Caledonia County, Vermont
Town of Barnet is a town in Caledonia County, Vermont. Town of Barnet adopts its own zoning, so inside its limits Town of Barnet’s rules apply, not the county’s. 13 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Caledonia County page.
Land development inside Barnet town, including construction, reconstruction, structural alteration, relocation, enlargement, and division of a parcel.
small accessory-structure floor area exemption threshold: <= 50 square feet (Not exempt in the Special Flood Hazard Area)
“No person shall commence any land development (as defined by these Bylaws) without a permit issued by the administrative officer.”
Land development inside Barnet town, Caledonia County, Vermont.
“there are hereby established zoning regulations for the Town of Barnet, Vermont, which are set forth in the text and a set of maps that are a constituent of these regulations.”
Zoning districts established by Barnet's zoning bylaws and Official Zoning Map.
“The location and the boundaries of zoning districts are established as shown on the Official Zoning Map, which shall be in the custody of the Town Clerk and is adopted by reference as a part of these zoning bylaws.”
Travel trailers, camping trailers, pick-up coaches, and motor homes on public or private property inside Barnet town.
maximum unpermitted occupancy: <= 60 days per calendar year (Longer occupancy must meet single-family-dwelling requirements) · minimum property-line distance: >= 6 feet (Owner-property parking or storage without permit)
“Any travel trailer occupied by a person for longer than 60 days in a calendar year shall meet the requirements for a single-family dwelling.”
Sewage disposal for development regulated by Barnet zoning.
“All sewage and other effluents shall be disposed of in accordance with state law, so as not to become a hazard to the public health.”
Accepted silvicultural practices, required agricultural practices, and qualifying farm structures inside Barnet town.
“no local zoning permit shall be required for accepted silvicultural practices, as defined by the Commissioner of Forests, Parks and Recreation, including practices which are in compliance with the acceptable Management Practices for Maintaining Water Quality on Logging Jobs in Vermont; or for required agricultural practices, including the construction of farm structures, as defined by 10 V.S.A., Section 6001(22), but excluding a dwelling for human habitation; provided that:”
Division of a parcel into two or more parcels inside Barnet town.
“Development is defined as the division of a parcel into two or more parcels, the construction, reconstruction, conversion, structural alteration, relocation, or enlargement of any building or other structure, or of any mining, excavation or landfill, and any change in the use of any building or other structure, or land, or extension of use of land.”
A Barnet site-plan application involving access to a State highway.
“whenever a proposed site plan involves access to a State highway, the application for site plan approval shall include a letter of intent from the Agency of Transportation confirming that the Agency has reviewed the proposed site plan and is prepared to issue an access permit under 19 V.S.A. § 1111, and setting out any conditions that the Agency proposes to attach to the Section 1111 permit.”
Development in Barnet's designated Special Flood Hazard Areas.
“A permit is required from the administrative officer for all development in all areas defined in Section 413.03. Development that requires conditional use approval, non-conforming use approval, or a variance or waiver from the Board of Adjustment under these flood hazard regulations, must have such approvals prior to the issuance of a permit by the AO.”
Barnet zoning permits and recording fees.
late filing fee multiplier: 2 times original fee (All zoning permits)
“The fee for zoning permits and recording fees shall be set by the Select Board. Late filing fees for all zoning permits shall be two times the original fee.”
Applications for Barnet zoning permits.
administrative-officer action period: <= 30 days (Complete application; issuance or referral required)
“In applying to the administrative officer for a zoning permit, the applicant shall submit a sketch or plan indicating the shape, size, height, and location of any structure to be erected, altered, moved, and of any structure already on that lot in relation to all property and right-of-way lines.”
Town of Barnet does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
RBES compliance for owner-built residential construction inside Barnet town.
“Residential construction by an owner, if all of the following apply: (A) The owner of the residential construction is the builder, as defined under this section. (B) The residential construction is used as a dwelling by the owner.”
Residential construction inside Barnet town, including one-family, two-family, and multifamily housing three stories or less.
“Residential construction shall be in compliance with the standards adopted by the Commissioner of Public Service in accordance with subsection (c) of this section.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Barnet or Caledonia County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Barnet publishes no rule on the point, not that none exists. Caledonia County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Barnet means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.