Washington County, Utah
Town of Springdale is a town in Washington County, Utah. Town of Springdale adopts its own zoning, so inside its limits Town of Springdale’s rules apply, not the county’s. 5 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Washington County page.
Land inside Springdale town limits (Washington County, UT)
number of zones: 7 zones
“the zoning ordinance (also called the land use ordinance) establishes rules for each of the seven zones.”
Zones within Springdale town
“the town currently has seven zones: agricultural central commercial federal lands foothill residential public use valley residential village commercial”
Valley Residential (VR) zone inside Springdale town (main single-family district), by subzone
VR-S minimum lot area: >= three-fourths acre · VR-A minimum lot area: >= one-fourth acre · VR-B minimum lot area: >= 5000 sq ft
“a. lot area: 1. vr-s subzone: the minimum area of any lot in the vr-s subzone is three-fourths acre. 2. vr-a subzone: the minimum area of any lot in the vr-a subzone is one-fourth acre. 3. vr-b subzone: the minimum area of any lot in the vr-b subzone is 5,000 square feet.”
Valley Residential (VR) zone inside Springdale town, by subzone
VR-S front setback: >= 30 ft (50 ft for buildings over 18 ft on SR-9 frontage lots of 3/4 acre+) · VR-S rear setback: >= 20 ft
“a. front setback: 1. vr-s subzone: 30 feet, except for lots three-quarters of an acre and larger with frontage on sr9. on those lots the front setback is 30 feet for all buildings and structures 18 feet and less in height and 50 feet for all buildings and structures greater than 18 feet and less than 26 feet in height.”
Valley Residential (VR) zone inside Springdale town, principal structures
VR-S/VR-A normal lot max height: <= 21 ft
“a principal structure on a normal lot in the vr-s and vr-a subzones may not be more than 21 feet high. a principal structure on a high visual impact lot in the vr-s and vr-a subzones may not be more than 16 feet high. a principal structure in the vr-b subzone may not be more than 17 feet high, and any portion of a principal structure in the vr-b subzone that is within five feet of a required setback may not be more than 13 feet high.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Springdale or Washington County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Springdale publishes no rule on the point, not that none exists. Washington County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Town of Springdale means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.