Castroville, Texas, in Medina County, handles residential building permits through city Community Development, with limited exceptions for smaller projects.1 Castroville also sets zoning by district and requires sewer connections where sanitary sewers are available, following city notice.23 For a parcel needing private septic, Medina County publishes a countywide septic permit requirement; ask Environmental Health to confirm the approval route for the city address.4
At a glance
- Building permits
- City building permits; limited residential exceptions, including accessory structures under 200 square feet without trade work.1
- Zoning
- City zoning applies; requirements depend on the parcel’s district.2
- R-A lot size
- One-family residential R-A: minimum lot area 12,000 square feet.5
- R-A setbacks
- Front 20 feet, side 10 feet, rear 25 feet; street-side yard minimum 15 feet, with additional restrictions possible.6
- Sewer and septic
- City sewer connection required where available after notice; Medina County states all septic systems require a permit.34
- Manufactured homes
- Mobile-home placement limited to land zoned to allow a mobile home park.7
Who to call
Building permits
Castroville Community Development Department
City building permit questions and applications; ask about historic-property review and the correct project approvals.
703 Paris St. Castroville , TX 78009
Zoning
Castroville Community Development — Zoning
City zoning information, district map and zoning verification request.
Building permits
Castroville Community Development — Residential Permit Process
Residential plan submission, building inspections and certificate of occupancy requirements.
703 Paris Street Castroville, Texas 78009
Septic permits
Medina County Environmental Health Department
County septic applications and inspections; confirm the permitting route for an address inside Castroville.
1502 Avenue K 2nd Floor Hondo, Texas 78861
Contact details are copied from each office’s official page and were checked against it on October 11, 2026.
Off-grid gear
Going off-grid in Castroville means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Castroville, TX?
Castroville requires building permits for residential remodeling involving roofs, siding, fixtures, doors or windows, and for accessory structures over 200 square feet.1 Accessory structures under 200 square feet are listed as exempt unless electrical, plumbing or mechanical work is involved; residential exceptions still must meet city zoning and building-code requirements.1 Ask Community Development to classify the specific work before ordering materials, especially when a small shed will have utilities.1 Castroville’s adopted codes include the 2012 International Residential Code and 2014 National Electric Code, with city ordinances controlling conflicts.8
Who handles building permits and zoning in Castroville?
Castroville Community Development coordinates city land and building development and accepts building permit applications at [email protected]; the office phone is 830-931-4090.9 For a new home, the city’s residential package calls for electronic building plans and a permit application, with fees paid before plan review.10 Castroville’s zoning page provides a zoning verification request, useful for resolving the district before designing a house.11 Historic properties may also need Historic Landmark Commission review, so ask Community Development about that review before altering an existing building.9
Does Castroville have zoning, lot-size rules and setbacks?
Castroville has city zoning regulating uses, building size and scale, parking and development; a parcel’s district determines the requirements.2 In Castroville’s one-family residential R-A district, the minimum lot area is 12,000 square feet, with minimum width of 80 feet and depth of 115 feet.5 R-A yards must be at least 20 feet in front, 10 feet at the side and 25 feet at the rear; the minimum side yard next to a public street right-of-way is 15 feet.6 Plat building lines and supplementary yard rules can require greater setbacks.6 R-A height is limited to 30 feet and 2.5 stories; these figures are district-specific, so do not apply them to every Castroville lot.12
How do sewer connections and septic permits work in Castroville?
Castroville requires a building’s owner or occupant to connect to city sewer where sanitary sewer exists or becomes available, within 30 days after notice from the building inspector or city health officer.3 Public-sewer connections require a written city permit and inspection before backfill.3 Medina County’s septic instructions state that all septic systems installed in the county require permits, licensed design and licensed installation; homeowners cannot install a system unless licensed as an OSSF installer.4 Before buying a Castroville lot without sewer, ask city Community Development about sewer availability and Medina County Environmental Health to confirm the city-address septic approval route.34 Do not assume a large tract removes the county’s stated septic permit requirement.4
Can you live in an RV or tiny home in Castroville?
We could not confirm Castroville’s general rule for residential RV occupancy, tiny-home occupancy or accessory dwellings; ask Community Development for the allowed use in the parcel’s zoning district before buying for that purpose.2 Castroville’s mobile-home rule allows placement only on land zoned for a mobile home park, so a vacant residential lot should not be treated as automatic permission for a mobile home.7 Castroville also has separate RV conditions in specified flood-hazard zones: an RV must satisfy the temporary-stay, highway-ready or permit/elevation/anchoring alternative.13 Those floodplain alternatives do not establish general permission to live in an RV on private land.13
Building a home in Castroville: what are the steps?
- Ask Castroville Community Development to verify the zoning district and the proposed residential use before preparing final plans.211
- Resolve city sewer availability and utility questions with Public Works, and confirm any private septic application with Medina County Environmental Health.3104
- Submit electronic plans and a building permit application to Community Development; pay the fees before plan review and provide an engineered foundation design or approval letter.10
- Arrange the required construction inspections and obtain a passing inspection before the next stage.10
- Obtain the city’s certificate of occupancy before moving into the building.10
What should you check before buying land in Castroville?
In Castroville special flood-hazard areas, new residential construction and substantial improvements must meet the city’s applicable elevation standards, including elevating the lowest floor to or above base flood elevation where required.13 Ask Community Development about floodplain requirements alongside the zoning review before fixing the house location.139 We could not confirm Castroville’s private-well rule or homeowner-as-contractor eligibility; resolve both with Community Development before relying on either option.9 For land outside Castroville city limits, use the Medina County guide: Medina County has no county zoning ordinance in unincorporated areas, while county septic and floodplain requirements remain separate.14415
Watch-outs
- Castroville residential building permit exceptions do not waive zoning or building-code compliance.1
- We could not confirm Castroville’s general RV or tiny-home occupancy rules; ask Community Development for a district-specific answer.2
- Castroville’s R-A setbacks can be increased by plat building lines or supplementary yard regulations.6
- City sewer availability can require connection after notice; do not budget for septic as an assured alternative.3
Sources
- Permitting (Castroville), quoted and re-checked
- Zoning (Castroville), quoted and re-checked
- Chapter 110, Section 110-83, Owner required to connect to sanitary sewer system (Castroville), quoted and re-checked
- Septic Tank Applications Permit, quoted and re-checked
- Comprehensive Zoning Ordinance (Castroville), quoted and re-checked
- castrovilletx.gov (Castroville), quoted and re-checked
- Chapter 22, Section 22-27, Buildings constructed elsewhere prohibited in the city; exceptions (Castroville), quoted and re-checked
- Chapter 22, Section 22-1, Technical codes (Castroville), quoted and re-checked
- Castroville Community Development Department (castrovilletx.gov)
- Castroville Community Development — Residential Permit Process (castrovilletx.gov)
- Castroville Community Development — Zoning (castrovilletx.gov)
- castrovilletx.gov (Castroville), quoted and re-checked
- Chapter 54, Section 54-77, Specific standards (Castroville), quoted and re-checked
- Texas law on county zoning and building authority
- What Type of Permits Are Required In Medina County?, quoted and re-checked
Written October 11, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.