Town of Farmville is a town in Prince Edward County, Virginia. Town of Farmville adopts its own zoning, so inside its limits Town of Farmville’s rules apply, not the county’s. Septic permits inside Town of Farmville come from the state health agency. 7 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Prince Edward County page.

Answers from the rulebook for Town of Farmville

Town of Farmville’s own rules

  • InspectionsRequired

    Projects for which Farmville issues a building or trade permit.

    • Required inspections are listed on the issued permit.
    • All inspections should be scheduled at least 24 hours in advance.
    • A $30 reinspection fee is assessed after a specific inspection fails twice and must be paid before the follow-up inspection is scheduled.

    inspection scheduling notice: >= 24 hours · reinspection fee: 30 USD (Assessed if a specific inspection fails twice.)

    “When a building or trade permit is issued through our online permit portal, the required inspections for your project will be listed on the permit.”
  • Local zoningPresent (with conditions)

    Land inside Farmville town limits.

    • Chapter 29 of the Town Code and the Zoning Map are the Town's zoning ordinance.
    “Chapter 29 of the Town Code has been adopted as the Zoning Ordinance of the Town, together with the Zoning Map.”
  • Permit feesPublished (with conditions)

    Building-permit administration inside Farmville town limits.

    • The Town directs users to its current Fee Schedule PDF.
    “View the current Fee Schedule (PDF). For helpful information for contractors visit our Contractor Information page.”
  • Permit processPublished (with conditions)

    Building, demolition, and trade permit applications inside Farmville town limits.

    • First-time portal users must create a free account before submitting a permit application.
    • Separate permits are issued for construction and each trade.
    • Permits take a minimum of 24 hours to process and are processed first-come, first-served.
    • Paper or PDF-email applications require data entry and may take additional time.

    minimum permit processing time: >= 24 hours (Processing times can vary because applications are processed first-come, first-served.)

    “All building, demolition, and trade permit applications can now be submitted through our online permit portal (Cloudpermit).”

Rules another office applies inside Town of Farmville

Town of Farmville does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Certificate of occupancyRequired

    Occupancy or change of occupancy of a building or structure inside Farmville town limits, subject to the stated exceptions.

    • A certificate is not required for an accessory structure as defined in the IRC.
    • A new certificate is not required for an addition to an existing Group R-5 building that already has a certificate of occupancy.
    • The building official issues the certificate after final-inspection approval and a compliance determination.

    issuance time after final-inspection approval: <= 5 working days (When the building or structure or portion is determined compliant or otherwise entitled.)

    “Prior to occupancy or change of occupancy of a building or structure, a certificate of occupancy shall be obtained in accordance with this section.”
  • Who permits septicState (with conditions)

    Onsite sewage-disposal construction serving land inside Farmville town limits.

    • Construction permits are issued by the Commissioner; requests are initially directed to the district or local health department.
    “Construction permits are issued by the commissioner but all requests for a sewage disposal construction permit shall be directed initially to the district or local health department.”
  • Well permitRequired

    Private-well construction inside Farmville town limits.

    • The permit application includes a site plan.
    • The statutory permit must be issued no later than 60 days from application in accordance with Board regulations.

    permit issuance deadline: <= 60 days (From application and in accordance with Board regulations.)

    “Any person intending to construct a private well shall apply to the Department for and receive a permit before proceeding with construction.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Town of Farmville or Prince Edward County directly.

  • Building permit — Residential construction inside Farmville town limits.
  • Owner-builder exemption — Owner-built residential work inside Farmville town limits.
  • Zoning districts — Zoning districts inside Farmville town limits.
  • Minimum dwelling size — Single-family residential districts inside Farmville town limits.
  • Minimum lot size — Single-family residential districts inside Farmville town limits.
18 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Mandatory utility hookup
  • Agricultural exemption
  • Shed and accessory-building permit exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Town of Farmville publishes no rule on the point, not that none exists. Prince Edward County’s page lists the county offices to call.

← All of Prince Edward County: county rules, score and offices