Hockley County, Texas
Levelland is a city in Hockley County, Texas. Levelland adopts its own zoning, so inside its limits Levelland’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 24, 2026. Rules for unincorporated land are on the Hockley County page.
Buildings or structures for which a certificate of occupancy is sought within Levelland city limits.
inspection timing after completion notice: <= 10 days
“Such inspection shall occur within ten (10) days of the applicant notifying the office of the building inspector that the building or structure has been completed.”
Use, occupancy, conversion, structural alteration, or change of existing use of a building or structure within Levelland city limits.
“No building or structure shall be used, occupied, converted or structurally altered and no change in the existing use of a building or structure or portion thereof shall be made until the building inspector or the city official charged with enforcing this article has issued a certificate of occupancy as outlined herein.”
Land within Levelland city limits.
“The City of Levelland is hereby divided into classes of use districts termed respectively:”
Zoning districts within Levelland city limits.
“Boundaries of the districts as enumerated in Section 9.503 of this article are hereby established and adopted on the Zoning Map of the City of Levelland, which are made a part of this article as fully as if the same were set forth herein in detail.”
Mobile homes used as dwelling units on a single lot in the Multi-2 Two-Family District within Levelland city limits.
mobile homes per lot: <= 2 mobile homes (Multi-2 Two-Family District)
“No more than two mobile homes shall be permitted per lot.”
Building and construction permits within Levelland city limits.
residential new-construction plan-review fee: 25 percent of general permit fee ($50.00 minimum) · new residential certificate-of-occupancy fee: 0 USD additional fee (included in building permit)
“New residential (1- and 2-family) dwellings construction: Included in building permit.”
Certificate-of-occupancy process for buildings or structures within Levelland city limits.
“A person shall apply for a certificate of occupancy coincident with the application for a building permit. The application shall contain, at a minimum, the following:”
We looked and could not find an official answer yet. Silence is not permission; ask Levelland or Hockley County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Levelland publishes no rule on the point, not that none exists. Hockley County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Levelland means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.