 5 acres · Commercial/Light Industrial District lot area: 5 acres · Special Flood Hazard District lot area: 5 acres · Highlands District lot area: 25 acres
“4.04 Minimum Area and Dimensional Requirements. 1. Lot Area 5 acres”
Structures in Kirby zoning districts.
front setback: >= 75 feet (from road centerline; 50 feet from lot line if no public-road frontage) · side setback: >= 50 feet · rear setback: >= 50 feet
“3. Front setback 75 feet from centerline of road or if no public road frontage, 50 feet from lot line 4. Side setback 50 feet 5. Rear setback 50 feet”
Structures inside Kirby town.
maximum structure height: <= 35 feet (listed personal-use agricultural and energy/antenna structures)
“A Structure shall not exceed thirty five (35) feet in height measured from the highest point of the foundation grade to the highest point of the structure. The foregoing limitation does not apply to the following if installed for personal use: (i) agricultural silos and barns, or (ii) antenna structures, wind turbines with blades less than twenty feet in diameter, or rooftop solar collectors less then ten feet high, any of which are mounted on complying structures.”
Occupied recreational vehicles in Kirby's Residential District.
“4. Day Care Facility 7. Dwelling, Multi-Family 15. Short term rental, 28 days or less 8. Educational Facility 16. Occupied Recreational Vehicles (RV)”
Primitive and seasonal camps in Kirby's Residential District.
“1. Accessory Use 6. Forestry 2. Accessory Dwelling Unit 7. Home Occupation 3. Agriculture 8. Primitive Camp 4. Cemetery 9. Seasonal Camp 5. Dwelling, Single Family 10. Stables”
Manufactured or mobile homes inside Kirby town outside flood-hazard prohibitions.
“Except as provided in Section 4414(1)(E) and (F) of the Act, no zoning regulation shall have the effect of excluding mobile homes, modular housing, or other forms of prefabricated housing from the municipality, except upon the same terms and conditions as conventional housing is excluded.”
Accessory dwelling units in Kirby's Residential District.
“1. Accessory Use 6. Forestry 2. Accessory Dwelling Unit 7. Home Occupation 3. Agriculture 8. Primitive Camp 4. Cemetery 9. Seasonal Camp 5. Dwelling, Single Family 10. Stables”
A dwelling for which a Kirby certificate of occupancy is sought.
“All septic systems must be approved by a licensed engineer and a letter from an engineer shall be given to the Administrative Officer. The Administrative Officer has the option of issuing a temporary Certificate of Occupancy for up to 60 days. It is the responsibility of the permittee to complete the permit process which includes: 1. Ensuring that a licensed engineer inspect and approves the septic system”
Agricultural activities in Kirby's Special Flood Hazard Area.
“Agricultural activities conducted in accordance with the Vermont Department of Agriculture’s Accepted Agricultural Practices (AAP). Prior to the construction of farm structures the farmer must notify the ZA in writing of the proposed activity. The notice must contain a sketch of the proposed structure including setbacks.”
A new driveway or access easement/right-of-way creating access from a public highway inside Kirby town.
driveway distance from nearest side lot line: >= 15 feet (subject to stated common-boundary and waiver provisions)
“A Driveway or access easement or right-of-way creating a new access from a public highway requires a Curb Cut permit from the Selectmen, which shall be condition of any permit issued for Development of the Lot served by the Driveway or access easement or right of way.”
Development in Kirby's mapped Special Flood Hazard Area.
“A permit is required from the Administrative Officer for all development in all areas defined in Section IV. Development that requires conditional use approval, non-conforming use approval, or a variance from the Development Review Board (DRB) under these flood hazard regulations, must have such approvals prior to the issuance of a permit by the ZA. Any development subject to municipal jurisdiction in the designated hazard areas shall meet the criteria in Section VI and VII. Any permit issued will require that all other necessary permits from State or Federal Agencies have been received before work may begin.”
Short-term rentals of 28 days or less in Kirby's Residential District.
short-term-rental duration: <= 28 days
“4. Day Care Facility 7. Dwelling, Multi-Family 15. Short term rental, 28 days or less 8. Educational Facility 16. Occupied Recreational Vehicles (RV)”
Kirby zoning-permit applications.
Administrative Officer action deadline: <= 30 days (after submission of complete application) · approved-activity completion period: <= 2 years (extension may be requested due to unforeseen circumstances) · appeal period: 15 days (permit does not take effect before expiration)
“The Administrative Officer shall not issue a zoning permit without first receiving a complete zoning permit application including a site plan indicating the location of: 1. All structures and proposed structures; 2. Water sources and waste water disposal system (for future reference); 3. Lot lines and measurements and abutters names and addresses; 4. Access roads, driveway or rights-of-way; 5. If applicable, a copy of any instrument creating a private right-of way that provides access to the applicant’s parcel; and 6. If applicable, a copy of the curb-cut approval, and any state and/or federal permits for the proposed Development.”
Town of Kirby does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Potable-water-supply and wastewater-system permitting inside Kirby town.
““Agency” means the Agency of Natural Resources.”
Construction, replacement, or modification of a wastewater system inside Kirby town.
primitive-camp maximum consecutive use: <= 3 weeks per year (no interior plumbing consisting of more than a sink with water) · primitive-camp maximum total use: <= 60 days per year (no interior plumbing consisting of more than a sink with water)
“Except as provided in this section and sections 1974 and 1978 of this title, a person shall obtain a permit from the Secretary before: (1) subdividing land; (2) creating or modifying a campground in a manner that affects a potable water supply or wastewater system or the requirements for providing potable water and wastewater disposal; (3) constructing, replacing, or modifying a potable water supply or wastewater system;”
On-site wastewater disposal and primitive camps inside Kirby town.
“Primitive camps with no interior plumbing consisting of more than a sink with water, that are used no more than three consecutive weeks per year and no more than a total of 60 days per year, shall be exempt. This exemption does not apply to seasonal camps.”
Construction, replacement, or modification of a potable water supply, including a well, inside Kirby town.
“Except as provided in this section and sections 1974 and 1978 of this title, a person shall obtain a permit from the Secretary before: (1) subdividing land; (2) creating or modifying a campground in a manner that affects a potable water supply or wastewater system or the requirements for providing potable water and wastewater disposal; (3) constructing, replacing, or modifying a potable water supply or wastewater system;”
Subdivision of land inside Kirby town.
“Except as provided in this section and sections 1974 and 1978 of this title, a person shall obtain a permit from the Secretary before: (1) subdividing land; (2) creating or modifying a campground in a manner that affects a potable water supply or wastewater system or the requirements for providing potable water and wastewater disposal; (3) constructing, replacing, or modifying a potable water supply or wastewater system;”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Kirby or Caledonia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Kirby publishes no rule on the point, not that none exists. Caledonia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Kirby means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.