Bolthole Index

San Juan County, Utah

Building permits, zoning and septic rules in Monticello, Utah

Monticello, Utah requires a city building permit for new construction, additions, remodeling, demolition, and moving a trailer or pre-built home onto a lot.1 Inside Monticello in San Juan County, the city sets zoning; San Juan Public Health permits and inspects septic systems.23 Owner-builders still need a building permit.4

At a glance

Building permits
Required before construction, including additions, remodeling, demolition and moving a trailer or pre-built home onto a lot.1
Zoning
City zoning applies; permitted uses depend on the district.2
Septic permits
San Juan Public Health permits and inspects septic systems.3
Owner-builder
Conditional for a personal, noncommercial residence; building permit still required.4
Sewer connection
Utah requires public sewer connection when available and practicable.5
Application
Scaled plans, legal description, parcel number and signed application listing contractors.6

Who to call

Building permits

Monticello Building Official

City building permit applications and owner-builder paperwork.

(435) 587-2271

17 N 100 E

Zoning

Monticello Building and Zoning

City zoning questions, zoning map and district standards.

435-587-2271

17 N 100 E

Septic permits

San Juan Public Health

Septic wastewater permits, inspections and records

435-587-3838

[email protected]

Contact details are copied from each office’s official page and were checked against it on October 14, 2026.

Off-grid gear

Going off-grid in Monticello means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

Do you need a building permit in Monticello, Utah?

Monticello requires a building permit before new construction, additions, remodeling or demolition, and before moving a trailer or pre-built home onto a lot.1 Obtain the building permit from the city Building Official before starting work.6 Starting early triggers an investigation fee equal to the building permit fee, in addition to the building permit fee itself.1

Monticello applicants must have the property deeded in their name and recorded in San Juan County, or supply a notarized statement granting permission from the legal owner.1

Does Monticello have zoning, and what about setbacks?

Monticello has city zoning, with permitted uses determined by district under the city code.2 Monticello lists residential R-1 and R-2, agricultural A-1, commercial C-1 and C-2, industrial I-1 and government G-1 districts.7 The city directs applicants to its zoning map to identify the district and to its city code for building parameters and setbacks.8

Before buying, ask Monticello Building and Zoning for the parcel’s district, permitted use, minimum lot area, dwelling size, setbacks and height limits; we could not confirm those dimensional standards here.8

How do septic permits work inside Monticello?

San Juan Public Health inspects and permits all septic wastewater systems in San Juan County, including systems inside Monticello.3 San Juan Public Health also maintains septic records and provides them to residents on request.3 Ask that office for existing system records before relying on a seller’s description of a septic installation.3

For wastewater covered by Utah’s onsite rule, connection to public sewer is required when available and practicable; otherwise an adequate onsite system or another acceptable wastewater system is required.5 Ask the city about sewer availability before planning a septic system.5

Can you live in an RV or tiny home in Monticello?

We could not confirm Monticello’s rules for living in an RV on a private lot, temporary camping while building, or tiny-home occupancy; ask Monticello Building and Zoning about the proposed use and parcel district.8 Monticello’s requirement for a building permit before moving a trailer or pre-built home onto a lot does not establish permission to occupy that structure in every zone.12

Utah’s tiny-house provisions for RV parks apply to that setting, while permission outside RV parks depends on local land-use rules and the structure’s classification.9

Building a home in Monticello: what are the steps?

Start by identifying the Monticello parcel’s zoning district on the city map and asking Building and Zoning whether the proposed home fits the district.82 Resolve public sewer availability or contact San Juan Public Health about onsite wastewater before committing to a sanitation plan.53

Submit scaled plans, the legal description, parcel number and a signed building permit application listing contractors; the Building Official may require plans stamped by a Utah architect or engineer.6 A qualifying owner-builder must submit the Owner Build Certification and Agreement before construction and still obtain the city building permit.4 Obtain the building permit before starting work.6

What should you check before buying land in Monticello?

