Gregg County, Texas
Gladewater is a city in Gregg County, Texas. Gladewater adopts its own zoning, so inside its limits Gladewater’s rules apply, not the county’s. 7 rules below are quoted from official sources and independently re-checked, most recently on October 18, 2026. Rules for unincorporated land are on the Gregg County page.
Construction inside Gladewater city limits.
building code edition: 2012 International Building Code
“The Building Inspector is concerned with ensuring that all construction is met under the 2012 International Building Code as adopted by the City of Gladewater. In addition, construction and permitting must comply with local requirements as described by the Gladewater Code of Ordinance.”
Land inside Gladewater city limits.
“The Commission also makes recommendations to the City Council for zoning changes and routes of streets, avenues and boulevards, including the opening, widening and abandonment of the same, or of any alley or the changing thereof.”
Zoning districts inside Gladewater city limits.
“In the Single-Family Districts (SF-1 through SF-7), no land shall be used and no building shall be erected for or converted to any use other than:”
Manufactured housing in Gladewater's Mobile/Manufactured Housing (MH) district.
“Exception, mobile/manufactured Homes shall be allowed only in Mobile/Manufactured Housing Districts”
Subdivisions or additions situated within Gladewater's corporate limits.
“The purpose of the Planning & Zoning Commission is to regulate the platting and recording of subdivisions or additions situated within the corporate limits, or within one mile of such city.”
City building, inspection, certificate, and driveway permits inside Gladewater city limits.
building permit fee: 0.25 USD per square foot (minimum fee $50 per permit) · residential certificate of occupancy: 25 USD (per permit) · driveway approach: 35 USD (per permit) · residential plan review: 0.27 USD per square foot (select this fee with building fee)
“Building permit | $ 0.25 | per sq. ft. Building permit – minimum fee | $ 50.00 | per permit Certificate of occupancy – commercial | $ 75.00 | per permit Certificate of occupancy – residential | $ 25.00 | per permit Demolition | $ 50.00 | per permit Driveway approach | $ 35.00 | per permit”
Construction and permitting inside Gladewater city limits.
“In addition, construction and permitting must comply with local requirements as described by the Gladewater Code of Ordinance.”
We looked and could not find an official answer yet. Silence is not permission; ask Gladewater or Gregg County directly.
Each answer was extracted from an official source and independently re-checked against that source by a second reviewer. That is an evidence check, not legal advice. Rules change; confirm with the authority before you buy or build.
Unanswered questions are usually a sign that Gladewater publishes no rule on the point, not that none exists. Gregg County’s page lists the county offices to call.
Off-grid gear
Going off-grid in Gladewater means bringing your own water and power. The kit we’d start with:
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.