Titus County, Texas
Mount Pleasant is a city in Titus County, Texas. Mount Pleasant adopts its own zoning, so inside its limits Mount Pleasant’s rules apply, not the county’s. Septic permits inside Mount Pleasant come from Mount Pleasant. 17 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Titus County page.
Site construction inside Mount Pleasant city limits.
“Building permits are required before commencing site construction.”
Structures within Mount Pleasant city limits.
building and residential code edition: 2024 · electrical code edition: 2023
“CURRENT CODES: Building Codes Title: International Building and International Residential Code Edition: 2024 Edition”
Residential and commercial projects within Mount Pleasant city limits.
“Through the issuance of building permits and certificates of occupancy, the Building and Development Department ensures that all structures within the City of Mount Pleasant conform to adopted and accepted building codes and standards, ensuring the health, safety and welfare of the public through comprehensive reviews and inspections of all residential and commercial projects.”
Facilities following construction activities inside Mount Pleasant city limits.
“A Certificate of Occupancy (CO) is issued upon application and inspection to the business following the conclusion of your construction activities, and must be issued before the facility can be occupied.”
Land inside Mount Pleasant city limits.
“CHAPTER 155: ZONING CODE CHAPTER 155: ZONING CODE”
Zoning districts inside Mount Pleasant city limits.
“155.20 FD - Future Development District 155.21 SF-1 - Single-Family Residential District 155.22 SF-2 - Single-Family Residential District 155.23 TF - Two-Family Residential District 155.24 MF - Multi-Family Residential District 155.25 MH - Mobile Home District 155.26 NS - Neighborhood Service District 155.27 GR - General Retail District 155.28 CB - Central Business District 155.29 C - Commercial District 155.30 LI - Light Industrial District 155.31 HI - Heavy Industrial District 155.32 PD - Planned Development District 155.33 FP - Flood Plain District”
Septic systems inside incorporated Mount Pleasant city limits.
“when connection to the city’s sewer system is impossible or impractical at any time, the construction, maintenance and use of a dry or chemical toilet or septic tank constructed in conformity to state law and approved by the Plumbing Inspector may be permitted until such time as connection to the city’s sewer system may be made.”
Dry toilets, chemical toilets, and septic tanks inside Mount Pleasant city limits.
“It shall be unlawful for any person to build, construct, dig, maintain or use any dry toilet, surface privy, cesspool or septic tank within the city; provided, however, when connection to the city’s sewer system is impossible or impractical at any time, the construction, maintenance and use of a dry or chemical toilet or septic tank constructed in conformity to state law and approved by the Plumbing Inspector may be permitted until such time as connection to the city’s sewer system may be made.”
Buildings or structures used or occupied by any person within incorporated Mount Pleasant city limits.
“All owners or occupants of any building(s) or structure(s) used or occupied by any person situated within the incorporated city limits of Mount Pleasant, are required to connect to the sanitary sewer system in the manner provided in the code. Where connection to the sanitary sewer system is not feasible or cost prohibitive, the owner or occupant of such building(s) or structure(s) shall be permitted to construct a septic system in conformity with § 51.02.”
Proposed subdivisions in Mount Pleasant city limits.
“No owner, or agent of the owner, of any parcel of the land located in a proposed subdivision shall transfer or sell any part of the parcel before a final plat of the subdivision has been approved by the City Council in accordance with the provisions of the regulations and filed with the Clerk and Recorder of Titus County. (3) The subdivision of any lot or any parcel of land by the use of metes and bounds description for the purpose of development is prohibited except as provided by state law.”
Floodplain development governed by Chapter 152 inside Mount Pleasant city limits.
“A Floodplain Development Permit shall be required to ensure conformance with the provisions of this chapter.”
Permit and zoning applications administered by Mount Pleasant.
new single-family building permit: per 0.5 USD per square foot · single-family alteration/addition permit: per 0.3 USD per square foot (Minimum $75) · accessory building permit: 50 USD
“1. Residential a. Accessory Buildings $50.00 b. Single Family – New .50 per sq. ft. c. Single Family – Alteration / Addition .30 per sq. ft.- Minimum $75”
Development and building-permit process inside Mount Pleasant city limits.
building permit process time: 30 days
“PRECONSTRUCTION CONFERENCE TIME: As Scheduled Prior to commencing construction, a preconstruction conference with staff and the general contractor is required before building permits are issued. [...] BUILDING PERMIT PROCESS TIME: 30 Days Building permits are required before commencing site construction. A building permit may be submitted simultaneously with a final plat for review; however, the building permit will not be released until the plat is approved and filed with the County.”
Mount Pleasant does not set these itself; the county, a health district or the state does, and they apply to every address inside its limits.
Dwelling units in the SF-1 Single-Family Residential District inside Mount Pleasant city limits.
minimum floor space per dwelling unit: >= 1200 square feet
“Minimum floor space per dwelling unit: 1,200 square feet.”
Lots in the SF-1 Single-Family Residential District inside Mount Pleasant city limits.
minimum lot area: >= 10000 square feet · minimum lot width: >= 70 feet · minimum lot depth: >= 100 feet
“Lot requirements. (Minimum figures) (a) Lot area: At least 10,000 square feet; (b) Lot width: 70 feet; (c) Lot depth: 100 feet.”
Yards in the SF-1 Single-Family Residential District inside Mount Pleasant city limits.
front yard: >= 25 feet · interior side yard: >= 7 feet (Interior lot) · exterior side yard: >= 10 feet (Exterior lot) · rear yard: >= 25 feet
“Yard requirements. (Minimum figures) (a) Front yard: 25 feet; (b) Side yard: 1. Interior lot: 7 feet; 2. Exterior lot: 10 feet; (c) Rear yard: 25 feet.”
Buildings in the SF-1 Single-Family Residential District inside Mount Pleasant city limits.
maximum building height: <= 35 feet
“Height requirements. Maximum building height: 35 feet.”
We looked and could not find an official answer yet. Silence is not permission; ask Mount Pleasant or Titus County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Mount Pleasant publishes no rule on the point, not that none exists. Titus County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Mount Pleasant means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.