Confirm that the parcel lies inside Monticello before using the city’s building permit and zoning answers; for land outside the city, consult the San Juan County guide for the unincorporated-area rules.110 Ask Monticello’s Building Official about current building permit fees, inspections and occupancy approval, which we could not confirm here.11

For a proposed driveway or local-street connection to a Utah state highway, a UDOT conditional access permit is required; changes in land use or access intensity can also trigger that requirement.12 Do not treat city building approval as the highway access decision.612

Watch-outs

  • Monticello’s owner-builder provision concerns acting as your own contractor for a qualifying personal residence; it does not waive the city building permit.4
  • We could not confirm Monticello’s RV living, tiny-home or temporary camping rules; ask city Building and Zoning before buying land for those uses.8
  • Starting construction in Monticello before obtaining a building permit adds an investigation fee equal to the building permit fee.1

Sources

  1. Permits & Zoning - Monticello, Utah (Monticello), quoted and re-checked
  2. Building and Zoning - Monticello, Utah (Monticello), quoted and re-checked
  3. San Juan Public Health (sanjuanpublichealth.org)
  4. Permits & Zoning - Monticello, Utah (Monticello), quoted and re-checked
  5. DAR File No. 37575, Rule R317-4, Onsite Wastewater Systems (Utah statewide rule), quoted and re-checked
  6. Permits & Zoning - Monticello, Utah (Monticello), quoted and re-checked
  7. Building and Zoning - Monticello, Utah (Monticello), quoted and re-checked
  8. Monticello Building and Zoning (monticelloutah.org)
  9. OPRO Accessory Dwellings (ADU's) and other dwelling types (Utah statewide rule), quoted and re-checked
  10. Utah Code Section 17-60-204, County safety and welfare regulations (Utah statewide rule), quoted and re-checked
  11. Monticello Building Official (monticelloutah.org)
  12. Conditional Access Permit (Utah statewide rule), quoted and re-checked

Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.

Answers from the rulebook for Monticello

Monticello’s own rules

  • Building permitRequired

    New construction, additions, remodeling, demolition and moving a trailer or pre-built home onto a lot inside Monticello city

    • Permit must be obtained from the building official before construction begins.
    • Investigation fee equal to the permit fee is charged if work starts before a permit.
    • Applicant must have the property deeded in their name and recorded in San Juan County, or provide a notarized owner permission statement.
    “building permits are required for all new construction, before moving a trailer or pre-built home onto a lot and for any addition, remodeling, or demolition.”
  • Owner-builder exemptionConditional

    Owner of a single-family residence for personal use inside Monticello city

    • Residence must be for personal, non-commercial, nonprofit use.
    • Owner-build certification and agreement must be submitted before construction.
    • Commercial projects must use licensed contractors.
    • Owner still needs a building permit; this is not a permit exemption.
    “the owner of a single family residence, intended to be used for his/her personal use and non-commercial, nonprofit use may act as the contractor and builder on his/her own residence.”
  • Local zoningPresent

    Land inside Monticello city limits

    • Permitted uses are set by zone in Title 10 of the Monticello City Code.
    “there are multiple zones in monticello: residential one (r-1), residential two (r-2), agricultural (a-1), commercial 1 (c-1), commercial 2 (c-2), industrial (i-1), and government (g-1).”
  • Zoning districtsPublished

    Zoning districts inside Monticello city

    • Zone list published on city page; a zoning map is also linked.

    districts: R-1, R-2, A-1, C-1, C-2, I-1, G-1

    “there are multiple zones in monticello: residential one (r-1), residential two (r-2), agricultural (a-1), commercial 1 (c-1), commercial 2 (c-2), industrial (i-1), and government (g-1).”
  • Permit processPublished

    Building permit applications inside Monticello city

    • Plans drawn to scale, legal description and parcel number, and signed application listing contractors are required.
    • Architect/engineer stamp may be required when the building official deems it necessary.
    “a building permit must be obtained from the building official before beginning construction.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Monticello or San Juan County directly.

  • Building code adopted — Building code adopted inside Monticello city
  • Inspections — Inspections inside Monticello city
  • Certificate of occupancy — Certificate of occupancy inside Monticello city
  • Minimum dwelling size — R-1 and A-1 districts inside Monticello city
  • Minimum lot size — R-1 and A-1 districts inside Monticello city
20 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Monticello publishes no rule on the point, not that none exists. San Juan County’s page lists the county offices to call.

← All of San Juan County: county rules, score and offices