Lampasas County, Texas
Lometa is a city in Lampasas County, Texas. Lometa adopts its own zoning, so inside its limits Lometa’s rules apply, not the county’s. 9 rules below are quoted from official sources and independently re-checked, most recently on November 10, 2026. Rules for unincorporated land are on the Lampasas County page.
Construction, remodeling, fences, carports, storage sheds, driveways, and other work inside Lometa city limits.
base permit fee: 30 USD (Listed for fence, carport, storage shed, remodel, new construction, driveway, and similar work.)
“The City of Lometa, as of May 2021, established a fee schedule for zoning requests and permits, with both being required since 2019. See below for the costs associated with”
Owners performing work on their own property inside Lometa city limits.
“not using any sub-contractors [...] only require a basic permit and fee.”
Commercial building projects inside Lometa city limits.
“Construction plans must be designed in accordance with the City of Lometa adopted codes.”
Driveway construction inside Lometa city limits.
open-ditch driveway inspections: 2 inspections · curb-and-gutter driveway inspections: 1 inspection
“will require 2 separate inspections. [...] will only require one inspection. [...] 24 hours in advance”
Land inside Lometa city limits.
“Zoning Change reviews/requests [...] requires posting notification in newspaper and public hearing(s)”
New, replacement, or expanded driveways inside Lometa city limits.
residential driveway width: 12–30 feet · commercial driveway width: 20–45 feet
“(Residential:12’ min, 30’ max) (Commercial: 20’ min, 45’ max)”
Commercial projects inside Lometa city limits that are in a floodplain.
“If yes, elevation certificates will be required.”
City zoning and building permits inside Lometa city limits.
base permit fee: 30 USD (Fence, carport, storage shed, remodel, new construction, driveway, etc.) · additional review and inspection charge: 20 USD (Plan review, general contractors, other trade contractors, demolition, concrete slabs, and similar listed work.)
“Base Permit [...] $30.00 [...] Additional Charges [...] $20.00”
Permit applicants for work inside Lometa city limits.
commercial written comments deadline: <= 10 business days (After submission of a complete application and necessary forms.)
“You can print the permit, fill it out to the best of your ability, as we know some of the information asked for will not be applicable, and then you can bring it to City Hall or email it to cityoflometa@yahoo.com at your convenience.”
We looked and could not find an official answer yet. Silence is not permission; ask Lometa or Lampasas County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Lometa publishes no rule on the point, not that none exists. Lampasas County’s page lists the county offices to call.