Waller County, Texas
Town of Pine Island is a town in Waller County, Texas. 7 rules below are quoted from official sources and independently re-checked, most recently on November 12, 2026. Rules for unincorporated land are on the Waller County page.
Erecting a dwelling or other structure inside Pine Island town limits
permit fee: 100 USD
“it shail be unlawful for any person to erect/install a dwelling, other structure, driveway/casement, water well, or septic system within the limits of the town without a valid permit for such issued by the town council in the name of the owner.”
Dwellings and other structures inside Pine Island town limits (town-wide set-back ordinance, not a zoning district rule)
front setback: >= 100 feet · side setback: >= 30 feet · rear setback: >= 100 feet
“100 feet from the front property line; and 30 fect from either side property line; and 100 feet from the rear property line.”
Installing a septic system inside Pine Island town limits (town set-back permit; state/county OSSF licensing not researched)
conventional septic setback: >= 20 feet (aerobic systems 30 feet) · septic to water well: >= 150 feet
“it shail be unlawful for any person to erect/install a dwelling, other structure, driveway/casement, water well, or septic system within the limits of the town without a valid permit for such issued by the town council in the name of the owner.”
Installing a water well inside Pine Island town limits
well to septic: >= 150 feet
“a water well may only be installed in compliance with the following minimum restrictions: 100 feet from the front property line; and 30 feet from either side property line; and 150 feet from any septic system.”
Driveways and access easements inside Pine Island town limits
driveway side setback: >= 10 feet
“a driveway or access easement may only be installed in compliance with the following minimum set-back restriction: 10 feet from either side property line.”
Set-back permit applications (dwelling, structure, driveway, well, septic) inside Pine Island town
application fee: 100 USD
“all applications to the town council shall be accompanied by a fee of one hundred dollars ($100.00).”
Set-back permit process inside Pine Island town
“the designated official shall inspect the application and any attachments.”
We looked and could not find an official answer yet. Silence is not permission; ask Town of Pine Island or Waller County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Town of Pine Island publishes no rule on the point, not that none exists. Waller County’s page lists the county offices to call.