Bolthole Index

Tarrant County, Texas

Zoning, building permits and septic rules in Hurst, Texas

Hurst is a city in Tarrant County, Texas. Hurst adopts its own zoning, so inside its limits Hurst’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Tarrant County page.

Answers from the rulebook for Hurst

Hurst’s own rules

  • Building permitRequired

    New structures and remodeling or additions to existing structures inside Hurst city limits.

    • The City FAQ states that this includes fences, swimming pools, signs, and similar work.
    “Building permits are available from the Community Development and Planning - Building Inspection Division located at 1505 Precinct Line Road. A building permit is required to construct a new structure or to remodel or add to an existing structure.”
  • Certificate of occupancyRequired

    Vacant land, newly erected or structurally altered buildings, and changes in occupancy inside Hurst city limits.

    • A temporary certificate may be issued for temporary use of part of a building before the entire building is completed if the use will not jeopardize life or property; it may not exceed six months.

    temporary certificate maximum period: <= 6 months (Only for temporary use and occupancy of a portion of a building before completion of the entire building.)

    “No vacant land shall be occupied and no building or structure hereafter erected or structurally altered, and no change in occupancy of a building, part of a building or land shall be made until after the enforcing officer shall have issued a certificate of occupancy therefor.”
  • Local zoningPresent (with conditions)

    Land inside the corporate limits of Hurst city, Texas.

    • Development and land use must conform to the regulations for the district in which the property is located.
    “The purpose of this chapter is to zone the entire area of the city and the districts in accordance with a comprehensive plan for the purpose of promoting health, safety, morals and the general welfare of the general public.”
  • Zoning districtsPublished (with conditions)

    Zoning districts inside Hurst city limits.

    • The city groups its 20 districts broadly as residential, commercial, industrial, and special districts.

    zoning districts: 20

    “The City of Hurst has 20 zoning districts, which are broadly grouped into residential, commercial, industrial, and special districts.”
  • Mandatory utility hookupConditional

    Permanent public-utility connections to land, buildings, structures, or portions of structures inside Hurst city limits.

    • The cited provision conditions permanent water, sewer, electrical, gas, telephone, and other public-utility connections on issuance of a certificate of occupancy; it does not establish that a new home must connect when water or sewer is available.
    “No permanent water, sewer, electrical, gas, telephone or other public utility connection shall be made to any land, building, structure or portion thereof until and after a certificate of occupancy has been issued by the enforcing officer.”
  • Subdividing landRegulated (with conditions)

    Subdivision of land inside Hurst city limits.

    • Specific platting and improvement requirements were not extracted from the accessible official chapter text.
    “This chapter shall be known and may be cited as "City of Hurst Subdivision Regulations."”
  • Permit processPublished (with conditions)

    Permitting, inspection, and transaction processing for work inside Hurst city limits.

    • The page identifies the Citizen Self-Service Portal as the online process but does not, in the accessible excerpt, state every submittal requirement.
    “The permitting, inspection, and transaction processes are online via the Citizen Self-Service Portal (CSS).”

Still unanswered

We looked and could not find an official answer yet. Silence is not permission; ask Hurst or Tarrant County directly.

  • Owner-builder exemption — Owner-built residential construction inside Hurst city limits.
  • Building code adopted — Construction inside Hurst city limits.
  • Inspections — Building work inside Hurst city limits.
  • Minimum dwelling size — Single-family residential districts inside Hurst city limits.
  • Minimum lot size — Single-family residential districts inside Hurst city limits.
18 more unanswered
  • Setbacks
  • Lot coverage
  • Building height
  • Living in an RV
  • Camping on your land
  • Tiny homes
  • Manufactured homes
  • Accessory dwellings
  • Who permits septic
  • Septic permit
  • Septic inspection
  • Off-grid sanitation
  • Well permit
  • Agricultural exemption
  • Driveway access
  • Building in a floodplain
  • Short-term rentals
  • Permit fees

Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.

Unanswered questions are usually a sign that Hurst publishes no rule on the point, not that none exists. Tarrant County’s page lists the county offices to call.

Off-grid gear

Going off-grid in Hurst means bringing your own water and power. The kit we’d start with:

These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.

← All of Tarrant County: county rules, score and offices