Bolthole Index

Washington County, Utah

Zoning, building permits and septic rules in Toquerville, Utah

Toquerville is a city in Washington County, Utah. Toquerville adopts its own zoning, so inside its limits Toquerville’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Washington County page.

Answers from the rulebook for Toquerville

Toquerville’s own rules

  • Building permitRequired

    Construction, alteration, repair, or removal of buildings or structures inside Toquerville City that exceed the stated threshold or involve regulated work.

    • The rule applies where floor area exceeds 200 square feet, work costs exceed $1,000, or work is regulated by Title 10 or applicable international codes.
    • Work may not commence without a valid building permit.

    floor-area threshold: > 200 square feet (Applies to construction, alteration, repair, or removal when the threshold is exceeded.) · cost threshold: > 1000 USD (Applies to construction, alteration, repair, or removal when the threshold is exceeded.)

    “Construction, alteration, repair or removal of any building or structure, or any part thereof, in excess of two hundred (200) square feet of floor area, or if the work costs exceed one thousand dollars ($1,000.00), or involves work, as provided for or restricted in this title or applicable international codes, shall not be commenced without a valid building permit.”
  • Building code adoptedAdopted (with conditions)

    Building, construction, alteration, remodeling, repair, occupancy, and use of buildings and structures within Toquerville City.

    • The listed codes are subject to limitations in the Utah State Construction and Fire Codes Act.
    • Applicable editions are the current editions adopted by Utah, with state-specific amendments.
    • State-adopted appendices are also adopted.
    “Subject to the limitations which the Utah State Construction And Fire Codes Act (Utah Code Annotated Title 15A) ("Utah Codes Act") has specified, the following construction, building and safety codes are hereby adopted and incorporated by reference, and together with the amendments as may be specified in this section or the adopted codes, are the construction standards to be applied in the regulation of building, construction, alteration, remodeling, repair, occupancy and use of buildings and structures within the City:”
  • InspectionsRequired

    Buildings, structures, ditches, signs, fences, and objects within Toquerville City.

    • The building official has authority to enter premises where construction, alteration, or repair is underway at a reasonable hour for inspection.
    • Inspection is for safety and effects on persons within the City.
    “Inspect all buildings, structures, ditches, signs, fences and objects to determine their safety and effect on the persons who are within the city.”
  • Local zoningPresent (with conditions)

    Land inside Toquerville city limits.

    • Land, buildings, and premises in zoning districts are subject to the occupancy-permit and related-ordinance requirements in City Code § 10-18A-2.
    “Land, buildings or premises in any zoning district shall be used only for the purposes permitted in such district and in accordance with an occupancy permit issued by the building department.”
  • Living in an RVTemporary only (with conditions)

    An owner-builder of a single-family residence seeking to occupy a motor home or camper trailer on the residential premises while the permanent dwelling is under construction.

    • The City must grant special accommodation.
    • The owner-builder must submit a building-permit application and pay all necessary fees, including utility connection fees.
    • Only one temporary living quarters accommodation may be requested.
    • The initial period is six months, with one six-month extension contingent on progress toward completion.
    • Temporary quarters must be vacated and disconnected from utilities before certificate of occupancy.

    initial accommodation period: 6 months (One extension may be available.) · extension period: 6 months (Contingent upon progress toward completion of the single-family dwelling.)

    “The owner-builder of a single-family residence may request special accommodation from the city to live on the residential premises during the construction of the permanent dwelling. The building permittee may only request one special accommodation/temporary living quarters.”
  • Mandatory utility hookupWater (with conditions)

    Persons inside Toquerville City who desire or are required to secure available municipal water service.

    • The condition applies when service is available from the municipal water system.
    • A written application and agreement must be filed with the water department.
    • A separate signed connection application is required for each new connection, except that subdividers or developers seeking multiple connections use a written extension agreement.
    “Any person who desires or is required to secure water service when such service is available from the municipal water system, shall file with the water department a written application and agreement for the service.”
  • Permit feesPublished (with conditions)

    Building permit and inspection fees for construction inside Toquerville City.

    • Fees are calculated from the most current International Code Council Building Valuation Data.

    building permit and inspection fee multiplier: 85 percent (Of values prescribed in the most current International Code Council BVD.)

    “Building Permit & Inspection Fees for all construction shall be eighty five percent (85%) of the values prescribed in the most current version of the International Code Council BVD.”
  • Permit processPartial

    Construction subject to Toquerville City's building-permit threshold.

    • The published provision identifies commencement prohibition and permit thresholds but does not provide a complete application-review workflow.
    “Construction, alteration, repair or removal of any building or structure, or any part thereof, in excess of two hundred (200) square feet of floor area, or if the work costs exceed one thousand dollars ($1,000.00), or involves work, as provided for or restricted in this title or applicable international codes, shall not be commenced without a valid building permit.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Toquerville or Washington County directly.

  • Owner-builder exemption — Owner-built residences inside Toquerville City.
  • Zoning districts — Zoning districts inside Toquerville City.
  • Minimum dwelling size — Residential districts inside Toquerville City.
  • Minimum lot size — Residential districts inside Toquerville City.
  • Setbacks — Residential districts inside Toquerville City.
16 more unanswered
  • Lot coverage
  • Building height
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Toquerville publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Toquerville means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Washington County: county rules, score and offices