Bolthole Index

Cache County, Utah

Zoning, building permits and septic rules in Richmond, Utah

Richmond is a city in Cache County, Utah. Richmond adopts its own zoning, so inside its limits Richmond’s rules apply, not the county’s. 6 rules below are quoted from official sources and independently re-checked, most recently on October 22, 2026. Rules for unincorporated land are on the Cache County page.

Answers from the rulebook for Richmond

Richmond’s own rules

  • Building permitLimited

    Storage sheds under 200 square feet on lots inside Richmond city

    • No building permit is needed for a shed under 200 square feet.
    • A permit is still required if any utilities are run to the shed, regardless of size.

    shed floor area for no building permit: < 200 square feet (utilities to the shed still require a permit)

    “as long as the square footage of the shed is under 200 square feet. you won't need a building permit.”
  • Local zoningPresent (with conditions)

    Land inside Richmond city limits; zoning administered by Richmond city under Title 12-000 (LUDMO)

    • The city's zoning clearance process asks for how the parcel is zoned, so zone-specific standards apply by district.
    • Chapter 12-900 'Zones' and the Permitted Use Matrix (Chapter 12-3000) were identified only through search snippets and agendas; their text was not opened and is not cited here.
    “title 12-000 of the richmond municipal code contains our ordinances on land use, development, and management (ludmo).”
  • Driveway accessLimited

    Driveways on residential lots inside Richmond city limits

    • Driveways must drain so water does not run onto the street; a driveway access permit is not described on the page reviewed.
    • City design and construction standards are linked from the zoning clearance page and not opened.
    “driveways must be established in such a manner to allow a "swale" to prevent water from running down the driveway and directly onto the street.”
  • Permit processPartial

    New house construction inside Richmond city limits

    • Richmond city's first step is the city office for the building checklist and zoning clearance packet and application.
    • Plans for all new single-family dwellings must be engineered.
    • A full plot plan with setbacks and a current survey are required when the lot is not in a subdivision.
    • New residences and businesses must install a sidewalk to city standards.
    • Building permit issuance is by Cache County (see richmond-building-permit-county); the full process and fee schedule are not published on the pages reviewed.
    “your first step should be the city office. pick up the building checklist and zoning clearance packet & application.”

Rules another office applies inside Richmond

Richmond does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.

  • InspectionsRequired

    Permitted construction inside Richmond city limits, inspected by Cache County Building Division

    • Inspections apply to permitted work; the page does not list inspection stages.
    • Scope recorded as district-specific (county scope enum) with Richmond city as the district.
    “the building division reviews plans, issues permits, and performs building inspections.”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Richmond or Cache County directly.

  • Owner-builder exemption — Owner-builder permit exemption inside Richmond city limits
  • Building code adopted — Building code adopted for Richmond city construction
  • Certificate of occupancy — Occupancy approval for new homes inside Richmond city limits
  • Zoning districts — Zone districts inside Richmond city limits
  • Minimum dwelling size — Minimum dwelling size in Richmond city main residential district
19 more unanswered
  • Minimum lot size
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Mandatory utility hookup
  • Agricultural exemption
  • Subdividing land
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Richmond publishes no rule on the point, not that none exists. Cache County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Richmond means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Cache County: county rules, score and offices