Zoning, building permits and septic rules in Murray, Utah

Murray is a city in Salt Lake County, Utah. Murray adopts its own zoning, so inside its limits Murray’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Salt Lake County page.

Answers from the rulebook for Murray

Murray’s own rules

  • Building permitRequired

    Construction, alteration, repair, or removal of a building or structure governed by Murray City Title 17.

    • A building permit must first be issued by the Building Inspection Division.
    • The provision applies as provided or restricted in Title 17.
    “The construction, alteration, repair, or removal of any building or structure or any part thereof, as provided or as restricted in this title shall not be commenced or proceeded with, except after the issuance of a building permit for the same by the Building Inspection Division. (Ord. 07-30 § 2)”
  • Local zoningPresent (with conditions)

    Land inside Murray City limits.

    • The cited title contains regulations and restrictions enacted for inhabitants of the city.
    “This title and the regulations and restrictions contained herein are designed and enacted for the purpose of promoting the health, safety, morals, convenience, order, prosperity and general welfare of the present and future inhabitants of the city to:”
  • Zoning districtsPartial

    Land-use classification and distribution inside Murray City limits.

    • The opened provision establishes that Title 17 regulations provide classification of land uses; individual district names and tables were not retrieved.
    “Provide classification of land uses and distribution of land development and utilization;”
  • Mandatory utility hookupConditional

    Proposed development projects inside Murray City limits.

    • The City may deny or delay approval where public-utility capacity or availability is inadequate.
    “The City may deny or delay approval of a development project if there is not adequate capacity or availability of public utilities for a proposed development. (Ord. 15-24)”
  • Subdividing landRegulated (with conditions)

    Divisions of real property located within Murray City.

    • A final subdivision plat must be approved and recorded before transfer of subdivided property.
    • A parcel is subdivided when divided into two or more parts for sale or building development.
    “It is unlawful to transfer, sell, convey, give or assign any subdivided property before a final subdivision plat for the property to be transferred, sold, conveyed, gifted or assigned is approved and recorded pursuant to the requirements of this title and applicable state law.”
  • Permit feesVariable (with conditions)

    Applications for lot-split subdivisions inside Murray City limits.

    • The fee is payable when the application is submitted.
    • The Mayor establishes the written fee schedule in an amount reasonably necessary to defray processing costs.
    • The written schedule is available for public inspection in the Department.

    lot split subdivision application fee: Established by Mayor's written fee schedule (Amount reasonably necessary to defray application-processing costs.)

    “The City charges a fee for applications for lot split subdivisions, which must be paid at the time the application is submitted. The fee will be established by the Mayor in a written fee schedule in an amount reasonably necessary to defray costs of processing an application. The written fee schedule will be made available for public inspection in the Department.”
  • Permit processPartial

    Title 17 building permits inside Murray City limits.

    • A building permit must be issued by the Building Inspection Division before the specified work commences or proceeds.
    • The cited section does not provide the full application procedure.
    “The construction, alteration, repair, or removal of any building or structure or any part thereof, as provided or as restricted in this title shall not be commenced or proceeded with, except after the issuance of a building permit for the same by the Building Inspection Division. (Ord. 07-30 § 2)”

Rules another office applies inside Murray

Murray does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • Building code adoptedAdopted (with conditions)

    Statewide uniform technical construction codes, including for construction inside Murray City.

    • The codes are as amended by the State.
    • The listed codes are stated to be in force in Murray City by State law.
    “Pursuant to title 15A of Utah Code Annotated, and administrative rulemaking authority, the State of Utah has adopted Statewide uniform technical construction codes which include, as amended by the State, without limitation, the International Building Code, International Residential Code, International Mechanical Code, International Plumbing Code, International Fuel Gas Code and the National Electrical Code, which are, by State law, in force in Murray City. (Ord. 17-31)”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Murray or Salt Lake County directly.

  • Owner-builder exemption — Owner-built residential construction inside Murray City limits.
  • Inspections — Building work inside Murray City limits.
  • Certificate of occupancy — Buildings inside Murray City limits.
  • Minimum dwelling size — Residential zoning districts inside Murray City limits.
  • Minimum lot size — Residential zoning districts inside Murray City limits.
17 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Murray publishes no rule on the point, not that none exists. Salt Lake County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Murray means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Salt Lake County: county rules, score and offices