Addison County, Vermont
Town of Weybridge is a town in Addison County, Vermont. Town of Weybridge adopts its own zoning, so inside its limits Town of Weybridge’s rules apply, not the county’s. Septic permits inside Town of Weybridge come from the state health agency. 21 rules below are quoted from official sources and independently re-checked, most recently on November 7, 2026. Rules for unincorporated land are on the Addison County page.
Land and building development inside Weybridge town.
“A zoning permit issued by the Zoning Administrator is required for any land or building development. Such permit may be issued only in conformance with these Zoning Regulations and other Town ordinances.”
Permitted land or structures inside Weybridge town before a certificate of occupancy is issued.
inspection timing: <= 7 days (After receipt of the Certificate of Occupancy application.)
“Within seven (7) days of receipt of the application for a Certificate of Occupancy, the Zoning Administrator will inspect the premises to ensure that all work was completed in conformance with the permit, including all applicable conditions of the Zoning Board and/or Planning Commission.”
Use or occupancy of land or structures created, erected, changed, converted, altered, enlarged, or changed in use after the zoning regulations' effective date inside Weybridge town.
“It shall be unlawful to use or occupy or permit the use or occupancy of any land or structure, or part thereof created, erected, changed, converted, or wholly or partly altered or enlarged in its use or structure after the effective date of these regulations until a Certificate of Occupancy is issued by the Zoning Administrator.”
Land inside Weybridge town, Addison County, Vermont.
“Town of Weybridge Zoning Regulations Adopted by Selectboard on January 3, 2017”
Zoning districts inside Weybridge town.
zoning districts: Neighborhood Commercial (NC), High Density Residential (HDR), Medium Density Residential (MDR), Planned Agricultural Residential (PAR), Conservation (CON), and Flood Hazard Area (FHA)
“Weybridge is hereby divided into the following zoning districts: Neighborhood Commercial (NC), High Density Residential (HDR), Medium Density Residential (MDR), Planned Agricultural Residential (PAR), Conservation (CON), and Flood Hazard Area (FHA).”
Zoned development inside Weybridge town.
“Consequently, these zoning regulations specify a maximum housing density in each zoning district, rather than a minimum lot size.”
Mobile/manufactured homes inside Weybridge town outside permitted mobile-home parks.
“Mobile homes shall be treated as, and meet all requirements pertaining to, single family homes, except within permitted mobile home parks in accordance with the provisions of Section 411.”
One accessory dwelling unit within or appurtenant to an owner-occupied single-family dwelling inside Weybridge town.
maximum floor space: <= 30 percent (Or 1,500 square feet, whichever is greater.) · conditional-use threshold: > 1500 square feet (Accessory dwelling structures over this size may be approved subject to conditional-use review.)
“One accessory dwelling unit is a permitted use within or appurtenant to an owner-occupied single-family dwelling. [...] Floor space shall not exceed 30 percent of the total habitable floor area of the existing floor area of the single-family residence or 1500 square feet, whichever is greater. [...] Accessory dwelling structures over 1500 square feet may be approved subject to conditional use review.”
Accepted agricultural practices and best management practices, including farm structures, inside Weybridge town.
“No zoning permit shall be required for the following: [...] Accepted agricultural practices (AAPs) and best management practices (BMPs), including farm structures, as defined by the Commissioner of Agriculture, Food and Markets; [...] Prior to the construction of farm structures, the farmer must notify the Zoning Administrator in writing of the proposed construction activity.”
Zoning-permit activities involving construction or modification of a driveway intersecting a public right-of-way inside Weybridge town.
“Any activity for which a zoning permit is required and which involves the construction or modification of a driveway intersecting with a public right-of-way shall obtain an access permit from the Road Commissioner prior to the issuance of a zoning permit.”
Development in Weybridge Special Flood Hazard and Fluvial Erosion Hazard areas identified in Section 500.
DEC comment waiting period: <= 30 days (Permit may issue earlier following DEC comments.)
“A permit issued by the Zoning Administrator is required for all development in areas identified in Section 500 (SFH and FEH areas). Conditional use approval by the Zoning Board is required for all development other than for uses identified as permitted uses.”
Published municipal zoning, certificate-of-occupancy/compliance, and subdivision applications inside Weybridge town.
residential dwelling zoning fee: 150 USD · certificate of occupancy/compliance fee: 40 USD · subdivision major fee: 200 USD
“Residential Dwelling | $150.00 [...] Certificate of Occupancy/Compliance | $40.00 [...] Subdivision Major | $200.00”
Land-development zoning permits inside Weybridge town.
“For all land developments, as defined in Section 102, an approved zoning permit is required. The procedures for approval depend upon the particular use proposed. For uses listed as “conditional” in Tables 206.1 –206.6, review and approval by the Zoning Board is required.”
Town of Weybridge does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
High Density Residential District (HDR) inside Weybridge town.
front yard setback: 25 feet · side yard setback: 15 feet · rear yard setback: 30 feet
“High Density Residential District (HDR) [...] Minimum Front Yard Setback 25feet Minimum Side Yard Setback 15 feet [...] Minimum Rear Yard Setback 30 feet”
High Density Residential District (HDR) inside Weybridge town.
maximum lot coverage: <= 30 percent
“High Density Residential District (HDR) [...] Maximum Lot Coverage 30%”
High Density Residential District (HDR) inside Weybridge town.
maximum building height: <= 35 feet (Accessory structures may not exceed the primary house height or 35 feet, whichever is less.)
“Maximum Building Height 35 feet Accessory Structure Not to exceed the height of the primary house or 35 feet, whichever is less.”
On-site wastewater systems inside Weybridge town under Vermont's statewide Wastewater Systems and Potable Water Supply Rules.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system:”
Construction, operation, physical modification, or replacement of wastewater systems inside Weybridge town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system: [...] the construction of a new potable water supply or wastewater system; [...] the physical modification or replacement of an existing potable water supply or wastewater system;”
Substantially completed potable water supplies and wastewater systems inside Weybridge town when installation certification is required.
“Subsequent to the substantial completion of a potable water supply or wastewater system and prior to the use and operation of the wastewater system or potable water supply, a signed and dated installation certification from an installer, or a designer if required in Subsection (f), shall be submitted to the Secretary that states: [...] were inspected; [...] were properly tested;”
New potable water supplies, including wells used as a potable water supply, inside Weybridge town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system: [...] the construction of a new potable water supply or wastewater system;”
Subdivision of lots inside Weybridge town.
“Except as provided in this Section and in § 1-302, § 1-303, and § 1-304, no person shall take or cause to be taken any of the following actions without first obtaining a permit or permit amendment from the Secretary for the construction and operation of a potable water supply and wastewater system: (1) the subdivision of a lot or lots;”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Weybridge or Addison County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Weybridge publishes no rule on the point, not that none exists. Addison County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Weybridge means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.