Cumby is a city in Hopkins County, Texas. Cumby adopts its own zoning, so inside its limits Cumby’s rules apply, not the county’s. 8 rules below are quoted from official sources and independently re-checked, most recently on November 9, 2026. Rules for unincorporated land are on the Hopkins County page.
Construction activities within Cumby city limits.
“The City of Cumby has adopted these codes and our Building Inspector and Plan Review are charged with reviewing and inspecting all construction activities within the city, in conformance to these standards.”
Buildings inside Cumby city limits before occupancy.
“A certificate of occupancy must be issued before any building is occupied.”
Land inside Cumby city limits.
“The city is hereby divided into zoning districts, as shown on the official zoning map, which together with all explanatory matter thereon, is hereby adopted and declared to be a part of this zoning ordinance.”
Zoning districts inside Cumby city limits.
“Sec. 9-4-06. "R-1" Single Family Residential District [...] Sec. 9-4-13. "I" Industrial District”
Manufactured homes inside Cumby city limits.
“For manufactured home lots which are individually owned, the minimum lot area shall be five thousand (5,000) square feet when a public sewer system is available.”
Commercial permit applications for property identified as being in a floodplain inside Cumby city limits.
“THIS PROPERTY IS IN A FLOODPLAIN: Yes □ No □ If yes, provide Flood Plain Certificate to the City”
Building permits inside Cumby city limits.
annual contractor permit fee: 50 USD · plan review cost: Cost of Service incurred by the City of Cumby plus 15%
“Residential House Plan Review and Commercial Plan Review Cost of Service incurred by the City of Cumby plus 15%”
Permits governed by Ordinance No. 2022-04-006 inside Cumby city limits.
minimum plan-submittal lead time: >= 10 business days (Before the applicant intends to begin utilizing the permit)
“Plans must be submitted prior to receiving a permit. The plan must be submitted at least ten business (10) days prior to the date the applicant intends to begin utilizing the permit, and the plan must be approved by the building inspector prior to issuance of the requested permit(s).”
We looked and could not find an official answer yet. Silence is not permission; ask Cumby or Hopkins County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Cumby publishes no rule on the point, not that none exists. Hopkins County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Cumby means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.