Alamo Heights, Texas requires building permits for new construction and alterations or additions to existing buildings.1 Alamo Heights has city zoning; Bexar County’s no-zoning rule applies outside municipal limits.23 Septic systems inside Alamo Heights remain subject to Bexar County permitting.4
At a glance
- Building permits
- Required for new construction, alterations and additions1
- Zoning
- City zoning applies inside Alamo Heights2
- Applications
- My Government Online1
- Septic permits
- Bexar County Environmental Services4
- Lot coverage
- SF-A and SF-B: maximum 40%, subject to exclusions5
- Inspections
- City Community Development Services manages building inspections6
Who to call
Building permits
Alamo Heights Community Development Services — Building Permits
Building-permit applications, plan review, fees and inspection questions
6116 Broadway San Antonio, TX 78209
Planning & zoning
Alamo Heights Community Development Services — Planning
Zoning, preliminary plan review, plats, variances, building inspections and certificates of occupancy
6116 Broadway San Antonio, TX 78209
Septic permits
Bexar County Environmental Services
Septic permits, renewals, installation inspections and existing-system records
612 Nogalitos San Antonio, TX 78204
Contact details are copied from each office’s official page and were checked against it on October 14, 2026.
Off-grid gear
Going off-grid in Alamo Heights means bringing your own water and power. The kit we’d start with:
- Water Crystal Quest Filter any source — well, rain, or creek — to drinking-clean.
- Power Bluetti Solar generators and home battery backup for living off the grid.
- Septic Soil percolation test kit Run your own perc test before paying an engineer — the first thing a septic office asks about.
- Water Well water test kit Bacteria, nitrates, hardness — know what the well on a parcel is really pumping.
These are affiliate links — we may earn a commission, at no cost to you. As an Amazon Associate, Bolthole Index earns from qualifying purchases.
Do you need a building permit in Alamo Heights, Texas?
Alamo Heights requires building permits for new construction and alterations or additions, including structural, plumbing, mechanical, electrical and some finishing work.1 The city directs applicants to the specific building-permit application for submittal requirements and to its adopted Schedule of Development Fees for costs.1 Start with Alamo Heights Community Development Services for a project inside city limits; the department manages plan review, building permitting and inspections through completion.6
Who handles building permits and zoning in Alamo Heights?
Alamo Heights Community Development Services manages preliminary plan review, plats, rezoning, variances, building-permit review, inspections and certificates of occupancy.6 Building-related applications and inspection requests go through My Government Online.1 Contact the department at 210-826-0516 or [email protected] with building-permit questions.1 For land outside Alamo Heights, consult the Bexar County guide: the county’s no-zoning statement specifically concerns land outside municipal limits.3 Septic permitting remains with Bexar County Environmental Services.4
Does Alamo Heights have zoning, lot coverage and height limits?
Alamo Heights has municipal zoning, so a lot inside city limits must be evaluated under the city’s rules.2 In the SF-A and SF-B residential districts, maximum lot coverage is 40%, with exclusions identified in the residential design standards.5 Main-structure height limits depend on lot width and roof type; ask Community Development Services to confirm the applicable height before designing a home or addition.76 We could not confirm the city’s RV occupancy, tiny-home occupancy, accessory-dwelling or minimum dwelling-size rules; ask the city planning office about the intended use of the specific lot.6
How do septic permits work inside Alamo Heights?
Bexar County requires permits for all on-site sewage facilities within the county, including systems inside Alamo Heights.4 New systems, repairs or changes, renewals and existing systems without permits have distinct application requirements.8 Standard systems require renewal every 5 years, with pumping, a pump receipt and a $30 renewal fee.8 Septic tank installations receive inspections at various stages of installation.9 Before buying a property served by septic, ask Bexar County Environmental Services for permit records and the applicable renewal or repair requirements.108
Building a home in Alamo Heights: what are the steps?
First, ask Alamo Heights Community Development Services for preliminary plan review and confirmation of the lot’s zoning and any needed plat, variance or architectural review.6 Next, use the specific building-permit application to establish the required submittals, and consult the adopted development fee schedule.1 Submit building-related applications through My Government Online; plans must be reviewed and approved before building permits are issued.1 Begin work after the building permit is issued, then coordinate building inspections and completion requirements with Community Development Services.16 If the property uses septic, arrange the separate county septic approvals and installation inspections.89
Watch-outs
- Bexar County’s no-zoning rule is for unincorporated land; Alamo Heights has city zoning.32
- We could not confirm permission to live in an RV or tiny home in Alamo Heights; ask Community Development Services before committing to that use.6
- The city says applicants for mechanical, electrical and plumbing permits must be state-licensed contractors for the specific trade; ask Community Development Services how that applies to an owner-builder project.1
Sources
- Alamo Heights Community Development Services — Building Permits (alamoheightstx.gov)
- City of Alamo Heights, TX Code of Ordinances (eCode360) table of contents (Alamo Heights), quoted and re-checked
- Code Enforcements and Inspections | Bexar County, TX - Official Website, quoted and re-checked
- On-Site Sewage Facilities, quoted and re-checked
- Summary table for SF-A and SF-B residential design standards (Sec. 3-22), Oct 2021 (Alamo Heights), quoted and re-checked
- Alamo Heights Community Development Services — Planning (alamoheightstx.gov)
- Summary table for SF-A and SF-B residential design standards (Sec. 3-22), Oct 2021 (Alamo Heights), quoted and re-checked
- On-Site Sewage Facilities, quoted and re-checked
- On-Site Sewage Facilities, quoted and re-checked
- Bexar County Environmental Services (bexar.org)
Written October 14, 2026 from the rules quoted below, each taken from an official source and re-checked by an independent reviewer. This is research, not legal advice: rules change, so confirm with the office before you buy or build.